Silver Award winners - The Considerate Constructors Scheme
Silver Award winners - The Considerate Constructors Scheme
Silver Award winners - The Considerate Constructors Scheme
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2010<br />
National Site <strong>Award</strong>s<br />
This brochure lists all the 2010 National Site <strong>Award</strong> <strong>winners</strong>.<br />
For full details about all the <strong>winners</strong>, please visit the<br />
<strong>Scheme</strong>’s website www.ccscheme.org.uk and search the<br />
2010 <strong>Award</strong>s database. This information can also be found in<br />
the ‘<strong>Award</strong>s Special Edition’ of the <strong>Scheme</strong>’s Industry Image<br />
newsletter at www.ccscheme.org.uk/industry-image<br />
More than 2500 guests attended a series of 10 ceremonies in<br />
April and May, held to present the <strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong>’s<br />
2010 National Site <strong>Award</strong>s. Presented by a number of leading<br />
industry figures, 3 events took place in Manchester, 1 in<br />
Edinburgh and 6 in London. From over 7600 eligible sites,<br />
580 were selected as National Site <strong>Award</strong> <strong>winners</strong> in the categories<br />
of Gold, <strong>Silver</strong> and Bronze. One of the Gold winning sites was also<br />
honoured with the prestigious accolade of the UK’s Most <strong>Considerate</strong><br />
Site 2010, and 17 sites were recognised as runners up for this title.<br />
<strong>The</strong> <strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong>’s Annual National Site <strong>Award</strong>s<br />
have been presented every year since 1998 and are given to around<br />
the highest scoring 71/2% of sites, monitored by the <strong>Scheme</strong>, which<br />
have completed in the previous year. <strong>The</strong> <strong>Award</strong>s recognise sites’<br />
excellent standards of consideration towards their workforce, their<br />
neighbours and the environment.<br />
580 National Site <strong>Award</strong> <strong>winners</strong><br />
MOST CONSIDERATE SITE<br />
1 Most <strong>Considerate</strong> Site<br />
MOST CONSIDERATE SITE<br />
RUNNER UP<br />
63 Gold <strong>Award</strong>s<br />
173 <strong>Silver</strong> <strong>Award</strong>s<br />
17 Most <strong>Considerate</strong> Site<br />
Runners up 344 Bronze <strong>Award</strong>s
MOST CONSIDERATE SITE<br />
For full details of all the <strong>winners</strong>,<br />
visit www.ccscheme.org.uk or<br />
www.ccscheme.org.uk/industry-image<br />
MOST CONSIDERATE SITE<br />
RUNNER UP<br />
Most <strong>Considerate</strong> Site<br />
T4 Project, Beevor Court<br />
Presented to: Bryan Rooth<br />
Contractor: Clayfield Construction Ltd<br />
Client: Yorkshire Housing<br />
This project involved the construction of a support<br />
accommodation unit of a sensitive nature on a<br />
brownfield site.<br />
Despite not being easily visible to the general public,<br />
this site maintained scrupulous standards of cleanliness<br />
and overall presentation both within the site and on the<br />
boundary and surrounding areas. <strong>The</strong> total absence of<br />
obstructions or debris contributed significantly to safety<br />
levels for site operatives and visitors, and<br />
complemented extensive further safety initiatives to<br />
achieve a top score. <strong>The</strong> level of attention paid to<br />
