12.11.2012 Views

Silver Award winners - The Considerate Constructors Scheme

Silver Award winners - The Considerate Constructors Scheme

Silver Award winners - The Considerate Constructors Scheme

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2010<br />

National Site <strong>Award</strong>s<br />

This brochure lists all the 2010 National Site <strong>Award</strong> <strong>winners</strong>.<br />

For full details about all the <strong>winners</strong>, please visit the<br />

<strong>Scheme</strong>’s website www.ccscheme.org.uk and search the<br />

2010 <strong>Award</strong>s database. This information can also be found in<br />

the ‘<strong>Award</strong>s Special Edition’ of the <strong>Scheme</strong>’s Industry Image<br />

newsletter at www.ccscheme.org.uk/industry-image<br />

More than 2500 guests attended a series of 10 ceremonies in<br />

April and May, held to present the <strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong>’s<br />

2010 National Site <strong>Award</strong>s. Presented by a number of leading<br />

industry figures, 3 events took place in Manchester, 1 in<br />

Edinburgh and 6 in London. From over 7600 eligible sites,<br />

580 were selected as National Site <strong>Award</strong> <strong>winners</strong> in the categories<br />

of Gold, <strong>Silver</strong> and Bronze. One of the Gold winning sites was also<br />

honoured with the prestigious accolade of the UK’s Most <strong>Considerate</strong><br />

Site 2010, and 17 sites were recognised as runners up for this title.<br />

<strong>The</strong> <strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong>’s Annual National Site <strong>Award</strong>s<br />

have been presented every year since 1998 and are given to around<br />

the highest scoring 71/2% of sites, monitored by the <strong>Scheme</strong>, which<br />

have completed in the previous year. <strong>The</strong> <strong>Award</strong>s recognise sites’<br />

excellent standards of consideration towards their workforce, their<br />

neighbours and the environment.<br />

580 National Site <strong>Award</strong> <strong>winners</strong><br />

MOST CONSIDERATE SITE<br />

1 Most <strong>Considerate</strong> Site<br />

MOST CONSIDERATE SITE<br />

RUNNER UP<br />

63 Gold <strong>Award</strong>s<br />

173 <strong>Silver</strong> <strong>Award</strong>s<br />

17 Most <strong>Considerate</strong> Site<br />

Runners up 344 Bronze <strong>Award</strong>s


MOST CONSIDERATE SITE<br />

For full details of all the <strong>winners</strong>,<br />

visit www.ccscheme.org.uk or<br />

www.ccscheme.org.uk/industry-image<br />

MOST CONSIDERATE SITE<br />

RUNNER UP<br />

Most <strong>Considerate</strong> Site<br />

T4 Project, Beevor Court<br />

Presented to: Bryan Rooth<br />

Contractor: Clayfield Construction Ltd<br />

Client: Yorkshire Housing<br />

This project involved the construction of a support<br />

accommodation unit of a sensitive nature on a<br />

brownfield site.<br />

Despite not being easily visible to the general public,<br />

this site maintained scrupulous standards of cleanliness<br />

and overall presentation both within the site and on the<br />

boundary and surrounding areas. <strong>The</strong> total absence of<br />

obstructions or debris contributed significantly to safety<br />

levels for site operatives and visitors, and<br />

complemented extensive further safety initiatives to<br />

achieve a top score. <strong>The</strong> level of attention paid to<br />

environmental concerns was equally exemplary: bat<br />

and owl boxes were provided in the adjacent woodland<br />

and a unique habitat for slow-worms was carefully<br />

created. Energy usage, waste and the use of materials<br />

on site was also tightly controlled.<br />

<strong>The</strong> team worked with their waste contractor to<br />

facilitate a successful school visit to a waste separation<br />

plant, and assisted a local football club in clearing the<br />

ground of Japanese Knotweed. Staff welfare facilities<br />

Most <strong>Considerate</strong> Site runners up<br />

Newcastle-under-Lyme College<br />

Presented to: Ivan Gethin<br />

Contractor: BAM Construction Ltd - Midlands<br />

Client: Newcastle-under-Lyme College<br />

Chatterley Whitfield Heritage Country Park<br />

Presented to: Stoke on Trent City Council, Homes &<br />

Communities Agency and Birse Civils Ltd<br />

Contractor: Birse Civils Ltd<br />

Client: City of Stoke on Trent<br />

Guildhall Accommodation Project - North Block<br />

Presented to: Warren Glaister<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: Corporation of London<br />

Heathrow T5C<br />

Presented to: Stephen Sebborn<br />

Contractor: Carillion Building<br />

Client: BAA<br />

50-62 Eaton Square<br />

Presented to: <strong>The</strong> Bastows Project Management Team<br />

Contractor: D Bastow Ltd<br />

Client: Grosvenor Estates Ltd<br />

Norton Manor MT Workshops<br />

Presented to: Peter Haig and Ivan Dover<br />

Contractor: Debut Services (South West) Ltd<br />

Client: Defence Estates<br />

CCC Middlewich<br />

Presented to: Keith Huntington<br />

Contractor: GB Building Solutions Ltd<br />

Client: Avantage Cheshire Ltd<br />

St Catherine's Car Park, Fowey<br />

Presented to: Brendon Cocking and Craig Kendall<br />

Contractor: Gilbert & Goode Ltd<br />

Client: Ocean Group Ltd<br />

St Leger Homes of Doncaster – Conisbrough<br />

Presented to: Derek McDonald<br />

Contractor: Henry Boot Construction (UK) Ltd<br />

Client: St Leger Homes of Doncaster ltd<br />

were also of an exceptionally high standard, and active<br />

participation in the <strong>Scheme</strong> was clearly communicated<br />

to both staff and the community.<br />

This was a relatively small site, but one which was truly<br />

committed to every aspect of considerate site practices.<br />

Described by the <strong>Scheme</strong>'s Monitor as “<strong>The</strong> best I have<br />

ever seen”, it demonstrated what can be achieved by a<br />

Site Manager with limited resources and set a new<br />

benchmark for considerate construction.<br />

Structural Repairs to Airey Houses,<br />

Catcliffe & Ulley, Rotherham<br />

Presented to: Mick Wake<br />

Contractor: Henry Boot Construction (UK) Ltd<br />

Client: Rotherham Metropolitan Borough Council<br />

Victoria & Albert Museum<br />

Presented to: Andy Lambelle<br />

Contractor: Holloway White Allom Ltd<br />

Client: Victoria & Albert Museum<br />

TFL Palestra Building<br />

Presented to: ISG Project Team<br />

Contractor: ISG InteriorExterior<br />

Client: Transport for London<br />

CEIR - Torbay Hospital<br />

Presented to: Mike Mackey<br />

Contractor: Kier Western<br />

Client: South Devon Healthcare<br />

Blists Hill Victorian Town<br />

Presented to: John McStay<br />

Contractor: Mansell Construction Services Ltd<br />

Client: Ironbridge Gorge Museum Trust<br />

New Construction & Engineering Centre, South<br />

Eastern Regional College, Newtownards Campus<br />

Presented to: Mascott Construction Contract Team<br />

Contractor: Mascott Construction<br />

Client: South Eastern Regional College<br />

Aberdeen Union Square<br />

Presented to: Craig Giblett<br />

Contractor: Miller Construction (UK) Ltd<br />

Client: Hammerson plc<br />

Islington Contract 29<br />

Presented to: Steve Green<br />

Contractor: Mulalley & Co Ltd<br />

Client: Homes for Islington


Gold <strong>Award</strong> <strong>winners</strong><br />

A421 Improvements, M1 Junction 13 to Bedford<br />

Presented to: A421 Improvements<br />

Contractor: Balfour Beatty Major Projects<br />

Client: Highways Agency<br />

Tameside Hospital PFI<br />

Presented to: Tony Dowd<br />

Contractor: Balfour Beatty Northern Batch Hospitals<br />

Joint Venture<br />

Client: Consort Healthcare<br />

1 Millharbour<br />

Presented to: Alan Edmunds<br />

Contractor: Ballymore Properties Ltd<br />

Client: Ballymore Properties Ltd<br />

South Thames College<br />

Presented to: Andy Lock<br />

Contractor: BAM Construction Ltd - London<br />

Client: South Thames College<br />

Newcastle-under-Lyme College<br />

Presented to: Ivan Gethin<br />

Contractor: BAM Construction Ltd - Midlands<br />

Client: Newcastle-under-Lyme College<br />

Q3 Academy<br />

Presented to: John Cooper<br />

Contractor: BAM Construction Ltd - Midlands<br />

Client: Q3 Academy<br />

Mann Island Mixed Use Development<br />

Presented to: Neil Millward and Lee Bibby<br />

Contractor: BAM Construction Ltd - North West<br />

Client: Countryside Neptune LLP<br />

Fountain North Ltd<br />

Presented to: Malcolm Boyd and Kenneth Hutton<br />

Contractor: BAM Construction Ltd - Scotland<br />

Client: Fountain North Ltd<br />

A34 Alderley Edge & Nether Alderley Bypass<br />

Presented to: Cheshire East Council and Birse Civils Ltd<br />

Contractor: Birse Civils Ltd<br />

Client: Cheshire East Council<br />

Ironstone PIW at Lawley<br />

Presented to: Taylor Wimpey, Barratt, Persimmon and<br />

Birse Civils Ltd<br />

Contractor: Birse Civils Ltd<br />

Client: George Wimpey Major Projects/Persimmon<br />

Homes (West Midlands) Ltd/Barratt West Midlands<br />

Glencorse Water Treatment Works<br />

Presented to: Andy Old<br />

Contractor: Black & Veatch<br />

Client: Scottish Water<br />

Athletes Village, Stratford City<br />

Presented to: Damian Leydon<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: Olympic Delivery Authority<br />

Media City UK<br />

Presented to: John Hyne<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: Peel Holdings plc<br />

DS3 Project<br />

Presented to: Michael Morrissey<br />

Contractor: Canary Wharf Contractors Ltd<br />

Client: Canary Wharf Group<br />

New Office and Residential Development,<br />

Temple Back, Bristol<br />

Presented to: Steve Babbage and Ian Eggleton<br />

Contractor: Carillion Building<br />

Client: UK and EI with Westmark<br />

Queen Alexandra Hospital<br />

Presented to: Graham Aubrey<br />

Contractor: Carillion Building<br />

Client: Portsmouth Hospitals NHS Trust<br />

A34 Wolvercote Viaduct Replacement <strong>Scheme</strong><br />

Presented to: Darren Dobson<br />

Contractor: Costain Ltd<br />

Client: Highways Agency<br />

Church Village Bypass x2<br />

Presented to: Church Village Bypass Team<br />

Contractor: Costain Ltd<br />

Client: Rhondda Cynon Taf County Borough Council<br />

Lewisham Schools<br />

Presented to: Clive Kraus<br />

Contractor: Costain Ltd<br />

Client: Lewisham Building Schools for the Future LEP Ltd<br />

M27 J3-4 Widening<br />

Presented to: Craig Reade<br />

Contractor: Costain Ltd<br />

Client: Highways Agency<br />

St Germans Pumping Station<br />

Presented to: Ritchie Burcombe<br />

Contractor: Costain Ltd<br />

Client: Middle Level Commissioners<br />

Sites E & F, New England Quarter<br />

Presented to: Keith Benge<br />

Contractor: Denne Construction Ltd<br />

Client: Bio Regional Quintian LLP<br />

Belfast Sewers Project<br />

Presented to: John McReynolds<br />

Contractor: Farrans (Construction) Ltd<br />

Client: Northern Ireland Water<br />

William Wake House, Residential Mental Health<br />

Facility, St Andrew’s Healthcare<br />

Presented to: David Sizer<br />

Contractor: GB Building Solutions Ltd<br />

Client: St Andrew's Healthcare<br />

Bolsover Street Residential<br />

Presented to: Gerard Lonergan<br />

Contractor: John Sisk & Son Ltd<br />

Client: Bolsover Street Ltd<br />

Forth Valley Royal Hospital<br />

Presented to: Lindsay McGibbon<br />

Contractor: Laing O'Rourke Scotland Ltd<br />

Client: NHS Forth Valley<br />

Loch Leven Community Campus and<br />

Kinross High School<br />

Presented to: John Ritchie<br />

Contractor: Laing O'Rourke Scotland Ltd<br />

Client: Axiom Education (Perth & Kinross) Ltd<br />

Doddinghurst Primary School<br />

Presented to: Gerry Toohey<br />

Contractor: Lakehouse<br />

Client: Essex County Council<br />

Park House Enabling Works<br />

Presented to: Peter Savoy<br />

Contractor: Mace<br />

Client: Land Securities<br />

Royal Victoria Hospital, Phase 2B<br />

Presented to: John Roden<br />

Contractor: McLaughlin & Harvey Ltd<br />

Client: Belfast Health & Social Care Trust<br />

<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong> 2010 National Site <strong>Award</strong>s | 3


Gold <strong>Award</strong> <strong>winners</strong> <strong>Silver</strong> <strong>Award</strong> <strong>winners</strong><br />

