Project: 296.0074<br />

Revision: DRAFT<br />

Page 7-l<br />

IL4 Engineering, Science, and Techdogy<br />

“--” -^__ll ~-.ll__l.^<br />

April 29,1997<br />

..- ____,<br />

7. PROJECT SCFIEDULE<br />

Figure 7-l presents the schedule <strong>for</strong> the installation of the <strong>remedial</strong> system at the Navy Fuel Farm.<br />

The schedule includes tasks up to the completion of the of the <strong>report</strong>s associated with this <strong>work</strong><br />

ef<strong>for</strong>t. The schedule assumes a construction mobilization start date of 22 July 1997 which is<br />

contingent upon Navy approval of the system design and review comments received by 26 May<br />

1997. The schedule does not account, however, <strong>for</strong> delays which are not possible to project, i.e,<br />

w<strong>ea</strong>ther.<br />

Every attempt will be made to adhere to the schedule presented. Unexpected delays shall be<br />

documented and <strong>report</strong>ed to the Navy in a timely fashion. In the event that the schedule needs to<br />

be modified, EA will contact the Navy <strong>for</strong> approval of the updated schedule.<br />

NASJRB Willow Grove; Navy Fuel Farm<br />

Remedial Action .Engineering Work Plan