environmental concerns was equally exemplary: bat<br />
and owl boxes were provided in the adjacent woodland<br />
and a unique habitat for slow-worms was carefully<br />
created. Energy usage, waste and the use of materials<br />
on site was also tightly controlled.<br />
<strong>The</strong> team worked with their waste contractor to<br />
facilitate a successful school visit to a waste separation<br />
plant, and assisted a local football club in clearing the<br />
ground of Japanese Knotweed. Staff welfare facilities<br />
Most <strong>Considerate</strong> Site runners up<br />
Newcastle-under-Lyme College<br />
Presented to: Ivan Gethin<br />
Contractor: BAM Construction Ltd - Midlands<br />
Client: Newcastle-under-Lyme College<br />
Chatterley Whitfield Heritage Country Park<br />
Presented to: Stoke on Trent City Council, Homes &<br />
Communities Agency and Birse Civils Ltd<br />
Contractor: Birse Civils Ltd<br />
Client: City of Stoke on Trent<br />
Guildhall Accommodation Project - North Block<br />
Presented to: Warren Glaister<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: Corporation of London<br />
Heathrow T5C<br />
Presented to: Stephen Sebborn<br />
Contractor: Carillion Building<br />
Client: BAA<br />
50-62 Eaton Square<br />
Presented to: <strong>The</strong> Bastows Project Management Team<br />
Contractor: D Bastow Ltd<br />
Client: Grosvenor Estates Ltd<br />
Norton Manor MT Workshops<br />
Presented to: Peter Haig and Ivan Dover<br />
Contractor: Debut Services (South West) Ltd<br />
Client: Defence Estates<br />
CCC Middlewich<br />
Presented to: Keith Huntington<br />
Contractor: GB Building Solutions Ltd<br />
Client: Avantage Cheshire Ltd<br />
St Catherine's Car Park, Fowey<br />
Presented to: Brendon Cocking and Craig Kendall<br />
Contractor: Gilbert & Goode Ltd<br />
Client: Ocean Group Ltd<br />
St Leger Homes of Doncaster – Conisbrough<br />
Presented to: Derek McDonald<br />
Contractor: Henry Boot Construction (UK) Ltd<br />
Client: St Leger Homes of Doncaster ltd<br />
were also of an exceptionally high standard, and active<br />
participation in the <strong>Scheme</strong> was clearly communicated<br />
to both staff and the community.<br />
This was a relatively small site, but one which was truly<br />
committed to every aspect of considerate site practices.<br />
Described by the <strong>Scheme</strong>'s Monitor as “<strong>The</strong> best I have<br />
ever seen”, it demonstrated what can be achieved by a<br />
Site Manager with limited resources and set a new<br />
benchmark for considerate construction.<br />
Structural Repairs to Airey Houses,<br />
Catcliffe & Ulley, Rotherham<br />
Presented to: Mick Wake<br />
Contractor: Henry Boot Construction (UK) Ltd<br />
Client: Rotherham Metropolitan Borough Council<br />
Victoria & Albert Museum<br />
Presented to: Andy Lambelle<br />
Contractor: Holloway White Allom Ltd<br />
Client: Victoria & Albert Museum<br />
TFL Palestra Building<br />
Presented to: ISG Project Team<br />
Contractor: ISG InteriorExterior<br />
Client: Transport for London<br />
CEIR - Torbay Hospital<br />
Presented to: Mike Mackey<br />
Contractor: Kier Western<br />
Client: South Devon Healthcare<br />
Blists Hill Victorian Town<br />
Presented to: John McStay<br />
Contractor: Mansell Construction Services Ltd<br />
Client: Ironbridge Gorge Museum Trust<br />
New Construction & Engineering Centre, South<br />
Eastern Regional College, Newtownards Campus<br />