One Waterloo Street<br />

Presented to: Ryan Broadley<br />

Contractor: Miller Construction (UK) Ltd<br />

Client: Halladale Ltd<br />

Pinderfields Hospital JV<br />

Presented to: Martin Buckley<br />

Contractor: PPHJV - Pinderfields and Pontefract<br />

Hospitals Joint Venture<br />

Client: <strong>The</strong> Mid-Yorkshire Hospitals NHS Trust<br />

Cadiz Court<br />

Presented to: Roy Buck<br />

Contractor: Rydon Construction Ltd<br />

Client: Metropolitan Home Ownership<br />

St Austell Town Centre Redevelopment<br />

Presented to: Sir Robert McAlpine<br />

Contractor: Sir Robert McAlpine Ltd<br />

Client: White River Development<br />

Watermark Place<br />

Presented to: Tony Cockerill<br />

Contractor: Sir Robert McAlpine Ltd<br />

Client: Watermark Place Oxford One Investment Ltd<br />

Skanska Walsall Joint Venture, Walsall Hospital<br />

Presented to: Colin Davidson<br />

Contractor: Skanska<br />

Client: Walsall Hospitals NHS Trust<br />

Skanska HMP Dovegate Houseblock Expansion<br />

Presented to: Simon Caron<br />

Contractor: Skanska Construction UK Ltd<br />

Client: Serco Ltd<br />

St Botolphs<br />

Presented to: Ian Shinn<br />

Contractor: Skanska Private<br />

Client: Minerva plc<br />

Imperial Wharf<br />

Presented to: Paul Stedman<br />

Contractor: St George Central London Ltd<br />

Client: St George Central London Ltd<br />

Circle Bath<br />

Presented to: Martin Thomas and Simon Buck<br />

Contractor: Taylor Woodrow Construction<br />

Client: Health Properties (Bath) Ltd<br />

Hungate Phase 1, York<br />

Presented to: Ray Atkinson<br />

Contractor: Taylor Woodrow, Vinci Construction UK Ltd<br />

Client: Hungate (York) Regeneration Ltd<br />

Rugby Western Relief Road<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: Warwickshire CC/Carillion<br />

Client: Warwickshire County Council/Carillion<br />

Stratford City Development<br />

Presented to: Derek Bellringer<br />

Contractor: Westfield Shoppingtowns Ltd<br />

Client: Stratford City Development Ltd<br />

University of Wales, Newport: City Campus<br />

Presented to: Ian Knight and Kanji Kerai<br />

Contractor: Willmott Dixon Construction Ltd<br />

Client: University of Wales<br />

‘‘’’<br />

<strong>The</strong>re is no doubt that the <strong>Considerate</strong> <strong>Constructors</strong><br />

<strong>Scheme</strong> is a huge influence in raising the standards<br />

in these difficult times. My congratulations to<br />

all the <strong>winners</strong>.<br />

James Wates, Chairman, UK Contractors’ Group<br />

Calderdale Highways Term Maintenance<br />

Presented to: Stuart Nichols<br />

Contractor: Amey LG Ltd<br />

Client: Calderdale Metropolitan Borough Council<br />

M6 Hard Shoulder Strengthening Junction 14-16<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: Amey plc<br />

Client: Highways Agency<br />

Foreshore & Albemarle<br />

Presented to: Neil Cornish and Kim Georgeson<br />

Contractor: Apollo Housing<br />

Client: Hyde Housing Association<br />

London & Quadrant Group<br />

Kitchen & Bathroom Programme<br />

Presented to: Steve Finch, Neil Quelch, Chris<br />

Williams, Caroline Mann and Mohamed Bangura<br />

Contractor: Apollo Housing<br />

Client: London and Quadrant Group<br />

A3/S16 Lawrence Avenue<br />

Presented to: James Darker and Lewis Melisi<br />

Contractor: Apollo in Partnership<br />

Client: Ascham Homes Ltd<br />

A3/S26 Higham Hill Various<br />

Presented to: Ben Guszpit and James Darker<br />

Contractor: Apollo in Partnership<br />

Client: Ascham Homes Ltd<br />

Attlee Terrace, Prospect Hill, London E17 3EH<br />

Presented to: Andrew Gratton<br />

Contractor: Apollo in Partnership<br />

Client: Ascham Homes Ltd<br />

Bulford Project<br />

Presented to: Bulford Project<br />

Contractor: Aspire Defence Capital Works<br />

Client: Project Allenby/Connaught<br />

Tidworth Project<br />

Presented to: Tidworth Project<br />

Contractor: Aspire Defence Capital Works<br />

Client: Project Allenby/Connaught<br />

A3 Hindhead<br />

Presented to: Paul Hoyland<br />

Contractor: Balfour Beatty Civil Engineering Ltd<br />

Client: Highways Agency<br />

New Victoria Hospital, Glasgow<br />

Presented to: Alasdair Fernie<br />

Contractor: Balfour Beatty Construction Scottish<br />

& Southern Ltd<br />

Client: Greater Glasgow Health Board<br />

Contracts 5O, 5P & 5Q Alderville Road<br />

Presented to: Bala Buvanendra<br />

Contractor: Balfour Beatty Refurbishment Ltd<br />

Client: Hammersmith & Fulham Homes<br />

Highbury Grove & Samuel Rhodes School<br />

Presented to: Robert Holmes<br />

Contractor: Balfour Beatty Construction Scottish<br />

& Southern Ltd<br />

Client: Transform Schools (Birmingham) Ltd<br />

Slingfield Mill<br />

Presented to: Robert Bassett<br />

Contractor: BAM Construction Ltd - Midlands<br />

Client: Henderson Global Investors<br />

Leeds City College Keighley Campus<br />

Presented to: Jason Pink<br />

Contractor: BAM Construction Ltd - North East<br />

Client: Leeds City College Keighley Campus.


Redcar & Cleveland College<br />

Presented to: Richard Tyler<br />

Contractor: BAM Construction Ltd - North East<br />

Client: Redcar and Cleveland College<br />

School of Earth & Environment<br />

Presented to: Geoff Wright<br />

Contractor: BAM Construction Ltd - North East<br />

Client: University of Leeds<br />

Selby College<br />

Presented to: Paul Nicholson<br />

Contractor: BAM Construction Ltd - North East<br />

Client: Selby College<br />

Bolton Community College<br />

Presented to: Paul Harris<br />

Contractor: BAM Construction Ltd - North West<br />

Client: Bolton Community College<br />

John Radcliffe Hospital, Cardiac<br />

Presented to: Alec Carr<br />

Contractor: BAM Construction Ltd - South East<br />

Client: Oxford Radcliffe Hospitals NHS Trust<br />

3 Assembly Square, Cardiff Bay<br />

Presented to: Andy Witnall<br />

Contractor: BAM Construction Ltd - Western<br />

Client: Cardiff Bay GP Ltd<br />

Royal Albert Memorial Museum (RAMM)<br />

Presented to: Nigel Harris<br />

Contractor: BAM Construction Ltd - Western<br />

Client: Exeter City Council<br />

Ysbyty Ystrad Fawr<br />

Presented to: Andrew Cavil<br />

Contractor: BAM Construction Ltd - Western<br />

Client: Aneurin Bevan Health Board<br />

A486 Llandysul Bypass<br />

Presented to: Lee O'Brien and Ray Jones<br />

Contractor: BAM Nuttall Ltd<br />

Client: Ceredigion County Council<br />

Broadland Flood Alleviation Project<br />

Compartment 11 Bure Phase 1 Flood Defences<br />

Presented to: Dan Russell<br />

Contractor: BAM Nuttall Ltd<br />

Client: Broadlands Environmental Services Ltd<br />

Cambridgeshire Guided Busway<br />

Presented to: Simon Whalley<br />

Contractor: BAM Nuttall Ltd<br />

Client: Cambridgeshire County Council<br />

Norlands Square / Holland Road Flood<br />

Alleviation <strong>Scheme</strong><br />

Presented to: Chris Smalley<br />

Contractor: Barhale Construction plc<br />

Client: Thames Water Utilities Ltd<br />

Olympic Park, Primary Foul Drainage<br />

Presented to: Shane Gorman<br />

Contractor: Barhale Construction plc<br />

Client: Olympic Delivery Authority<br />

Mayday House<br />

Presented to: Danny Ellis and Toni Byrne-Price<br />

Contractor: Berkeley First Ltd<br />

Client: Berkeley First Ltd<br />

Chelsea Bridge Wharf Phase 5<br />

Presented to: Sebastian Czajka<br />

Contractor: Berkeley Homes<br />

(Urban Renaissance) Ltd<br />

Client: Berkeley Homes (Urban Living) Ltd<br />

B1115 Relief Road Stowmarket<br />

Presented to: Birse Civils Ltd & Suffolk County Council<br />

Contractor: Birse Civils Ltd<br />

Client: Suffolk County Council<br />

Carlisle Northern Development Route<br />

Presented to: Connect Roads Ltd, Cumbria County<br />

Council and Birse Civils Ltd<br />

Contractor: Birse Civils Ltd<br />

Client: Connect Roads Ltd for Cumbria County Council<br />

Stanground Bypass Stage 2<br />

Presented to: Birse Civils Ltd & Persimmon Homes<br />

Contractor: Birse Civils Ltd<br />

Client: Persimmon Homes West Midlands<br />

Central Area Coast Protection <strong>Scheme</strong><br />

Presented to: <strong>The</strong> Central Area Coast Protection<br />

Project Team<br />

Contractor: Birse Coastal<br />

Client: Blackpool Council<br />

Stallingborough Sea Defences<br />

Presented to: <strong>The</strong> Stallingborough Sea Defences<br />

Project Team<br />

Contractor: Birse Coastal<br />

Client: Environment Agency<br />

240 Regent Street (Formerly Dickins & Jones)<br />

Presented to: Bovis Lend Lease 240 Regent Street Team<br />

Contractor: Bovis Lend Lease<br />

Client: Shearer Property Group & Delancey<br />

Accrington Academy<br />

Presented to: Accrington Academy Site Team<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: Lancashire County Council<br />

BBC West One Project Phase 2<br />

Presented to: Graham Stark<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: Land Securities<br />

Liverpool John Lennon Airport MSCP and Hotel<br />

Presented to: Sarah Griffith<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: Liverpool John Lennon Airport<br />

New Court<br />

Presented to: John O'Sullivan<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: Stanhope plc / NM Rothschild Ltd<br />

'One New Change'<br />

Presented to: One New Change Team<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: Land Securities<br />

St David's 2<br />

Presented to: Nick Wylie<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: St David's Partnership<br />

Greater Peterborough Health<br />

Investment Plan (Acute)<br />

Presented to: Peter Beauchamp<br />

Contractor: Brookfield Construction (UK) Ltd<br />

Client: Progress Health (Peterborough) plc<br />

Greater Peterborough Health Investment Plan<br />

(City Care Centre)<br />

Presented to: Nick Hull<br />

Contractor: Brookfield Construction (UK) Ltd<br />

Client: Progress Health (Peterborough) plc<br />

Tyntesfield House<br />

Presented to: Tyntesfield Team<br />

Contractor: C S Williams (Taunton) Ltd<br />

Client: <strong>The</strong> National Trust<br />

BP2 Fitout<br />

Presented to: Alec Vallintine and Jon Picksley<br />

Contractor: Canary Wharf Contractors Ltd<br />

Client: Canary Wharf Group<br />

Riverside South<br />

Presented to: Steve Prater and Pelham Dobson<br />

Contractor: Canary Wharf Contractors Ltd<br />

Client: Canary Wharf Group<br />

Chadderton Health & Well-Being Centre<br />

Presented to: Paul Doyle<br />

Contractor: Carillion Building<br />

Client: Community 1st Oldham Ltd<br />

IBC - MPC<br />

Presented to: Tony Coyle<br />

Contractor: Carillion Building<br />

Client: Olympic Delivery Authority<br />

LIFT Hartlepool Community Health Centre<br />

Presented to: John Tweddell and Leanne Swainston<br />

Contractor: Carillion Building<br />

Client: Hartlepool Primary Care Trust<br />

MMA Increment 1 Whittington Barracks<br />

Presented to: David Bowdley<br />

Contractor: Carillion Building<br />

Client: Defence Estates<br />

Northwood Development Project<br />

Presented to: Chris Wallace<br />

Contractor: Carillion Building<br />

Client: Ministry of Defence<br />

RAF Linton on Ouse - New Air Traffic Control Tower<br />

Presented to: Project Team<br />

Contractor: Carillion Building<br />

Client: Defence Estates<br />

Kendal, Riverside Place<br />

Presented to: Mark Conway<br />

Contractor: Carillion Civil Engineering<br />

Client: Kendal Riverside Development Ltd<br />

Walpole Process Upgrade<br />

Presented to: Andy Paton<br />

Contractor: Carillion Civil Engineering<br />

Client: Essex and Suffolk Water<br />

M4 Widening - Junction 29 to 32<br />

Presented to: Mike Park<br />

Contractor: Carillion Infrastructure<br />

Client: Welsh Assembly Government<br />

M6 Extension Carlisle to Guardsmill<br />

Presented to: Chris Hayton<br />

Contractor: Carillion Infrastructure<br />

Client: Highways Agency<br />

CLM Logistics & Security Team (Olympic Park)<br />

Presented to: CLM Logistics and Security Team<br />

Contractor: CLM Logistics and Security Team<br />

Client: Olympic Delivery Authority<br />

3 Shires Kingsway<br />

Presented to: Mike Thomson<br />

Contractor: Costain Ltd<br />

Client: Mentac Health NHS Services<br />

A40 Penblewin to Slebech Park Improvement<br />

Presented to: A40 Team - Penblewin to Slebech Park<br />

Improvement<br />

Contractor: Costain Ltd<br />

Client: Welsh Assembly Government<br />

<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong> 2010 National Site <strong>Award</strong>s | 5