Presented to: Mascott Construction Contract Team<br />
Contractor: Mascott Construction<br />
Client: South Eastern Regional College<br />
Aberdeen Union Square<br />
Presented to: Craig Giblett<br />
Contractor: Miller Construction (UK) Ltd<br />
Client: Hammerson plc<br />
Islington Contract 29<br />
Presented to: Steve Green<br />
Contractor: Mulalley & Co Ltd<br />
Client: Homes for Islington
Gold <strong>Award</strong> <strong>winners</strong><br />
A421 Improvements, M1 Junction 13 to Bedford<br />
Presented to: A421 Improvements<br />
Contractor: Balfour Beatty Major Projects<br />
Client: Highways Agency<br />
Tameside Hospital PFI<br />
Presented to: Tony Dowd<br />
Contractor: Balfour Beatty Northern Batch Hospitals<br />
Joint Venture<br />
Client: Consort Healthcare<br />
1 Millharbour<br />
Presented to: Alan Edmunds<br />
Contractor: Ballymore Properties Ltd<br />
Client: Ballymore Properties Ltd<br />
South Thames College<br />
Presented to: Andy Lock<br />
Contractor: BAM Construction Ltd - London<br />
Client: South Thames College<br />
Newcastle-under-Lyme College<br />
Presented to: Ivan Gethin<br />
Contractor: BAM Construction Ltd - Midlands<br />
Client: Newcastle-under-Lyme College<br />
Q3 Academy<br />
Presented to: John Cooper<br />
Contractor: BAM Construction Ltd - Midlands<br />
Client: Q3 Academy<br />
Mann Island Mixed Use Development<br />
Presented to: Neil Millward and Lee Bibby<br />
Contractor: BAM Construction Ltd - North West<br />
Client: Countryside Neptune LLP<br />
Fountain North Ltd<br />
Presented to: Malcolm Boyd and Kenneth Hutton<br />
Contractor: BAM Construction Ltd - Scotland<br />
Client: Fountain North Ltd<br />
A34 Alderley Edge & Nether Alderley Bypass<br />
Presented to: Cheshire East Council and Birse Civils Ltd<br />
Contractor: Birse Civils Ltd<br />
Client: Cheshire East Council<br />
Ironstone PIW at Lawley<br />
Presented to: Taylor Wimpey, Barratt, Persimmon and<br />
Birse Civils Ltd<br />
Contractor: Birse Civils Ltd<br />
Client: George Wimpey Major Projects/Persimmon<br />
Homes (West Midlands) Ltd/Barratt West Midlands<br />
Glencorse Water Treatment Works<br />
Presented to: Andy Old<br />
Contractor: Black & Veatch<br />
Client: Scottish Water<br />
Athletes Village, Stratford City<br />
Presented to: Damian Leydon<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: Olympic Delivery Authority<br />
Media City UK<br />
Presented to: John Hyne<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: Peel Holdings plc<br />
DS3 Project<br />
Presented to: Michael Morrissey<br />
Contractor: Canary Wharf Contractors Ltd<br />
Client: Canary Wharf Group<br />
New Office and Residential Development,<br />
Temple Back, Bristol<br />
Presented to: Steve Babbage and Ian Eggleton<br />
Contractor: Carillion Building<br />
Client: UK and EI with Westmark<br />
Queen Alexandra Hospital<br />
Presented to: Graham Aubrey<br />
Contractor: Carillion Building<br />
Client: Portsmouth Hospitals NHS Trust<br />
A34 Wolvercote Viaduct Replacement <strong>Scheme</strong><br />
Presented to: Darren Dobson<br />
Contractor: Costain Ltd<br />
Client: Highways Agency<br />
Church Village Bypass x2<br />
Presented to: Church Village Bypass Team<br />
Contractor: Costain Ltd<br />
Client: Rhondda Cynon Taf County Borough Council<br />
Lewisham Schools<br />
Presented to: Clive Kraus<br />
Contractor: Costain Ltd<br />