<strong>Silver</strong> <strong>Award</strong> <strong>winners</strong><br />

Glasshoughton Link Road<br />

Presented to: Andrew Langley<br />

Contractor: Costain Ltd<br />

Client: Wakefield Metropolitan District Council<br />

University of Worcester City Campus Residences<br />

Presented to: <strong>The</strong> Costain Team<br />

Contractor: Costain Ltd<br />

Client: Worcester University<br />

Victoria Park, Colwyn Bay<br />

Presented to: Paul Hunter<br />

Contractor: Costain Ltd<br />

Client: Dwr Cymru Welsh Water<br />

Fortuna Park<br />

Presented to: Charlie Barbara<br />

Contractor: Countryside Properties (Southern) Ltd<br />

Client: Countryside Annington (Frith Lane) Ltd<br />

Tavistock Community Football Club<br />

Presented to: Steve Maw and Kelvin Evans<br />

Contractor: Dawnus Construction Ltd<br />

Client: Tavistock Community Football Club<br />

EnterpriseMouchel Harrow Depot<br />

Presented to: Darren O'Connor and Dennis Solomon<br />

Contractor: EnterpriseMouchel<br />

Client: Harrow Council<br />

Bodleian and Quadrangle Railings<br />

Presented to: William Jones<br />

Contractor: Eura Conservation Ltd<br />

Client: Oxford University Estate Directorate<br />

Grand Ocean<br />

Presented to: Kevin Moon<br />

Contractor: Explore Living South East<br />

Client: Explore Living plc<br />

Arecleoch Windfarm<br />

Presented to: Project Team<br />

Contractor: Farrans (Construction) Ltd<br />

Client: Scottish Power Renewables<br />

Belfast Streets Ahead Phase 1<br />

Presented to: Frank Hennity<br />

Contractor: Farrans (Construction) Ltd<br />

Client: Department of Social Development<br />

Templepatrick Primary School<br />

Presented to: Stephen Foster<br />

Contractor: Farrans (Construction) Ltd<br />

Client: North Eastern Education & Library Board<br />

Thaxton Mill Gardens Phase 3<br />

Presented to: Gareth McKnight<br />

Contractor: Farrans (Construction) Ltd<br />

Client: Farrans Homes<br />

Beeston, Phase 5<br />

Presented to: Mick Lomas<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Health & Environment Action Services<br />

Stream 2 Foxhill<br />

Presented to: Andy Mann<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Sheffield Homes<br />

Helena Kitchens Phase 13<br />

Presented to: Barry Fallows<br />

Contractor: Frank Rogers Building Contractors<br />

Client: Helena Partnerships Ltd<br />

Thornton Junior School<br />

Presented to: John Dudley, Leanne Burden, David<br />

Tomlin and Andrew Fleming<br />

Contractor: G F Tomlinson Birmingham Ltd<br />

Client: Birmingham City Council<br />

St Pancras Chambers<br />

Presented to: Bob Ryan<br />

Contractor: Galliford Try Construction (South) Ltd<br />

Client: Manhattan Loft Corporation Ltd<br />

Northfields, Turner Road<br />

Presented to: David Wright<br />

Contractor: Galliford Try Partnerships Ltd<br />

Client: Sentient Ventures LLP<br />

Malvins Close Primary School<br />

Presented to: Harry Gallon and Dave Benson<br />

Contractor: GB Building Solutions Ltd<br />

Client: Northumberland County Council<br />

Harperbury Hospital (CAMHS Unit)<br />

Presented to: Mick Brotherton, Roderick Scott,<br />

Martin Minchev and Mark Dash<br />

Contractor: Geoffrey Osborne Ltd<br />

Client: Hertfordshire Partnership NHS Foundation Trust<br />

Rugby Multi-storey Car Park<br />

Presented to: Paul Reader<br />

Contractor: Geoffrey Osborne Ltd<br />

Client: Network Rail<br />

St Agnes<br />

Presented to: Brendon Leech, Steve Ridge and<br />

Mick Coates<br />

Contractor: Gilbert & Goode Ltd<br />

Client: Ocean Group Ltd<br />

Pond Park Primary School<br />

Presented to: Victor Hamilton<br />

Contractor: Graham Construction<br />

Client: South Eastern Education & Library Board<br />

St Leger Homes of Doncaster - Scawsby<br />

Presented to: Derek McDonald<br />

Contractor: Henry Boot Construction (UK) Ltd<br />

Client: St Leger Homes of Doncaster Ltd<br />

Fit-Out Works, Sports Park, <strong>The</strong> Amateur<br />

Swimming Association<br />

Presented to: Mark Greasby<br />

Contractor: Herbert Baggaley Construction Ltd<br />

Client: Amateur Swimming Association<br />

Sports Park, Loughborough University<br />

Presented to: Mark Greasby<br />

Contractor: Herbert Baggaley Construction Ltd<br />

Client: Loughborough University<br />

Combe Down<br />

Presented to: Robert Narbett<br />

Contractor: Hydrock Contracting Ltd<br />

Client: Bath & North East Somerset Council<br />

Caxton House<br />

Presented to: Shane Clarke<br />

Contractor: Ibex Interiors Ltd<br />

Client: Department of Work and Pensions<br />

Crown House<br />

Presented to: Steve Kitchen<br />

Contractor: ISG Interior Exterior plc<br />

Client: UKI Kingsway<br />

Marshall Street Regeneration<br />

Presented to: Alan Mason<br />

Contractor: ISG InteriorExterior<br />

Client: Marshall Street Regeneration Ltd<br />

Sandon Valley House, East Hanningfield<br />

Presented to: David Afford<br />

Contractor: ISG Jackson<br />

Client: Essex & Suffolk Water<br />

Suffolk One<br />

Presented to: Steven Yanusauskas<br />

Contractor: ISG Jackson<br />

Client: Suffolk County Council<br />

Sainsbury's Store, Pulborough<br />

Presented to: Terry Heath<br />

Contractor: ISG Pearce<br />

Client: Sainsbury's Supermarkets Ltd<br />

Cloth Hall Court, Leeds<br />

Presented to: Anthony Mitchell and Roy Ward<br />

Contractor: ISG Regions<br />

Client: Highcross Strategic Advisers Ltd<br />

Cypress Road, Kendray<br />

Presented to: Craig Hughes<br />

Contractor: Keepmoat Homes Ltd<br />

Client: Keepmoat Homes<br />

Mid Kent College, Lower Lines<br />

Presented to: Chris Burden, Jim Batty and the<br />

MKC Project Team<br />

Contractor: Kier Build<br />

Client: Mid Kent College<br />

Academic Building East<br />

Presented to: Adrian Cooper<br />

Contractor: Kier Eastern<br />

Client: University of East Anglia<br />

Reepham High School<br />

Presented to: William Hagan<br />

Contractor: Kier Eastern<br />

Client: Reepham High School<br />

<strong>The</strong> Old Royal Infirmary Building<br />

Presented to: Ron Hughes<br />

Contractor: Kier North West<br />

Client: University of Liverpool<br />

Lower Shenley, Phase 2<br />

Presented to: Ron Hobbs<br />

Contractor: Kier Partnership Homes<br />

Client: Bournville Village Trust<br />

One Reading Central<br />

Presented to: James Carpenter<br />

Contractor: Kier Regional<br />

Client: Kier Property<br />

Mountbatten Centre<br />

Presented to: Benn Hunter, James Ashley and<br />

Andrew Oliver<br />

Contractor: Kier Southern<br />

Client: Broadwater Leisure Ltd<br />

St Georges C of E Foundation School<br />

Presented to: Darren Chandler<br />

Contractor: Kier Southern<br />

Client: LEP<br />

St James Hospital<br />

Presented to: Andrew Oliver<br />

Contractor: Kier Southern<br />

Client: Portsmouth City Primary Care Trust<br />

‘‘’’<br />

When I was writing my report in 1994 I went out of<br />

my way to stress that best practice was very<br />

important in the construction industry. I am<br />

delighted to support the <strong>Considerate</strong> <strong>Constructors</strong><br />

<strong>Scheme</strong> which is doing such a very good job.<br />

Sir Michael Latham


<strong>Silver</strong> <strong>Award</strong> <strong>winners</strong><br />

Link Building and Student Union<br />

Presented to: Simon Parsons<br />

Contractor: Kier Western<br />

Client: University of Plymouth<br />

Peninsula Dental School<br />

Presented to: Andrew Nixson<br />

Contractor: Kier Western<br />

Client: Plymouth Hospitals NHS Trust<br />

M4 JCT 14-15 Baydon; Major Maintenance<br />

Presented to: Merv Bowd<br />

Contractor: Lafarge Contracting<br />

Client: Highways Agency<br />

NDC1<br />

Presented to: Allan Irvine<br />

Contractor: Laing O'Rourke / Crown House<br />

Technologies<br />

Client: Digital Realty Trust<br />

<strong>The</strong> Co-Operative Academy<br />

Presented to: Graham Fenton<br />

Contractor: Laing O'Rourke Construction North Ltd<br />

Client: Manchester City Council<br />

Imperial College - Eastside Student Accommodation<br />

Presented to: Nigel Bunce<br />

Contractor: Laing O'Rourke Construction South Ltd<br />

Client: Imperial College<br />

Station Plaza, Hastings College<br />

Presented to: Kevin Watts<br />

Contractor: Laing O'Rourke Construction South Ltd<br />

Client: John Laing Projects & Developments Ltd<br />

West Lothian Civic Centre<br />

Presented to: Alistair Johnston<br />

Contractor: Laing O'Rourke Scotland Ltd<br />

Client: West Lothian Council<br />

Cardiff City Stadium<br />

Presented to: Paul Norman<br />

Contractor: Laing O'Rourke Wales and West<br />

Client: Cardiff City Stadium Ltd<br />

Corsham Development Project<br />

Presented to: Nicholas Featherstone<br />

Contractor: Laing O'Rourke Wales and West<br />

Client: Inteq Services Ltd<br />

Southmead Hospital P21 Enabling Works<br />

Presented to: Douglas Moore<br />

Contractor: Laing O'Rourke Wales and West<br />

Client: North Bristol NHS Trust<br />

Haearn Mawr<br />

Presented to: Mike Walker, Nicole Barnes and<br />

Kevin White<br />

Contractor: Leadbitter<br />

Client: Leadbitter Homes<br />

Hanbury Grove<br />

Presented to: Kevin Beckett, Steve Ellaway, Simon<br />

Thomas and Nicole Barnes<br />

Contractor: Leadbitter<br />

Client: Leadbitter Homes/Melin Homes<br />

New Bettws High School<br />

Presented to: Aeron Thomas, Simon Owen<br />

and Mike Little<br />

Contractor: Leadbitter<br />

Client: Newport City Council<br />

Camp Hill Phase 2<br />

Presented to: Adam Cooper and Tim Harrison<br />

Contractor: Lovell Partnerships Ltd<br />

Client: Pride in Camphill<br />

Dunster Place<br />

Presented to: Carl Deakin and Tim Harrison<br />

Contractor: Lovell Partnerships Ltd<br />

Client: Jephson Housing Association<br />

Gloucester City Homes<br />

Presented to: Neil Turner and Sandra Shiner<br />

Contractor: Lovell Partnerships Ltd<br />

Client: Gloucester City Homes<br />

Year 2 SCA10<br />

Presented to: Peter Hampton<br />

Contractor: Lovell Partnerships Ltd<br />

Client: Homes for Haringey Ltd<br />

Teddington School Project<br />

Presented to: John Fraser<br />

Contractor: Mace Plus Ltd<br />

Client: London Borough of Richmond Upon Thames<br />

Belvedere Academy<br />

Presented to: Mark Parker<br />

Contractor: Mansell Construction Services Ltd<br />

Client: GDST Academy Trust Board<br />

Crosby Lakeside Adventure Centre<br />

Presented to: Steve Wimpenny<br />

Contractor: Mansell Construction Services Ltd<br />

Client: Sefton Metropolitan Borough Council<br />

Chapel Road/Marine Parade Road Safety<br />

Improvement - Worthing<br />

Presented to: Nigel Steer<br />

Contractor: May Gurney Ltd<br />

Client: WSCC Customers & Communities<br />

North Leamington School Project<br />

Presented to: Mark Alker<br />

Contractor: Miller Construction (UK) Ltd<br />

Client: Warwickshire County Council<br />

University of Brighton<br />

Presented to: Clive Lavington<br />

Contractor: Miller Construction (UK) Ltd<br />

Client: University of Brighton<br />

222/236 Grays Inn Road<br />

Presented to: Stephen Jones<br />

Contractor: MITIE Interiors Ltd<br />

Client: TelerealTrillium<br />

Harrop Fold School<br />

Presented to: Paul Heald<br />

Contractor: Morgan Ashurst plc<br />

Client: Hochtief Developments<br />

Thames Water Ring Main Extension-Brixton to<br />

Honor Oak. Contract 4DCF/A1<br />

Presented to: David Brown<br />

Contractor: Morgan Est plc<br />

Client: Thames Water Utilities Ltd<br />

Cawood & Ryther<br />

Presented to: Mike Entwistle of Morrison<br />

Construction and Adrian Millward of the<br />

Environment Agency<br />

Contractor: Morrison Construction<br />

Client: Environment Agency<br />

Hackney Street Properties<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: Mulalley & Co Ltd<br />

Client: Hackney Homes<br />

Watford Community Housing Trust x2<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: Mulalley & Co Ltd<br />