Client: Lewisham Building Schools for the Future LEP Ltd<br />
M27 J3-4 Widening<br />
Presented to: Craig Reade<br />
Contractor: Costain Ltd<br />
Client: Highways Agency<br />
St Germans Pumping Station<br />
Presented to: Ritchie Burcombe<br />
Contractor: Costain Ltd<br />
Client: Middle Level Commissioners<br />
Sites E & F, New England Quarter<br />
Presented to: Keith Benge<br />
Contractor: Denne Construction Ltd<br />
Client: Bio Regional Quintian LLP<br />
Belfast Sewers Project<br />
Presented to: John McReynolds<br />
Contractor: Farrans (Construction) Ltd<br />
Client: Northern Ireland Water<br />
William Wake House, Residential Mental Health<br />
Facility, St Andrew’s Healthcare<br />
Presented to: David Sizer<br />
Contractor: GB Building Solutions Ltd<br />
Client: St Andrew's Healthcare<br />
Bolsover Street Residential<br />
Presented to: Gerard Lonergan<br />
Contractor: John Sisk & Son Ltd<br />
Client: Bolsover Street Ltd<br />
Forth Valley Royal Hospital<br />
Presented to: Lindsay McGibbon<br />
Contractor: Laing O'Rourke Scotland Ltd<br />
Client: NHS Forth Valley<br />
Loch Leven Community Campus and<br />
Kinross High School<br />
Presented to: John Ritchie<br />
Contractor: Laing O'Rourke Scotland Ltd<br />
Client: Axiom Education (Perth & Kinross) Ltd<br />
Doddinghurst Primary School<br />
Presented to: Gerry Toohey<br />
Contractor: Lakehouse<br />
Client: Essex County Council<br />
Park House Enabling Works<br />
Presented to: Peter Savoy<br />
Contractor: Mace<br />
Client: Land Securities<br />
Royal Victoria Hospital, Phase 2B<br />
Presented to: John Roden<br />
Contractor: McLaughlin & Harvey Ltd<br />
Client: Belfast Health & Social Care Trust<br />
<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong> 2010 National Site <strong>Award</strong>s | 3
Gold <strong>Award</strong> <strong>winners</strong> <strong>Silver</strong> <strong>Award</strong> <strong>winners</strong><br />
One Waterloo Street<br />
Presented to: Ryan Broadley<br />
Contractor: Miller Construction (UK) Ltd<br />
Client: Halladale Ltd<br />
Pinderfields Hospital JV<br />
Presented to: Martin Buckley<br />
Contractor: PPHJV - Pinderfields and Pontefract<br />
Hospitals Joint Venture<br />
Client: <strong>The</strong> Mid-Yorkshire Hospitals NHS Trust<br />
Cadiz Court<br />
Presented to: Roy Buck<br />
Contractor: Rydon Construction Ltd<br />
Client: Metropolitan Home Ownership<br />
St Austell Town Centre Redevelopment<br />
Presented to: Sir Robert McAlpine<br />
Contractor: Sir Robert McAlpine Ltd<br />
Client: White River Development<br />
Watermark Place<br />
Presented to: Tony Cockerill<br />
Contractor: Sir Robert McAlpine Ltd<br />
Client: Watermark Place Oxford One Investment Ltd<br />
Skanska Walsall Joint Venture, Walsall Hospital<br />
Presented to: Colin Davidson<br />
Contractor: Skanska<br />
Client: Walsall Hospitals NHS Trust<br />
Skanska HMP Dovegate Houseblock Expansion<br />
Presented to: Simon Caron<br />
Contractor: Skanska Construction UK Ltd<br />
Client: Serco Ltd<br />
St Botolphs<br />
Presented to: Ian Shinn<br />
Contractor: Skanska Private<br />
Client: Minerva plc<br />
Imperial Wharf<br />
Presented to: Paul Stedman<br />
Contractor: St George Central London Ltd<br />
Client: St George Central London Ltd<br />
Circle Bath<br />
Presented to: Martin Thomas and Simon Buck<br />
Contractor: Taylor Woodrow Construction<br />
Client: Health Properties (Bath) Ltd<br />
Hungate Phase 1, York<br />