Client: Watford Community Housing Trust<br />

Blackpool Coastal Housing, Energy Efficient<br />

Heating and Electrical Upgrades<br />

Presented to: Aaron Mullan and Wayne Lynchey<br />

Contractor: Read and Errington<br />

Client: Blackpool Coastal Homes<br />

Sainsbury's Supermarkets Ltd -<br />

Chichester Extension<br />

Presented to: John Wilson<br />

Contractor: RG Group<br />

Client: Sainsbury's Supermarkets Ltd<br />

St Paul's Academy<br />

Presented to: Gareth Phillips<br />

Contractor: Rydon Construction Ltd<br />

Client: St Paul's Academy Trust<br />

<strong>The</strong> Open University Catering Hub<br />

Presented to: Iain Waterman<br />

Contractor: SDC Builders Ltd<br />

Client: <strong>The</strong> Open University<br />

Rockliffe Hall Hotel and Golf Course<br />

Presented to: Neil Matthias<br />

Contractor: Shepherd Construction Ltd<br />

Client: Rockliffe Hall Ltd<br />

PHP - Safe as Houses<br />

Presented to: <strong>The</strong> Electrical Department of Signpost<br />

Services Ltd<br />

Contractor: Signpost Services Ltd<br />

Client: Poole Housing Partnership Ltd<br />

New Tesco Store, Litherland<br />

Presented to: Nigel Standage<br />

Contractor: Simons Group<br />

Client: Tesco Stores Ltd<br />

West Jesmond Primary School<br />

Presented to: Lee Wayper<br />

Contractor: Sir Robert McAlpine Ltd<br />

Client: Newcastle City Council<br />

Reshaping Health Services Southern Derbyshire<br />

Presented to: Martin Quaid<br />

Contractor: Skanska<br />

Client: South Derbyshire Acute Hospitals<br />

Kings Mill Hospital<br />

Presented to: Skanska Central Nottinghamshire J.V.<br />

Contractor: Skanska Central Nottinghamshire J.V.<br />

Client: Central Nottinghamshire Hospitals plc<br />

University of Plymouth<br />

Presented to: Dean Womack<br />

Contractor: South West Highways Ltd<br />

Client: University of Plymouth<br />

Battersea Reach Block 4<br />

Presented to: Chris Wyeth<br />

Contractor: St George South London Ltd<br />

Client: St George South London Ltd<br />

Parkwest<br />

Presented to: Sean Chappell<br />

Contractor: St George West London Ltd<br />

Client: St George West London Ltd<br />

Queen Mary's Place<br />

Presented to: Bob Rosenberger<br />

Contractor: St James Group<br />

Client: St James Developments<br />

Bridge Street<br />

Presented to: Richard Farmer<br />

Contractor: Staffordshire Highways<br />

Client: Staffordshire County Council<br />

<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong> 2010 National Site <strong>Award</strong>s | 7


<strong>Silver</strong> <strong>Award</strong> <strong>winners</strong><br />

Terminal 4 Check-In WorksTerminal 4 Check-In<br />

Extension & Refurbishment Works<br />

Presented to: Colin Howell<br />

Contractor: Taylor Woodrow Construction<br />

Client: BAA<br />

R135: Wigmore Viaduct - Concrete Repairs and<br />

Cathodic Protection<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: <strong>The</strong> Construction Management<br />

Framework<br />

Client: Highways Agency<br />

Birmingham Decent Homes Structural<br />

Presented to: Roger Martin<br />

Contractor: Thomas Vale Construction plc<br />

Client: Birmingham City Council<br />

Rocklands SEN School<br />

Presented to: Simon Sparkes<br />

Contractor: Thomas Vale Construction plc<br />

Client: Staffordshire County Council<br />

City Library Newcastle<br />

Presented to: Craig Davison<br />

Contractor: Tolent Construction Ltd<br />

Client: Kajima Ltd<br />

King's Cross Station Redevelopment Programme<br />

Presented to: King's Cross Project Team<br />

Contractor: Vinci Construction UK<br />

Client: Network Rail<br />

Whiston Hospital<br />

Presented to: Whiston Hospital PFI Team<br />

Contractor: Vinci Construction UK<br />

Client: St Helens & Knowsley NHS Trust<br />

Highbury College<br />

Presented to: Craig MacNair<br />

Contractor: VolkerFitzpatrick<br />

Client: Highbury College<br />

London Borough of Hackney Term Maintenance<br />

Contract 2007-2011<br />

Presented to: Mark Mascar<br />

Contractor: Volkerhighways Ltd<br />

Client: London Borough of Hackney<br />

Chatburn Station Bridge Reconstruction<br />

Presented to: Glenn Harrison<br />

Contractor: VolkerStevin Ltd<br />

Client: Lancashire County Council<br />

Manor C of E School, Millfield Lane, York<br />

Presented to: Mark Powell<br />

Contractor: Wates Construction<br />

Client: <strong>The</strong> Governors of Manor School<br />

Harbour PRU Lowestoft<br />

Presented to: Dale Newcombe<br />

Contractor: Wates Construction Ltd<br />

Client: Suffolk County Council<br />

National Audit Office<br />

Presented to: Vince Finnegan<br />

Contractor: Wates Construction Ltd<br />

Client: National Audit Office<br />

Perivale Primary School<br />

Presented to: David Rowsell<br />

Contractor: Wates Construction Ltd<br />

Client: Perivale Primary School<br />

Public Service Village-Bury St Edmunds<br />

Presented to: Laurence Dobkin<br />

Contractor: Wates Construction Ltd<br />

Client: Suffolk County Council<br />

Stockport College Project - New Workshops<br />

Presented to: Shane Benson<br />

Contractor: Wates Construction Ltd<br />

Client: Stockport College<br />

WSCC<br />

Presented to: Paul Richardson<br />

Contractor: Wates Interiors<br />

Client: West Sussex County Council<br />

Bognor Regis Community College-<br />

Secondary School<br />

Presented to: Merv Pollington<br />

Contractor: Willmott Dixon Construction<br />

Client: West Sussex County Council<br />

Chessington Community College<br />

Presented to: Neil Tugwell<br />

Contractor: Willmott Dixon Construction Ltd<br />

Client: Royal Borough of Kingston upon Thames<br />

Kendrick School & Project Faraday<br />

Presented to: Leon Bastajian<br />

Contractor: Willmott Dixon Construction Ltd<br />

Client: Reading Borough Council<br />

St Annes Academy<br />

Presented to: Brian Hanlon<br />

Contractor: Willmott Dixon Construction Ltd<br />

Client: Rochdale Council<br />

Stockwell Park High School<br />

Presented to: Adam Worrall<br />

Contractor: Willmott Dixon Construction Ltd<br />

Client: London Borough of Lambeth<br />

St Georges Keyworker Accommodation<br />

Tooting Site<br />

Presented to: Tony Brook<br />

Contractor: Willmott Dixon Housing<br />

Client: Thames Valley Housing Association<br />

‘‘’’<br />

I would like to congratulate all the <strong>Considerate</strong><br />

<strong>Constructors</strong> <strong>Scheme</strong>’s 2010 National Site <strong>Award</strong><br />

<strong>winners</strong> for the exceptional standards of<br />

performance they have attained in order to win<br />

their <strong>Award</strong>s.<br />

<strong>The</strong> commitment of the <strong>winners</strong> to their<br />

companies, to the <strong>Scheme</strong> and to our industry is<br />

both impressive and commendable; not least<br />

against the backdrop of a very difficult 12<br />

months for construction. All the <strong>winners</strong> are<br />

therefore most deserving of this accolade.<br />

Stephen Ratcliffe<br />

Director, UK Contractors’ Group


Bronze <strong>Award</strong> <strong>winners</strong><br />

Eastney Pumping Station<br />

Presented to: Andy Woodroffe<br />

Contractor: 4Delivery Ltd<br />

Client: Southern Water<br />

M61 Junction 3-4 Safety Fence Hybrid<br />

Presented to: Peter Young<br />

Contractor: A one +<br />

Client: Highways Agency<br />

M53 Junctions 7-8 Roads & Structures Hybrid <strong>Scheme</strong><br />

Presented to: Stan Jukes<br />

Contractor: A one +<br />

Client: Highways Agency<br />

North East Depot<br />

Presented to: Chris Jackman<br />

Contractor: Amey LG Ltd<br />

Client: Transport for London<br />

Park Royal - North West Depot<br />

Presented to: Harry Singh Ahluwalia<br />

Contractor: Amey LG Ltd<br />

Client: Transport for London<br />

Area 13 MAC Skirsgill Depot<br />

Presented to: Angela Moffet<br />

Contractor: AmeyMouchel<br />

Client: Highways Agency<br />

Barnet LAPN<br />

Presented to: Peter Blackburn<br />

Contractor: Apollo Housing<br />

Client: Barnet Homes<br />

Affinity Sutton, Broomleigh Major Works Project<br />

Presented to: James Dickens, Lee Anderson, Keith<br />

Bassett, Harry Lovett, Sebastian Lee<br />

Contractor: Apollo in Partnership<br />

Client: Affinity Sutton Group<br />

Area 2 <strong>Scheme</strong> 43 - Wood St - Various Properties<br />

Presented to: Andrew Gratton and Terry Linnett<br />

Contractor: Apollo in Partnership<br />

Client: Ascham Homes Ltd<br />

<strong>Scheme</strong> 35-Brookdale Road, Bryon Road,<br />

Cottenham Road, Hawthorn Road, Jewel Road,<br />

Melville Road, Milton Road, London E17<br />

Presented to: Andrew Gratton and Ben Guszpit<br />

Contractor: Apollo in Partnership<br />

Client: Ascham Homes Ltd<br />

<strong>Scheme</strong> 38 - Lester House, Beech Hall Road,<br />

Malvern Avenue, London IG8<br />

Presented to: James Darker and Darren Hickey<br />

Contractor: Apollo in Partnership<br />

Client: Ascham Homes Ltd<br />

<strong>Scheme</strong> 39 Hale End Road, Hillcrest Road, London<br />

Presented to: James Darker and John Dodge<br />

Contractor: Apollo in Partnership<br />

Client: Ascham Homes Ltd<br />

Townfield Community Centre<br />

Presented to: Nagin Karsan and Lloyd Phillips<br />

Contractor: Apollo Property Services Group Ltd<br />

Client: Hillingdon Homes Ltd<br />

Bramshott Place Village<br />

Presented to: Andrew Maull<br />

Contractor: Ardmore Construction Ltd<br />

Client: Urban Renaissance Villages<br />

<strong>Silver</strong>dale Colliery New Vision Reclamation Project<br />

Presented to: Ascot Environmental Ltd, WYG<br />

Engineering Ltd & Homes & Communities Agency<br />

Contractor: Ascot Environmental Ltd<br />

Client: Homes & Communities Agency (Birmingham)<br />

Linwood Regeneration Programme<br />

Presented to: Brian Pettigrew<br />

Contractor: Ashleigh Scotland Ltd<br />

Client: Sanctuary Scotland Housing Association<br />

Aldershot Project<br />

Presented to: Aldershot Project<br />

Contractor: Aspire Defence Capital Works<br />

Client: Project Allenby/Connaught<br />

Castle View Enterprise Academy<br />

Presented to: Mark Graham<br />

Contractor: Balfour Beatty Construction Northern Ltd<br />

Client: Sunderland City Council<br />

Barnet Homes Contracts HW2/HF6/HW9<br />

Presented to: Steve Buckley<br />

Contractor: Balfour Beatty Refurbishment Ltd<br />

Client: Barnet Homes<br />

Unison Headquarters<br />

Presented to: Paul Joyce<br />

Contractor: BAM Construction Ltd - London<br />

Client: Unison<br />

Grace Academy Coventry<br />

Presented to: Scott Marsh<br />

Contractor: BAM Construction Ltd - Midlands<br />

Client: Grace Academy Coventry<br />

Severn Trent Centre<br />

Presented to: BAM Site Team<br />

Contractor: BAM Construction Ltd - Midlands<br />

Client: Stoford Projects Ltd<br />

ASDA Ashington<br />

Presented to: Chris Fenwick<br />

Contractor: BAM Construction Ltd - North East<br />

Client: ASDA<br />

SAS Building<br />

Presented to: Richard Tyler<br />

Contractor: BAM Construction Ltd - North East<br />

Client: University of Newcastle Upon Tyne<br />

BAE Systems Building 608 & 609<br />

Presented to: Sarah Payne<br />

Contractor: BAM Construction Ltd - North West<br />

Client: BAE Systems<br />

South Cheshire College<br />

Presented to: Mark Ferrie<br />

Contractor: BAM Construction Ltd - North West<br />

Client: South Cheshire College<br />

St Peters Square<br />

Presented to: David Oldfield<br />

Contractor: BAM Construction Ltd - North West<br />

Client: BAM Properties<br />

Gosport War Memorial Hospital - Redevelopment<br />

Presented to: Nick Butler<br />

Contractor: BAM Construction Ltd - South East<br />

Client: Hampshire Primary Care Trust<br />

Project Gemini<br />

Presented to: Rick Barot<br />

Contractor: BAM Construction Ltd - South East<br />

Client: AWE<br />

Southampton Hospital P21 Projects<br />

Presented to: Rob Britten, Simon Pervin and<br />

Matt Crookes<br />

Contractor: BAM Construction Ltd - South East<br />

Client: Southampton University Hospitals NHS Trust<br />

<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong> 2010 National Site <strong>Award</strong>s | 9