Presented to: Ray Atkinson<br />
Contractor: Taylor Woodrow, Vinci Construction UK Ltd<br />
Client: Hungate (York) Regeneration Ltd<br />
Rugby Western Relief Road<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: Warwickshire CC/Carillion<br />
Client: Warwickshire County Council/Carillion<br />
Stratford City Development<br />
Presented to: Derek Bellringer<br />
Contractor: Westfield Shoppingtowns Ltd<br />
Client: Stratford City Development Ltd<br />
University of Wales, Newport: City Campus<br />
Presented to: Ian Knight and Kanji Kerai<br />
Contractor: Willmott Dixon Construction Ltd<br />
Client: University of Wales<br />
‘‘’’<br />
<strong>The</strong>re is no doubt that the <strong>Considerate</strong> <strong>Constructors</strong><br />
<strong>Scheme</strong> is a huge influence in raising the standards<br />
in these difficult times. My congratulations to<br />
all the <strong>winners</strong>.<br />
James Wates, Chairman, UK Contractors’ Group<br />
Calderdale Highways Term Maintenance<br />
Presented to: Stuart Nichols<br />
Contractor: Amey LG Ltd<br />
Client: Calderdale Metropolitan Borough Council<br />
M6 Hard Shoulder Strengthening Junction 14-16<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: Amey plc<br />
Client: Highways Agency<br />
Foreshore & Albemarle<br />
Presented to: Neil Cornish and Kim Georgeson<br />
Contractor: Apollo Housing<br />
Client: Hyde Housing Association<br />
London & Quadrant Group<br />
Kitchen & Bathroom Programme<br />
Presented to: Steve Finch, Neil Quelch, Chris<br />
Williams, Caroline Mann and Mohamed Bangura<br />
Contractor: Apollo Housing<br />
Client: London and Quadrant Group<br />
A3/S16 Lawrence Avenue<br />
Presented to: James Darker and Lewis Melisi<br />
Contractor: Apollo in Partnership<br />
Client: Ascham Homes Ltd<br />
A3/S26 Higham Hill Various<br />
Presented to: Ben Guszpit and James Darker<br />
Contractor: Apollo in Partnership<br />
Client: Ascham Homes Ltd<br />
Attlee Terrace, Prospect Hill, London E17 3EH<br />
Presented to: Andrew Gratton<br />
Contractor: Apollo in Partnership<br />
Client: Ascham Homes Ltd<br />
Bulford Project<br />
Presented to: Bulford Project<br />
Contractor: Aspire Defence Capital Works<br />
Client: Project Allenby/Connaught<br />
Tidworth Project<br />
Presented to: Tidworth Project<br />
Contractor: Aspire Defence Capital Works<br />
Client: Project Allenby/Connaught<br />
A3 Hindhead<br />
Presented to: Paul Hoyland<br />
Contractor: Balfour Beatty Civil Engineering Ltd<br />
Client: Highways Agency<br />
New Victoria Hospital, Glasgow<br />
Presented to: Alasdair Fernie<br />
Contractor: Balfour Beatty Construction Scottish<br />
& Southern Ltd<br />
Client: Greater Glasgow Health Board<br />
Contracts 5O, 5P & 5Q Alderville Road<br />
Presented to: Bala Buvanendra<br />
Contractor: Balfour Beatty Refurbishment Ltd<br />
Client: Hammersmith & Fulham Homes<br />
Highbury Grove & Samuel Rhodes School<br />
Presented to: Robert Holmes<br />
Contractor: Balfour Beatty Construction Scottish<br />
& Southern Ltd<br />
Client: Transform Schools (Birmingham) Ltd<br />
Slingfield Mill<br />
Presented to: Robert Bassett<br />
Contractor: BAM Construction Ltd - Midlands<br />
Client: Henderson Global Investors<br />
Leeds City College Keighley Campus<br />
Presented to: Jason Pink<br />
Contractor: BAM Construction Ltd - North East<br />
Client: Leeds City College Keighley Campus.