Bronze <strong>Award</strong> <strong>winners</strong><br />

West Herts College Hempstead Road<br />

Re-Development<br />

Presented to: Adam Harding<br />

Contractor: BAM Construction Ltd, South East<br />

Client: West Herts College<br />

Aberaeron Coastal Protection <strong>Scheme</strong><br />

Presented to: Ray Jones<br />

Contractor: BAM Nuttall Ltd<br />

Client: Ceredigion County Council<br />

Blackpool & Fleetwood Tramway<br />

Presented to: Michael Grace<br />

Contractor: BAM Nuttall Ltd<br />

Client: Blackpool Borough Council<br />

Hannafore Outfall Replacement <strong>Scheme</strong><br />

Presented to: Peter Stanton and David Folds<br />

Contractor: BAM Nuttall Ltd<br />

Client: South West Water<br />

Reading Southside Project<br />

Presented to: John Morrison<br />

Contractor: BAM Nuttall Ltd<br />

Client: Foudry Properties Ltd<br />

Restormel WTW<br />

Presented to: David Folds<br />

Contractor: BAM Nuttall Ltd<br />

Client: South West Water<br />

A20 Roundhill Tunnel<br />

Presented to: Andy Fooks<br />

Contractor: BAM Nuttall Ltd/Hanson JV<br />

Client: Highways Agency<br />

Albrighton Flood Alleviation <strong>Scheme</strong><br />

Presented to: Midlands Business Unit<br />

Contractor: Barhale Construction plc<br />

Client: Severn Trent Water<br />

Fisherman's Hut<br />

Presented to: Andrew Banks<br />

Contractor: Barhale Construction plc<br />

Client: Scottish Water Solutions<br />

London Road Flood Alleviation <strong>Scheme</strong><br />

Presented to: Ron Hastings<br />

Contractor: Barhale Construction plc<br />

Client: Thames Water Utilities Ltd<br />

Longdon Green to Gentleshaw Trunk Main<br />

Presented to: Midlands Business Unit<br />

Contractor: Barhale Construction plc<br />

Client: South Staffordshire Water plc<br />

Block G Extension<br />

Presented to: Neil Crowther<br />

Contractor: Barnwood Construction Ltd<br />

Client: <strong>The</strong> Governors of Cheltenham Bournside School<br />

Launch Pad Plot 3400<br />

Presented to: Lew Whitehead and Neil Crowther<br />

Contractor: Barnwood Construction Ltd<br />

Client: Robert Hitchins Ltd<br />

Whitelee Wind Farm Visitor Centre<br />

Presented to: Robert Gamble<br />

Contractor: Barr Construction<br />

Client: Scottish Power Renewables (UK) Ltd<br />

<strong>The</strong> Heathers<br />

Presented to: Daryl Walsh<br />

Contractor: Barratt Homes Manchester<br />

Client: Barratt Manchester<br />

Great West Quarter, Brentford<br />

Presented to: Daniel Farenden<br />

Contractor: Barratt Homes West London<br />

Client: Barratt West London<br />

Chelsea Bridge Wharf, Block A<br />

Presented to: Jamie Street<br />

Contractor: Berkeley Homes (Urban Renaissance) Ltd<br />

Client: Berkeley Homes (Urban Renaissance) Ltd<br />

Fryston & Wheldale Collieries Reclamation<br />

Presented to: Wakefield Metropolitan District<br />

Council, Yorkshire Forward and Birse Civils<br />

Contractor: Birse Civils<br />

Client: Yorkshire Forward/Wakefield MDC<br />

University Square/Brownlow Hill<br />

Presented to: Liverpool City Council, 20/20<br />

Liverpool and Birse Civils Ltd<br />

Contractor: Birse Civils Ltd<br />

Client: Liverpool City Council<br />

Wanlip STW<br />

Presented to: Wanlip STW Team<br />

Contractor: Biwater Treatment Ltd<br />

Client: Severn Trent Water Ltd<br />

Ewden WTW (Raw Water Colour Reduction <strong>Scheme</strong>)<br />

Presented to: Julian Hammer<br />

Contractor: Black & Veatch<br />

Client: Yorkshire Water Services Ltd<br />

Talybont Water Treatment Works<br />

Presented to: Dwr Cymru Welsh Water<br />

Contractor: Black & Veatch/Laing O'Rourke<br />

Partnerships<br />

Client: Dwr Cymru Welsh Water<br />

Construction of the New Library and Clinic and<br />

Refurbishment of the Community Centre<br />

Presented to: John Riordan<br />

Contractor: Borras Construction Ltd<br />

Client: Bedford Borough Council<br />

St Paul’s Way Community School<br />

Presented to: Nicolas Beausseron<br />

Contractor: Bouygues UK Ltd<br />

Client: London Borough of Tower Hamlets<br />

Exchange Place, Edinburgh<br />

Presented to: BLL Project Team<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: Hanover Cube<br />

Gloucester Quays<br />

Presented to: Simon Allen<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: Gloucester Quays LLP<br />

Greenwich N0204<br />

Presented to: Nick Daniel<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: GPRL Ltd<br />

One Southampton Row<br />

Presented to: David Davies<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: Hanover Cube<br />

Ravensbourne College<br />

Presented to: Adrian Richards<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: Meridian Delta Ltd<br />

Regents Place<br />

Presented to: Roger Hirst<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: <strong>The</strong> British Land Company plc<br />

University of Sheffield - Student Village<br />

Presented to: Richard Brooke<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: Catalyst Higher Education (Sheffield) plc<br />

University of St Andrews,<br />

New Bute School of Medicine<br />

Presented to: Rodger Anderson<br />

Contractor: Bovis Lend Lease Ltd<br />

Client: University of St Andrews<br />

Syon Park Hotel<br />

Presented to: Bowen Site team<br />

Contractor: Bowen plc<br />

Client: Ability Hotel (Syon) Ltd<br />

St John's Worcester<br />

Presented to: Paul Foster<br />

Contractor: Bowmer & Kirkland Ltd<br />

Client: Sainsbury's Supermarkets Ltd<br />

Leighnmohr Cresent<br />

Presented to: Sean McWilliams<br />

Contractor: Braidwater Ltd<br />

Client: Braidwater Ltd<br />

5047 - Aldham House Lane<br />

Presented to: Rob Seaman<br />

Contractor: Bramall Construction Ltd<br />

Client: Yorkshire Housing<br />

5077 - Love Lane<br />

Presented to: Bob Carr<br />

Contractor: Bramall Construction Ltd<br />

Client: Synergy Housing Solutions Ltd<br />

Exmouth Street<br />

Presented to: Ian Reynolds<br />

Contractor: Bramall Construction Ltd<br />

Client: Accent Group Ltd<br />

L.M.H Framework<br />

Presented to: Paul McKenzie<br />

Contractor: Bramall Construction Ltd<br />

Client: Liverpool Mutual Homes<br />

Longsight Library<br />

Presented to: Martin Hook and Bob Hanlon<br />

Contractor: Bramall Construction Ltd<br />

Client: Manchester City Council<br />

Year 4 Works Kitchen & Bathroom Replacements<br />

Presented to: Carl Watkin<br />

Contractor: Bramall Construction Ltd<br />

Client: Community Gateway Association<br />

Chingford Green Various<br />

Presented to: Paul Darbinson<br />

Contractor: Breyer Group plc<br />

Client: Ascham Homes Ltd<br />

Strata SE1<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: Brookfield Construction (UK) Ltd<br />