Redcar & Cleveland College<br />
Presented to: Richard Tyler<br />
Contractor: BAM Construction Ltd - North East<br />
Client: Redcar and Cleveland College<br />
School of Earth & Environment<br />
Presented to: Geoff Wright<br />
Contractor: BAM Construction Ltd - North East<br />
Client: University of Leeds<br />
Selby College<br />
Presented to: Paul Nicholson<br />
Contractor: BAM Construction Ltd - North East<br />
Client: Selby College<br />
Bolton Community College<br />
Presented to: Paul Harris<br />
Contractor: BAM Construction Ltd - North West<br />
Client: Bolton Community College<br />
John Radcliffe Hospital, Cardiac<br />
Presented to: Alec Carr<br />
Contractor: BAM Construction Ltd - South East<br />
Client: Oxford Radcliffe Hospitals NHS Trust<br />
3 Assembly Square, Cardiff Bay<br />
Presented to: Andy Witnall<br />
Contractor: BAM Construction Ltd - Western<br />
Client: Cardiff Bay GP Ltd<br />
Royal Albert Memorial Museum (RAMM)<br />
Presented to: Nigel Harris<br />
Contractor: BAM Construction Ltd - Western<br />
Client: Exeter City Council<br />
Ysbyty Ystrad Fawr<br />
Presented to: Andrew Cavil<br />
Contractor: BAM Construction Ltd - Western<br />
Client: Aneurin Bevan Health Board<br />
A486 Llandysul Bypass<br />
Presented to: Lee O'Brien and Ray Jones<br />
Contractor: BAM Nuttall Ltd<br />
Client: Ceredigion County Council<br />
Broadland Flood Alleviation Project<br />
Compartment 11 Bure Phase 1 Flood Defences<br />
Presented to: Dan Russell<br />
Contractor: BAM Nuttall Ltd<br />
Client: Broadlands Environmental Services Ltd<br />
Cambridgeshire Guided Busway<br />
Presented to: Simon Whalley<br />
Contractor: BAM Nuttall Ltd<br />
Client: Cambridgeshire County Council<br />
Norlands Square / Holland Road Flood<br />
Alleviation <strong>Scheme</strong><br />
Presented to: Chris Smalley<br />
Contractor: Barhale Construction plc<br />
Client: Thames Water Utilities Ltd<br />
Olympic Park, Primary Foul Drainage<br />
Presented to: Shane Gorman<br />
Contractor: Barhale Construction plc<br />
Client: Olympic Delivery Authority<br />
Mayday House<br />
Presented to: Danny Ellis and Toni Byrne-Price<br />
Contractor: Berkeley First Ltd<br />
Client: Berkeley First Ltd<br />
Chelsea Bridge Wharf Phase 5<br />
Presented to: Sebastian Czajka<br />
Contractor: Berkeley Homes<br />
(Urban Renaissance) Ltd<br />
Client: Berkeley Homes (Urban Living) Ltd<br />
B1115 Relief Road Stowmarket<br />
Presented to: Birse Civils Ltd & Suffolk County Council<br />
Contractor: Birse Civils Ltd<br />
Client: Suffolk County Council<br />
Carlisle Northern Development Route<br />
Presented to: Connect Roads Ltd, Cumbria County<br />
Council and Birse Civils Ltd<br />
Contractor: Birse Civils Ltd<br />
Client: Connect Roads Ltd for Cumbria County Council<br />
Stanground Bypass Stage 2<br />
Presented to: Birse Civils Ltd & Persimmon Homes<br />
Contractor: Birse Civils Ltd<br />
Client: Persimmon Homes West Midlands<br />
Central Area Coast Protection <strong>Scheme</strong><br />
Presented to: <strong>The</strong> Central Area Coast Protection<br />
Project Team<br />
Contractor: Birse Coastal<br />
Client: Blackpool Council<br />
Stallingborough Sea Defences<br />
Presented to: <strong>The</strong> Stallingborough Sea Defences<br />
Project Team<br />
Contractor: Birse Coastal<br />
Client: Environment Agency<br />
240 Regent Street (Formerly Dickins & Jones)<br />
Presented to: Bovis Lend Lease 240 Regent Street Team<br />
Contractor: Bovis Lend Lease<br />
Client: Shearer Property Group & Delancey<br />
Accrington Academy<br />