Client: Castle House Developments<br />

Lots Road Power Station Redevelopment<br />

Presented to: Brown & Mason<br />

Project Management Team<br />

Contractor: Brown & Mason Ltd<br />

Client: Hutchinson Whampoa Properties (Europe) Ltd<br />

<strong>The</strong> Cube<br />

Presented to: Aidan Smith and Neil Edginton<br />

Contractor: BuildAbility Ltd<br />

Client: Birmingham Development Co Ltd<br />

DS3 Project<br />

Presented to: Michael Morrissey<br />

Contractor: Canary Wharf Contractors Ltd<br />

Client: Canary Wharf Group<br />

Chambers Wharf<br />

Presented to: Cantillon Ltd<br />

Contractor: Cantillon Ltd<br />

Client: St Martins Property Corporation Ltd


Bronze <strong>Award</strong> <strong>winners</strong><br />

Basildon Lower Academy<br />

Presented to: Russell Lane<br />

Contractor: Carillion Building<br />

Client: Essex County Council<br />

Beaconsfield MSA<br />

Presented to: Leigh Rogers<br />

Contractor: Carillion Building<br />

Client: Swayfields Ltd<br />

Bury Townside Fields Development<br />

Presented to: John England<br />

Contractor: Carillion Building<br />

Client: ASK Property Development Ltd<br />

Gaza Barracks Redevelopment<br />

Presented to: Steve Simmons<br />

Contractor: Carillion Building<br />

Client: Defence Estates<br />

Joseph Rowntree New School Project<br />

Presented to: Joseph Rowntree Site Team<br />

Contractor: Carillion Building<br />

Client: City of York Council<br />

Leeds Swarcliffe P.F.I x2<br />

Presented to: Chris Phillips, John Tweddell and the<br />

Swarcliffe Team<br />

Contractor: Carillion Building<br />

Client: Yorkshire Transformations Ltd<br />

New Line Learning Academy<br />

Presented to: NLLA Project Team<br />

Contractor: Carillion Building<br />

Client: Kent County Council<br />

New Welsh Assembly Government Office,<br />

Aberystwyth<br />

Presented to: Stephen Evans<br />

Contractor: Carillion Building<br />

Client: Welsh Assembly Ministers<br />

Queen Elizabeth High School<br />

Presented to: Mark Wusthoff<br />

Contractor: Carillion Building<br />

Client: Carmarthenshire County Council<br />

Romford Market Redevelopment-Phase3-5<br />

Presented to: Ahmad Moazami<br />

Contractor: Carillion Building<br />

Client: Pickenham (Romford) Ltd<br />

Site Offices Carillion Building, Nailsea School<br />

Presented to: Richard Molloy<br />

Contractor: Carillion Building<br />

Client: North Somerset Council<br />

St Joseph's VA RC Comprehensive School<br />

Presented to: Farid Didi<br />

Contractor: Carillion Building<br />

Client: Inspiredspaces STaG Ltd<br />

Urmston Town Centre Regeneration Project<br />

Presented to: John Currie<br />

Contractor: Carillion Building<br />

Client: ASK Property Development Ltd<br />

Woodley "One Stop Health Centre"<br />

Presented to: Pat Wickham<br />

Contractor: Carillion Building<br />

Client: 1st Health Solutions<br />

Burgh Primary School<br />

Presented to: Owen Cherrie<br />

Contractor: Carillion Building Scotland<br />

Client: South Lanarkshire Council<br />

A6192 Staveley Northern Loop Phase 1<br />

Presented to: Ian Bingham and Simon Alsop<br />

Contractor: Carillion Civil Engineering<br />

Client: Derbyshire County Council<br />

Bedford Western Bypass<br />

Presented to: Carillion Site Team<br />

Contractor: Carillion Civil Engineering<br />

Client: Bedford Borough Council<br />

A40 Western Avenue Bridges Replacement<br />

Presented to: Sean McCallion<br />

Contractor: Carillion Infrastructure<br />

Client: Transport for London - Street Management<br />

M4 Widening - Junction 29 to 32<br />

Presented to: Mike Park<br />

Contractor: Carillion Infrastructure<br />

Client: Welsh Assembly Government<br />

Building D, Paddington<br />

Presented to: Ian Cordery<br />

Contractor: Carillion National Building<br />

Client: European Land and Property Ltd<br />

Indescon Court-Phase 1<br />

Presented to: Barry O'Shea<br />

Contractor: CJ O'Shea & Co Ltd<br />

Client: Millharbour Developments Ltd<br />

Sanctuary Building<br />

Presented to: Phil Lynn and Bill Burns<br />

Contractor: COFELY GDF SUEZ<br />

Client: Department for Children Schools and Families<br />

St Michael & All Angels Primary School<br />

Presented to: Gordon Mackenzie<br />

Contractor: Conlon Construction Ltd<br />

Client: Archdiocese of Liverpool<br />

Costain Farmoor AWTW<br />

Presented to: Costain Farmoor AWTW Project Team<br />

Contractor: Costain Ltd<br />

Client: Thames Water<br />

Felixstowe South Reconfiguration - Phase 1<br />

Presented to: David Alefs<br />

Contractor: Costain Ltd<br />

Client: Port of Felixstowe<br />

Riverside Resource Recovery Facility<br />

Presented to: John Russell<br />

Contractor: Costain Ltd<br />

Client: Riverside Resource Recovery Ltd<br />

South Crescent Project<br />

Presented to: Paul Middleton and Aubrey Davies<br />

Contractor: Costain Ltd<br />

Client: City of London<br />

Spalding Community Hospital<br />

Presented to: Steve Merrin<br />

Contractor: Costain Ltd<br />

Client: Arden Partnership (Lincolnshire) Ltd<br />

20, 22, 34, 36, 38 and 40 Ebury Bridge Road<br />

Presented to: <strong>The</strong> Bastows Project Management Team<br />

Contractor: D Bastow Ltd<br />

Client: Grosvenor Estate Management <strong>Scheme</strong> -<br />

Belgravia<br />

Tan Pit Retaining Wall Replacement<br />

Presented to: Lloyd Williams<br />

Contractor: DCT Civil Engineering Ltd<br />

Client: Stockport MBC<br />

Brixham Regeneration Phase 1<br />

Presented to: Simon Wilkinson<br />

Contractor: Dean & Dyball Civil Engineering<br />

Client: Torbay Development Agency<br />

DSDA Ashchurch - Main Gate Improvements<br />

Presented to: James Darby and Philip Goodfellow<br />

Contractor: Debut Services (South West) Ltd<br />

Client: Defence Estates<br />

Woolwich Barracks (A8201)<br />

Presented to: Derek Wright<br />

Contractor: Debut Services Ltd<br />

Client: Defence Estates<br />

Helles Barracks<br />

Presented to: Drew Goldie<br />

Contractor: Debut Services Ltd Project Slam<br />

Client: Defence Estates<br />

RAF Leeming<br />

Presented to: Andy Murray<br />

Contractor: Debut Services Ltd Project Slam<br />

Client: Defence Estates<br />

Caspian Wharf Block 'B'<br />

Presented to: Neil Mugridge<br />

Contractor: Denne Construction Ltd<br />

Client: Berkeley Homes Capital plc<br />

Highfield<br />

Presented to: Graham Rye<br />

Contractor: Denne Construction Ltd<br />

Client: Janine Stone Ltd<br />

Ham Drive Learning Centre<br />

Presented to: Devon Contractors<br />

Design and Build Team<br />

Contractor: Devon Contractors Ltd<br />

Client: Plymouth City Council<br />

Construction of 10 Nr Flats & Demolition of<br />

Existing Building on Parkfield Hall<br />

Presented to: Dean Purvis<br />

Contractor: Dunelm Property Services Ltd<br />

Client: Endeavour Housing Association<br />

Parkway & Churchside South Shields Task Order 4<br />

Presented to: Shawn Clark<br />

Contractor: Dunelm Property Services Ltd<br />

Client: South Tyneside Homes<br />

Yorkswood House, Solihull<br />

Presented to: Dean Lambert<br />

Contractor: E.G.Carter & Co Ltd<br />

Client: Home Group Ltd<br />

134 Franche Road, Kidderminster, Worcestershire<br />

Presented to: Trevor Stevens<br />

Contractor: E.G.Carter & Company Ltd<br />

Client: Home Group (Stoneham Housing)<br />

University of Liverpool H.I.P<br />

Presented to: EMCOR - H.I.P Project Team<br />

Contractor: EMCOR Engineering Services Ltd<br />

Client: University of Liverpool<br />

EnterpriseMouchel (Area 1) Notter Bridge<br />

Highways Depot<br />

Presented to: Howard Jones<br />

Contractor: EnterpriseMouchel<br />

Client: Highways Agency<br />

Lisburn Institute Site Offices<br />

Presented to: George McClure<br />

Contractor: Farrans (Construction) Ltd<br />

Client: East Down and Lisburn Partnership<br />

‘Decent Homes Works’ (Charnwood<br />

Neighbourhood Housing)<br />

Presented to: Pete Watson<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Charnwood Neighbourhood Housing Ltd<br />

183 No Heatings Cowpen Area 3 Blyth<br />

Presented to: Mark Thompson<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Blyth Valley Housing<br />

<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong> 2010 National Site <strong>Award</strong>s | 11


Bronze <strong>Award</strong> <strong>winners</strong><br />

Abbey Court<br />

Presented to: Barry Wild<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: <strong>The</strong> Gateshead Housing Company<br />

Acquired Properties<br />

Presented to: Colin Tate<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Your Homes Newcastle<br />

Addison Grafton Estate<br />

Presented to: Barry Metters<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Your Homes Newcastle<br />

Blyth Valley Heatings Cowpen 4<br />

Presented to: Mark Thompson<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Blyth Valley Housing<br />

Blyth Valley Mods - 221 Heating's, Cowpen<br />

Presented to: Andrew Cooper<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Blyth Valley Housing<br />

Blyth Valley Mods - 96 Heating's<br />

Presented to: Mark Thompson<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Blyth Valley Housing<br />

Blyth Valley Mods - Bowes Court & Pattinson House<br />

Presented to: Ian McBean<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Blyth Valley Housing<br />

Etal Park<br />

Presented to: Simon Roberts<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Your Homes Newcastle<br />

Fawdon Unities<br />

Presented to: Kevin McCormack<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Your Homes Newcastle<br />

Ferguson Lane<br />

Presented to: Dave Lagus<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Your Homes Newcastle<br />

Grayson Crest<br />

Presented to: Richard Hadfield<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: West North West Homes Leeds<br />

Newbolt & Tennyson<br />

Presented to: Barry Wild<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: <strong>The</strong> Gateshead Housing Company<br />

Newcastle Sheltered Housing<br />

Presented to: Brian Spackman<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Your Homes Newcastle<br />

Ponteland Year 2<br />

Presented to: Ian Towers<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Northumberland County Council<br />

Rookwood Phase 7A<br />

Presented to: Duncan Gray<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Leeds East North East Homes<br />

Shiregreen<br />

Presented to: Chris Bridgewood, Paul Yates, Jonny<br />

Woodhead, Chris Goddard and Simon Fenn<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Sanctuary Housing Association<br />

South Warwickshire<br />

Presented to: Stuart Nicholls<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Heart of England Housing Group<br />

Stanley Area<br />

Presented to: Dave Britton<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Derwentside Homes<br />

Walker North of Grasmere<br />

Presented to: Andy Yule<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Your Homes Newcastle<br />

Wansbeck Homes Externals<br />

Presented to: Arthur Cornell<br />

Contractor: Frank Haslam Milan & Co Ltd<br />

Client: Wansbeck Homes<br />

Lloyd Motors Colne<br />

Presented to: Nigel Bantleman<br />

Contractor: G & J Seddon Ltd<br />

Client: G & J Seddon Ltd<br />

Newbury House<br />

Presented to: Andy Sutherland<br />

Contractor: G & J Seddon Ltd<br />

Client: Riverside Housing Association<br />

Fort Royal Primary School<br />

Presented to: Peter Dunn and Leanne Burden<br />

Contractor: G F Tomlinson Birmingham Ltd<br />

Client: Worcestershire County Council<br />

Kings Norton Nursery<br />

Presented to: Vance Seymour, David Tomlin and<br />

Chris Sheriff<br />

Contractor: G F Tomlinson Birmingham Ltd<br />

Client: Birmingham City Council<br />

Osprey Quay Marina<br />

Presented to: Alan Crabb<br />

Contractor: G & H Group<br />

Client: Dean & Reddyhoff Marinas Ltd<br />

1-17 Kinnerton Street, Belgravia, London,<br />

SW1X 8EA<br />

Presented to: Matt Ayers – Project Manager and<br />

Chris Ashton – Senior Site Manager<br />

Contractor: Galliford Try Construction (South) Ltd<br />

Client: Grosvenor Developments Ltd<br />

Chestnut Lodge<br />

Presented to: Neil Joyce<br />

Contractor: Galliford Try Partnerships Ltd<br />

Client: Ealing Care Alliance<br />

Southview Road, Vange<br />

Presented to: Michael Dennis<br />

Contractor: Galliford Try Partnerships Ltd<br />

Client: Swan Housing Association<br />

Durham Johnston School<br />

Presented to: Neil Metcalf and Steve Cockerill<br />

Contractor: GB Building Solutions Ltd<br />

Client: Durham County Council<br />

New Delaval Primary School<br />

Presented to: Alex Barker<br />

Contractor: GB Building Solutions Ltd<br />

Client: Northumberland County Council<br />

Oasis Academy, Pelham Road, Immingham<br />

Presented to: Andy Costello and Mick Count<br />

Contractor: GB Building Solutions Ltd<br />

Client: <strong>The</strong> Oasis Centre<br />

Staybridge Hotel Newcastle<br />

Presented to: Darren Cook and John McIntyre<br />

Contractor: GB Building Solutions Ltd<br />

Client: Trinity Developments (Newcastle) Ltd<br />

Willerby Carr Lane Primary School<br />

Presented to: James Townend, John Gledhill<br />

and Nick Fryer<br />

Contractor: Geo. Houlton & Sons Ltd<br />

Client: East Riding of Yorkshire Council<br />

933-946 Yeovil Road<br />

Presented to: Roger Pettitt, Chris Creighton and<br />

Matt Forsdick<br />

Contractor: Geoffrey Osborne Ltd<br />

Client: SEGRO plc<br />

Quorum Business Park<br />

Presented to: <strong>The</strong> Quorum Site Management Team<br />

Contractor: Grantside Ltd<br />

Client: Quorum Development Partners LLP<br />

Pumping Station Site<br />

Presented to: Martyn Wicks and David Reynolds<br />

Contractor: Gullett & Sons Ltd<br />

Client: A2Dominion Group<br />

A38 Kennford to Exeter Racecourse Westbound<br />

Presented to: Peter Collinson<br />

Contractor: Hanson Contracting<br />

Client: Highways Agency<br />

Titanic Quarter<br />

Presented to: Sean Francis<br />

Contractor: Harcourt Construction NI Ltd<br />

Client: Titanic Quarter<br />

My Street Phase 2<br />

Presented to: Andrew Prosper<br />

Contractor: Herbert T Forrest Ltd<br />

Client: Salix Homes<br />

Mill Road<br />

Presented to: Keith Fisher<br />

Contractor: Higgins Construction plc<br />

Client: Swan Housing Group<br />

<strong>The</strong> Quadrant<br />

Presented to: <strong>The</strong> Quadrant Site Team<br />

Contractor: Higgins Construction plc<br />

Client: Presentation Housing Association<br />

42C 45N & 0 Eaton Square<br />

Presented to: Spencer Edwards<br />

Contractor: Holloway White Allom Ltd<br />

Client: Grosvenor Investments Ltd<br />

HWA, 51 Eaton Square<br />

Presented to: Paul Flanagan<br />

Contractor: Holloway White Allom Ltd<br />

Client: Grosvenor Estate Management <strong>Scheme</strong> -<br />

Belgravia<br />

Longriggend Waste Water Treatment Works<br />

Presented to: Graham Fielden<br />

Contractor: Horizons Hydro Engineering<br />

Client: Scottish Prison Services<br />

College of Arms<br />

Presented to: John Kennedy and Jody Kennedy<br />

Contractor: Houseline Building Services Ltd<br />

Client: College of Arms<br />

Allerton Grange New High School<br />

Presented to: Simon Walton<br />

Contractor: Interserve Project Services Ltd<br />

Client: Leeds City Council


Bronze <strong>Award</strong> <strong>winners</strong><br />

HMP/YOI Isis<br />

Presented to: Tim Shepherd<br />

Contractor: Interserve Project Services Ltd<br />

Client: Ministry of Justice Custodial Property (MoJCP)<br />

M3 Mapledurwell Junction 5 to 6 Major<br />

Maintenance<br />

Presented to: Steve Bendall and Darryl Allen<br />

Contractor: Interserve Project Services Ltd<br />

Client: Highways Agency<br />

EDS<br />

Presented to: Paul Pompili<br />

Contractor: ISG InteriorExterior<br />

Client: EDS<br />

Shell Centre Renewal<br />

Presented to: Andrew Sheppard<br />

Contractor: ISG InteriorExterior<br />

Client: Shell<br />

Best Buy Hedge End<br />

Presented to: James Long<br />

Contractor: ISG Pearce<br />

Client: Best Buy Europe<br />

Rotary Court<br />

Presented to: Jason Hancock<br />

Contractor: ISG Pearce<br />

Client: Saxon Weald Homes<br />

Sainsbury's Bude<br />

Presented to: Garin Cope<br />

Contractor: ISG Pearce<br />

Client: Sainsbury's Supermarkets Ltd<br />

Tesco Winchester<br />

Presented to: Phil Waters<br />

Contractor: ISG Pearce<br />

Client: Tesco Stores Ltd<br />

All Saints’ C of E School<br />

Presented to: Roy Ward<br />

Contractor: ISG Regions<br />

Client: City of Bradford Metropolitan District Council<br />

Sir John Deane's College<br />

Presented to: Fraser Tanner<br />

Contractor: ISG Regions<br />

Client: Sir John Deane's College<br />

A47 Kings Lynn Baco’s<br />

Presented to: Chris Souter<br />

Contractor: Jackson Frameworks Ltd<br />

Client: Atkins Ltd<br />

Thirlmere Compensation Flow<br />

Presented to: Robert Hill<br />

Contractor: JN Bentley Ltd<br />

Client: United Utilities<br />

Grosvenor House Apartments<br />

Presented to: Lee Hutchinson<br />

Contractor: John Sisk & Son Ltd<br />

Client: Spark<br />

Wembley WO4<br />

Presented to: Eike Schwartlander<br />

Contractor: John Sisk & Son Ltd<br />

Client: Quintain Investments (04) Ltd<br />

ISS Building<br />

Presented to: Graham Woodridge<br />

Contractor: John Turner & Sons (Preston) Ltd<br />

Client: Lancaster University<br />

Elements - Herringthorpe Rotherham<br />

Presented to: Steve Whitehead<br />

Contractor: Keepmoat Homes Ltd<br />

Client: NHBC<br />

<strong>The</strong> Pinnacle Milton Keynes - New Building<br />

Development<br />

Presented to: M. R. George<br />

Contractor: Kier<br />

Client: Hampton Brook Ltd<br />

Knights Enham Infant & Junior Schools<br />

Presented to: Andy Hammerton<br />

Contractor: Kier Brazier<br />

Client: Hampshire County Council<br />

Mid Kent College, Lower Lines<br />

Presented to: MKC Project Team<br />

Contractor: Kier Build<br />

Client: Mid Kent College<br />

Richard Rose Central Academy<br />

Presented to: Richard Rose Central Academy Team<br />

Contractor: Kier Construction<br />

Client: Cumbria County Council<br />

Canons High School<br />

Presented to: Anthony Cooney<br />

Contractor: Kier Harrow Projects<br />

Client: Harrow Council<br />

<strong>The</strong> Samworth Church Academy<br />

Presented to: John Hodson<br />

Contractor: Kier Marriott<br />

Client: Nottinghamshire County Council<br />

Walter Sickert Hall<br />

Presented to: Jon Carter<br />

Contractor: Kier Marriott<br />

Client: Liberty Living plc<br />

Cauldon Campus - Caring Centre of Excellence<br />

Presented to: John Leo<br />

Contractor: Kier Moss<br />

Client: Stoke on Trent College<br />

Sainsbury's Gloucester Quays<br />

Presented to: David Edkins<br />

Contractor: Kier Moss<br />

Client: Sainsbury's Supermarkets Ltd<br />

PICU, Carleton Clinic<br />

Presented to: Ray Swindon<br />

Contractor: Kier North East<br />

Client: <strong>The</strong> Cumbria Partnership NHS Trust<br />

Morrison's Supermarket, Horsforth<br />

Presented to: Phil Shepherd<br />

Contractor: Kier North West<br />

Client: WM Morrison Supermarkets plc<br />

Tesco - Liverpool One<br />

Presented to: Rick Smeaton<br />

Contractor: Kier North West<br />

Client: Tesco Stores Ltd<br />

Stream 11 Decent Homes - Jaunty Site Compound<br />

Presented to: Ivan Middleton, Paul Harpham<br />

and Jo Balm<br />

Contractor: Kier Sheffield LLP<br />

Client: Sheffield Homes<br />

Butlins Spa Hotel<br />

Presented to: James Ashley<br />

Contractor: Kier Southern<br />

Client: Bourne Leisure<br />

Fosse Way Special School<br />

Presented to: Mark Mitchell<br />

Contractor: Kier Western<br />

Client: Bath & North East Somerset Council<br />

Keynsham Primary Care Centre<br />

Presented to: Trevor Anderson<br />

Contractor: Kier Western<br />

Client: Bath & North East Somerset Primary Care<br />

Yate Community Health Centre<br />

Presented to: Gary Latham<br />

Contractor: Kier Western<br />

Client: South Gloucestershire Primary Care Trust<br />

St John's College Oxford - Kendrew Quadrangle<br />

Presented to: Darran Gammon<br />

Contractor: Kingerlee Ltd<br />

Client: <strong>The</strong> President and Scholars of Saint John<br />

Baptist College in the University of Oxford<br />

Project Spear<br />

Presented to: Geoff Eardley<br />

Contractor: Laing O'Rourke /<br />

Crown House Technologies<br />

Client: Barclays<br />

Stockport Modular Twin <strong>The</strong>atres and Wards<br />

Presented to: Laing O’Rourke Team<br />

Contractor: Laing O'Rourke Construction Ltd<br />

Client: Stockport NHS Foundation Trust<br />

Manchester Central Project<br />

Presented to: Manchester Central Project Team<br />

Contractor: Laing O'Rourke Construction North Ltd<br />

Client: Manchester Central<br />

Manchester Health Academy<br />

Presented to: Shaun Boylan<br />

Contractor: Laing O'Rourke Construction North Ltd<br />

Client: Manchester City Council<br />

Women's and Newborn Unit<br />

Presented to: David Mills<br />

Contractor: Laing O'Rourke Construction North Ltd<br />

Client: East Lancashire Hospitals NHS Trust<br />

Cannon Place Project<br />

Presented to: David Hiddleston<br />

Contractor: Laing O'Rourke Construction South Ltd<br />

Client: Hines UK<br />

Hardwicks Way<br />

Presented to: Chris Warren and Robert Knott<br />

Contractor: Laing O'Rourke Construction South Ltd<br />

Client: Hardwicks (Wandsworth)<br />

Pembury Hospital Redevelopment<br />

Presented to: Jonathan Abbott<br />

Contractor: Laing O'Rourke Construction South Ltd<br />

Client: Kent & East Sussex Weald Hospital Ltd<br />

Forrester & St Augustine's High Schools<br />

Presented to: Andy Somerville<br />

Contractor: Laing O'Rourke Scotland Ltd<br />

Client: Axiom Education<br />

Harold Hill Fire Station<br />

Presented to: John Loftus<br />

Contractor: Lakehouse<br />

Client: London Fire & Emergency Planning Authority<br />

Thorn Grove Primary School<br />

Presented to: Darren McKeon<br />

Contractor: Lakehouse<br />

Client: Hertfordshire County Council<br />

Lyme Regis House<br />

Presented to: Steve Burton<br />

Contractor: Leadbitter<br />

Client: Signpost Housing Association Ltd<br />

<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong> 2010 National Site <strong>Award</strong>s | 13


Bronze <strong>Award</strong> <strong>winners</strong><br />

Swindon Academy<br />

Presented to: Brian Rawlings<br />

Contractor: Leadbitter Group<br />

Client: United Learning Trust<br />

Sainsbury's Store Chiswick<br />

Presented to: Leigh Russell<br />

Contractor: Longcross Construction<br />

Client: Sainsbury's Supermarkets Ltd<br />

Sainsbury’s, Bury St Edmunds<br />

Presented to: Stuart Donovan<br />

Contractor: Longcross Construction<br />

Client: Sainsbury's Supermarkets Ltd<br />

Tesco Loughborough - <strong>The</strong> Rushes<br />

Presented to: Andrew Kitchen<br />

Contractor: Longcross Construction<br />

Client: Tesco Stores Ltd<br />

1-24 Daniel House<br />

Presented to: Bill Matharu<br />

Contractor: Lovell Partnerships Ltd<br />

Client: Hackney Homes<br />

1-35 Oberon House<br />

Presented to: Bill Matharu<br />

Contractor: Lovell Partnerships Ltd<br />

Client: Hackney Homes<br />

45-180 Crondall Court<br />

Presented to: Bill Matharu<br />

Contractor: Lovell Partnerships Ltd<br />

Client: Hackney Homes<br />

Beswick Phase 2<br />

Presented to: John Mather<br />

Contractor: Lovell Partnerships Ltd<br />

Client: Lovell Partnerships Ltd<br />

Cheltenham ALMO<br />

Presented to: Dennis Powell and Tim Harrison<br />

Contractor: Lovell Partnerships Ltd<br />

Client: Cheltenham Borough Homes<br />

Churchfields<br />

Presented to: Allan Cramsie and Geoff Riley<br />

Contractor: Lovell Partnerships Ltd<br />

Client: South Liverpool Housing<br />

Fagley Internal Refurbishment<br />

Presented to: Roy Brown<br />

Contractor: Lovell Partnerships Ltd<br />

Client: In Communities<br />

Gilead Street<br />

Presented to: Nigel Cooper<br />

Contractor: Lovell Partnerships Ltd<br />

Client: Riverside Housing Association<br />

North Warwickshire/Piccadilly<br />

Presented to: Mark West and Brian Berry<br />

Contractor: Lovell Partnerships Ltd<br />

Client: North Warwickshire Borough Council<br />

Raffles Estate, Phase 3, Site D (Park View)<br />

Presented to: Angela Metcalfe<br />

Contractor: Lovell Partnerships Ltd<br />

Client: Lovell Partnerships Ltd<br />

Ringland Regeneration Phase 2<br />

Presented to: Paul Phillips<br />

Contractor: Lovell Partnerships Ltd<br />

Client: Fairlake Properties<br />

St Mellons 2B<br />

Presented to: Gemma Davies<br />

Contractor: Lovell Partnerships Ltd<br />

Client: City and County of Cardiff<br />

Rutherford Appleton Laboratories -<br />

New Research Complex<br />

Presented to: Darren Phillips<br />

Contractor: M + W Group<br />

Client: Rutherford Appleton Laboratories<br />

7 More London Riverside<br />

Presented to: Mace Plot 7 Team<br />

Contractor: Mace Ltd<br />

Client: LBD 2 Ltd<br />

Mill Rise Extra Care Village<br />

Presented to: Mike Whittington<br />

Contractor: Mansell Construction Services Ltd<br />

Client: Prima 200 Fundco No 1 Ltd<br />

Sandwell Pathfinder<br />

Harvills Hawthorn Improvement<br />

Presented to: Wayne Gwilt<br />

Contractor: Mansell Construction Services Ltd<br />

Client: Riverside Housing Association<br />

Sandwell Pathfinder Improved Standard Works<br />

Presented to: Martin Sollars<br />

Contractor: Mansell Construction Services Ltd<br />

Client: Riverside Housing Association<br />

Sandwell Pathfinder Millfields Regeneration<br />

Presented to: Lewis Jones<br />

Contractor: Mansell Construction Services Ltd<br />

Client: Riverside Housing Association<br />

<strong>The</strong> Dartford Bridge Learning<br />

& Community Campus<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: Mansell Construction Services Ltd<br />

Client: Kent County Council<br />

Three Corners Youth Building<br />

Presented to: Bob Belzko, Matthew Osborn, Romeo<br />

Kengne and Paul Hardy<br />

Contractor: Mansell Construction Services Ltd<br />

Client: London Borough of Islington<br />

Big Yellow Self Storage, Reading<br />

Presented to: James Currie<br />

Contractor: MCS Build Ltd<br />

Client: <strong>The</strong> Big Yellow Group plc<br />

Northampton Public Realm - Phase 1B<br />

Presented to: MGWSP/Aggregate Industries<br />

Construction Team<br />

Contractor: MGWSP<br />

Client: Northamptonshire County Council<br />

Front of House Project Torbay Hospital (c/o<br />

Medicinq Ltd )<br />

Presented to: Steve Pollard<br />

Contractor: Midas Construction Ltd<br />

Client: South Devon Healthcare<br />

Penwith College<br />

Presented to: Kevin Bate<br />

Contractor: Midas Construction Ltd<br />

Client: Truro College<br />

East Durham College<br />

Presented to: Jeff Hedley<br />

Contractor: Miller Construction (UK) Ltd<br />

Client: East Durham College<br />

New Motherwell College<br />

Presented to: John Downey<br />

Contractor: Miller Construction (UK) Ltd<br />

Client: Motherwell College<br />

Whitburn C of E School<br />

Presented to: Dave Robinson<br />

Contractor: Miller Construction (UK) Ltd<br />

Client: Durham Diocesan Board of Education<br />

Bideford College BSF<br />

Presented to: Dave Pearce and Martin Kennedy<br />

Contractor: Morgan Ashurst plc<br />

Client: Devon County Council<br />

Larkhall Academy<br />

Presented to: Iain Reid<br />

Contractor: Morgan Ashurst plc<br />

Client: InspirED<br />

New Biomass Wing<br />

Presented to: Ken Bassett<br />

Contractor: Morgan Ashurst plc<br />

Client: University of East Anglia<br />

St Ninians High School<br />

Presented to: David Gray<br />

Contractor: Morgan Ashurst plc<br />

Client: East Dunbartonshire Council<br />

Trinity High School<br />

Presented to: Ally Wells<br />

Contractor: Morgan Ashurst plc<br />

Client: South Lanarkshire Council<br />

Wexham School<br />

Presented to: Kris Wadley<br />

Contractor: Morgan Ashurst plc<br />

Client: Slough Borough Council<br />

Wigan Life Centre<br />

Presented to: Brian Barritt<br />

Contractor: Morgan Ashurst plc<br />

Client: Hochtief Developments<br />

Assynt Water Treatment Works<br />

Presented to: Morrison Enpure Joint Venture<br />

Contractor: Morrison Enpure Joint Venture<br />

Client: Scottish Water Solutions<br />

Kibblesworth<br />

Presented to: Dave Watson<br />

Contractor: Morrison Facilities Services<br />

Client: <strong>The</strong> Gateshead Housing Company<br />

Manchester Metrolink Phase 3A - South<br />

Manchester Line & Depot<br />

Presented to: Keith Prince and the South<br />

Manchester Line & Depot Team<br />

Contractor: MPact-Thales Joint Venture (MPT)<br />

Client: Greater Manchester Passenger Transport<br />

Executive<br />

Alpha House, Gorefield House<br />

and Canterbury House<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: Mulalley & Co Ltd<br />

Client: Brent Housing Partnership<br />

Newham Homes Internal Modifications<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: Mulalley & Co Ltd<br />

Client: Newham Homes<br />

Newham Homes Low Rise Enveloping<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: Mulalley & Co Ltd<br />

Client: Newham Homes<br />

Newham Homes Relip Works<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: Mulalley & Co Ltd<br />

Client: Newham Homes<br />

Newham Homes Tall Blocks Enveloping<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: Mulalley & Co Ltd<br />

Client: Newham Homes


Bronze <strong>Award</strong> <strong>winners</strong><br />

Great Yarmouth Outer Harbour<br />

Presented to: Bob Perry<br />

Contractor: Nuttall John Martin<br />

Client: Great Yarmouth Port Company Ltd<br />

University of Derby Fenestration Project<br />

Presented to: <strong>The</strong> OPL Team<br />

Contractor: Office Projects Ltd<br />

Client: University of Derby<br />

Buildings 2&3 Bankside - RBS<br />

Presented to: Jed Gardner and Ian Morrow<br />

Contractor: Overbury plc<br />

Client: <strong>The</strong> Royal Bank of Scotland<br />

Warburg Pincus<br />

Presented to: Richard McPherson<br />

Contractor: Overbury plc<br />

Client: Warburg Pincus<br />

Orangefield Primary School<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: Patton Construction<br />

Client: Belfast Education & Library Board<br />

Tesco Bellshill<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: Patton Construction<br />

Client: Tesco Ltd<br />

Mary Datchelor<br />

Presented to: Brian Oatley<br />

Contractor: Peak Design & Construct Ltd<br />

Client: St George South London Ltd<br />

Pevensey Bay Sea Defences<br />

Presented to: Ian Thomas<br />

Contractor: Pevensey Coastal Defence Ltd<br />

Client: Environment Agency<br />

May<br />

Presented to: Dave Gill<br />

Contractor: PMC Construction &<br />

Development Services Ltd<br />

Client: Pavilion Housing Association<br />

Office Extension Goff Petroleum, Stanfield Road<br />

Presented to: David Whitehead<br />

Contractor: R G Carter Ltd<br />

Client: George J Goff Ltd<br />

123 Talbot Road, Blackpool<br />

Presented to: Tim Wright and Steve O'Connell<br />

Contractor: R P Tyson Construction Ltd<br />

Client: Great Places<br />

Waitrose Ltd - Wellington<br />

Presented to: Ian Gallaway<br />

Contractor: RG Group<br />

Client: Waitrose Ltd<br />

Hough Fold Way - Bolton<br />

Presented to: Keith Watterson<br />

Contractor: Rok<br />

Client: PFP Developments Ltd<br />

Mersea Island School<br />

Presented to: Dave Bloomfield<br />

Contractor: Rose Builders Ltd<br />

Client: Governors of Mersea Island School<br />

Sainsbury's Chester<br />

Presented to: Andy Williams<br />

Contractor: S Dudley and Sons Ltd<br />

Client: Sainsbury’s Chester<br />

Sainsbury's Pontllanfraith<br />

Presented to: Paul Jones<br />

Contractor: S Dudley and Sons Ltd<br />

Client: Sainsbury's Supermarkets Ltd<br />

Sainsbury’s Fosse Park<br />

Presented to: Mike Emery<br />

Contractor: S Dudley and Sons Ltd<br />

Client: Sainsbury's Supermarkets Ltd<br />

Christ Church Blue Boar Quad<br />

Presented to: Tony Sullivan<br />

Contractor: SDC Builders Ltd<br />

Client: Christ Church Oxford<br />

Bilton Grange Medical Centre<br />

Presented to: Cavan Gray-Nicholson and<br />

David Barley<br />

Contractor: Sewell Construction Ltd<br />

Client: Hull Citycare<br />

Burnley College and UCLAN Centre<br />

Re-Location Project<br />

Presented to: Mark Richardson<br />

Contractor: Shepherd Construction Ltd<br />

Client: Burnley College<br />

Richmond School<br />

Presented to: Peter Bell<br />

Contractor: Shepherd Construction Ltd<br />

Client: North Yorkshire County Council<br />

Walsall College - New Business and<br />

Learning Campus<br />

Presented to: Stuart Fanshaw<br />

Contractor: Shepherd Construction Ltd<br />

Client: Walsall College<br />

Project Inspire<br />

Presented to: Peter Munn<br />

Contractor: Sir Robert McAlpine Ltd<br />

Client: Serco Defence & Aerospace<br />

Holbrook House<br />

Presented to: Brian Nunn<br />

Contractor: Skanska Construction UK Ltd<br />

Client: Henderson Global Investors<br />

Weymouth Relief Road<br />

Presented to: Willie McCormick<br />

Contractor: Skanska Construction UK Ltd<br />

Client: Dorset County Council<br />

103 Tindal Street<br />

Presented to: Bill Cave, Matthew Bailey, Mick Ridley<br />

and Del Browne<br />

Contractor: Speller Metcalfe Malvern Ltd<br />

Client: John Christophers<br />

Energy from Waste Facility, La Collette<br />

Presented to: Andy Simm<br />

Contractor: Spie Batignolles, Camerons Ltd<br />

Client: Transport & Technical Services<br />

Beaufort Park<br />

Presented to: Paul Jeal<br />

Contractor: St George Central London Ltd<br />

Client: St George Central London Ltd<br />

<strong>The</strong> Minster College<br />

Presented to: Alan Lyons<br />

Contractor: Stepnell Ltd<br />

Client: Herefordshire Council<br />

YHA Coalport<br />

Presented to: Talbot Construction<br />

(Northern Region)<br />

Contractor: Talbot Design (Seale) Ltd<br />

Client: YHA (England & Wales) Ltd<br />

Campbell Park<br />

Presented to: Tony Butcher<br />

Contractor: Taylor Wimpey North Thames<br />

Client: Taylor Wimpey North Thames<br />

Arc, Bury St Edmunds<br />

Presented to: Simon Buck<br />

Contractor: Taylor Woodrow Construction<br />

Client: Centros UK Ltd<br />

Docklands Light Railway 3 Car Capacity<br />

Enhancement Project x2<br />

Presented to: Mark Howard<br />

Contractor: Taylor Woodrow Construction<br />

Client: Docklands Light Railway<br />

Terminal 4 CIP Lounge and A380 Stands and<br />

Gate Provision Project<br />

Presented to: Mike Elks<br />

Contractor: Taylor Woodrow Construction<br />

Client: BAA<br />

P6: Gravelly Hill - Preventative Maintenance<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: <strong>The</strong> Construction Management Framework<br />

Client: Highways Agency<br />

Hereford Custody Project<br />

Presented to: Paul Bennett<br />

Contractor: Thomas Vale Construction plc<br />

Client: Estate Services<br />

St Anne's Primary School<br />

Presented to: Dave Cull<br />

Contractor: Thomas Vale Construction plc<br />

Client: Worcestershire County Council<br />

Arundel Square<br />

Presented to: Chris Homewood<br />

Contractor: United House Ltd<br />

Client: Arundel Square Developments Ltd<br />

Stanley Morgan<br />

Presented to: David Martin<br />

Contractor: United House Ltd<br />

Client: Housing 21<br />

Tovil Green<br />

Presented to: Kevin J Ladley<br />

Contractor: United House Ltd<br />

Client: Kent Community Partnership Ltd<br />

Royal Inch Crescent Garden Remediation<br />

Presented to: Phil Dews<br />

Contractor: VHE Construction plc<br />

Client: Renfrewshire Council<br />

Yewlands School Technology College<br />

Presented to: Craig Pease<br />

Contractor: Vinci Construction<br />

Client: Sheffield City Council<br />

Office Development 2 West Regent Street<br />

Presented to: Michael Henderson<br />

Contractor: Vinci Construction Ltd<br />

Client: City Site Estates plc<br />

Grain LNG Tank 4<br />

Presented to: Stephen Pate<br />

Contractor: Vinci Construction UK<br />

Client: Chicago Bridge & Iron<br />

Aquinas College<br />

Presented to: John Offlands<br />

Contractor: Vinci Construction UK Ltd<br />

Client: Aquinas College<br />

Luton Sixth Form College<br />

Presented to: Mr Steve Diggines<br />

Contractor: Vinci Construction UK Ltd<br />

Client: Luton Sixth Form College<br />

<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong> 2010 National Site <strong>Award</strong>s | 15


Bronze <strong>Award</strong> <strong>winners</strong><br />

Project MoDEL<br />

Presented to: Philip Willmott<br />

Contractor: Vinci Construction UK Ltd<br />

Client: VSM Estates Ltd<br />

Ysgol Glan Usk School<br />

Presented to: Kieran Mulrooney<br />

Contractor: Vinci Construction UK Ltd<br />

Client: Newport Schools Solutions<br />

Sandwell Homes<br />

Presented to: Brian Price<br />

Contractor: Vinci Facilities<br />

Client: Sandwell Homes<br />

Windsor House, Slough<br />

Presented to: VolkerFitzpatrick Windsor House<br />

Slough Site Team<br />

Contractor: VolkerFitzpatrick Ltd<br />

Client: Lasalle UK Ventures Property 2 Sarl<br />

London Borough of Enfield Term Maintenance<br />

Contract 2006 - 2011<br />

Presented to: Steve Woolf<br />

Contractor: VolkerHighways<br />

Client: London Borough of Enfield<br />

Prescott Channel Lock and<br />

Water Control Structures<br />

Presented to: Roger Martin<br />

Contractor: VolkerStevin Ltd<br />

Client: British Waterways<br />

39-45 Cadogan Gardens<br />

Presented to: Peter Hicks<br />

Contractor: Walter Lilly & Co Ltd<br />

Client: Cadogan Estate Ltd<br />

VLA Weybridge<br />

Presented to: Russell Tinniswood<br />

Contractor: Walter Lilly & Co Ltd<br />

Client: DEFRA, VLA Weybridge<br />

Hummersknott School and Language College<br />

Presented to: Jason Henderson<br />

Contractor: Walter Thompson (Contractors) Ltd<br />

Client: Darlington Borough Council<br />

Linthorpe School, Kitchen & Classroom<br />

Extension<br />

Presented to: Ian Walker<br />

Contractor: Walter Thompson (Contractors) Ltd<br />

Client: Middlesbrough Council<br />

Aerospace & Automotive Academy<br />

Presented to: Nigel Wood<br />

Contractor: Warings Contractors Ltd<br />

Client: Farnborough College of Technology<br />

Berkshire College of Agriculture<br />

Presented to: Simon F Greaves, Jim Faulkner,<br />

Michael Wilson, Jetinder Maal and Tatiana Vodovoz<br />

Contractor: Warings Contractors Ltd<br />

Client: Berkshire College of Agriculture<br />

<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong><br />

Site Registration<br />

PO Box 75<br />

Ware<br />

Hertfordshire SG12 0YX<br />

Telephone 01920 485959<br />

Fax 01920 485958<br />

Freephone 0800 7831423<br />

www.ccscheme.org.uk<br />

siteenquiries@ccscheme.org.uk<br />

Printed on 9Lives recycled stock | Published 05/10 | Please recycle<br />

22-26 <strong>The</strong> Headrow<br />

Presented to: Adam Knowles and Steve Hart<br />

Contractor: Wates Construction Ltd<br />

Client: Capital & Counties<br />

HML Skipton Building Society<br />

Presented to: Stephen Hart<br />

Contractor: Wates Construction Ltd<br />

Client: Skipton Building Society<br />

HMP Brixton – New Kitchen<br />

Presented to: Gareth Neal<br />

Contractor: Wates Construction Ltd<br />

Client: Secretary of State for the Home Office<br />

National Audit Office<br />

Presented to: Vince Finnegan<br />

Contractor: Wates Construction Ltd<br />

Client: National Audit Office<br />

North Liverpool Academy<br />

Presented to: John Parry<br />

Contractor: Wates Construction Ltd<br />

Client: North Liverpool Academy Trust<br />

John Street<br />

Presented to: Paul Smith<br />

Contractor: Wates Living Space<br />

Client: East Thames Housing Association<br />

St Cuthberts Place<br />

Presented to: Frederick Lees<br />

Contractor: Wates Living Space (Midlands) Ltd<br />

Client: Zenith Development Partnership<br />

Wates Retail c/o Marks & Spencer<br />

Presented to: Paul Hey<br />

Contractor: Wates Retail<br />

Client: Marks & Spencer plc<br />

Unit C1 Maylands Wood Estate<br />

Presented to: James Sprack<br />

Contractor: Welbro Project Management Ltd<br />

Client: Brixton plc<br />

Harlow Carr Gardens<br />

Presented to: Carl Barrow<br />

Contractor: William Birch & Sons Ltd<br />

Client: Royal Horticulture Society<br />

Grange Park<br />

Presented to: Russell Pitman<br />

Contractor: William Davis Ltd<br />

Client: William Davis<br />

Morledge<br />

Presented to: Martin Bottomley<br />

Contractor: William Davis Ltd<br />

Client: William Davis<br />

Corby East Midlands International Pool<br />

Presented to: Martin Adie, Ian Williamson, Ben<br />

Ward, Mark Richards, Mark Panter, Neil Noakes<br />

and Thomas Prince<br />

Contractor: Willmott Dixon Construction Ltd<br />

Client: Corby Borough Council<br />

Crocketts Community Primary School<br />

Presented to: <strong>The</strong> Project Team<br />

Contractor: Willmott Dixon Construction Ltd<br />

Client: Sandwell Metropolitan Borough Council<br />

Manor Park Sports Complex<br />

Presented to: Dan Fisher<br />

Contractor: Willmott Dixon Construction Ltd<br />

Client: University of Surrey<br />

Rogiet Primary School<br />

Presented to: Andy Miles<br />

Contractor: Willmott Dixon Construction Ltd<br />

Client: Monmouthshire County Council<br />

University of Hertfordshire - Hatfield Campus<br />

Presented to: Nick Jude<br />

Contractor: Willmott Dixon Construction Ltd<br />

Client: University of Hertfordshire<br />

Ward Refurbishment - Prince Charles Hospital<br />

Presented to: Paul Lane<br />

Contractor: Willmott Dixon Construction Ltd<br />

Client: Cwym Taff Local Health Board<br />

Waterside <strong>The</strong>atre<br />

Presented to: Lee Bircumshaw<br />

Contractor: Willmott Dixon Construction Ltd<br />

Client: Aylesbury Vale District Council<br />

HMP Swaleside H Wing<br />

Presented to: Geoff Kempt<br />

Contractor: Willmott Dixon Construction Ltd<br />

(Dartford)<br />

Client: Ministry of Justice Custodial Property<br />

(MoJCP)<br />

Loxford School of Science and Technology<br />

Presented to: Chris Evans<br />

Contractor: Willmott Dixon Construction Ltd<br />

(Dartford)<br />

Client: Loxford School of Science and Technology<br />

Orpington College<br />

Presented to: Duncan Purvis<br />

Contractor: Willmott Dixon Construction Ltd<br />

(Dartford)<br />

Client: Orpington College<br />

Wolverton Park<br />

Presented to: Carl Mulkern and Tony Brook<br />

Contractor: Willmott Dixon Housing<br />

Client: Places for People Homes<br />

For full details of all the <strong>winners</strong>,<br />

visit www.ccscheme.org.uk or<br />

www.ccscheme.org.uk/industry-image<br />

FS 543981

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!