Presented to: Accrington Academy Site Team<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: Lancashire County Council<br />
BBC West One Project Phase 2<br />
Presented to: Graham Stark<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: Land Securities<br />
Liverpool John Lennon Airport MSCP and Hotel<br />
Presented to: Sarah Griffith<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: Liverpool John Lennon Airport<br />
New Court<br />
Presented to: John O'Sullivan<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: Stanhope plc / NM Rothschild Ltd<br />
'One New Change'<br />
Presented to: One New Change Team<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: Land Securities<br />
St David's 2<br />
Presented to: Nick Wylie<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: St David's Partnership<br />
Greater Peterborough Health<br />
Investment Plan (Acute)<br />
Presented to: Peter Beauchamp<br />
Contractor: Brookfield Construction (UK) Ltd<br />
Client: Progress Health (Peterborough) plc<br />
Greater Peterborough Health Investment Plan<br />
(City Care Centre)<br />
Presented to: Nick Hull<br />
Contractor: Brookfield Construction (UK) Ltd<br />
Client: Progress Health (Peterborough) plc<br />
Tyntesfield House<br />
Presented to: Tyntesfield Team<br />
Contractor: C S Williams (Taunton) Ltd<br />
Client: <strong>The</strong> National Trust<br />
BP2 Fitout<br />
Presented to: Alec Vallintine and Jon Picksley<br />
Contractor: Canary Wharf Contractors Ltd<br />
Client: Canary Wharf Group<br />
Riverside South<br />
Presented to: Steve Prater and Pelham Dobson<br />
Contractor: Canary Wharf Contractors Ltd<br />
Client: Canary Wharf Group<br />
Chadderton Health & Well-Being Centre<br />
Presented to: Paul Doyle<br />
Contractor: Carillion Building<br />
Client: Community 1st Oldham Ltd<br />
IBC - MPC<br />
Presented to: Tony Coyle<br />
Contractor: Carillion Building<br />
Client: Olympic Delivery Authority<br />
LIFT Hartlepool Community Health Centre<br />
Presented to: John Tweddell and Leanne Swainston<br />
Contractor: Carillion Building<br />
Client: Hartlepool Primary Care Trust<br />
MMA Increment 1 Whittington Barracks<br />
Presented to: David Bowdley<br />
Contractor: Carillion Building<br />
Client: Defence Estates<br />
Northwood Development Project<br />
Presented to: Chris Wallace<br />
Contractor: Carillion Building<br />
Client: Ministry of Defence<br />
RAF Linton on Ouse - New Air Traffic Control Tower<br />
Presented to: Project Team<br />
Contractor: Carillion Building<br />
Client: Defence Estates<br />
Kendal, Riverside Place<br />
Presented to: Mark Conway<br />
Contractor: Carillion Civil Engineering<br />
Client: Kendal Riverside Development Ltd<br />
Walpole Process Upgrade<br />
Presented to: Andy Paton<br />
Contractor: Carillion Civil Engineering<br />
Client: Essex and Suffolk Water<br />
M4 Widening - Junction 29 to 32<br />
Presented to: Mike Park<br />
Contractor: Carillion Infrastructure<br />
Client: Welsh Assembly Government<br />
M6 Extension Carlisle to Guardsmill<br />
Presented to: Chris Hayton<br />
Contractor: Carillion Infrastructure<br />
Client: Highways Agency<br />
CLM Logistics & Security Team (Olympic Park)<br />
Presented to: CLM Logistics and Security Team<br />
Contractor: CLM Logistics and Security Team<br />
Client: Olympic Delivery Authority<br />
3 Shires Kingsway<br />
Presented to: Mike Thomson<br />
Contractor: Costain Ltd<br />
Client: Mentac Health NHS Services<br />
A40 Penblewin to Slebech Park Improvement<br />
Presented to: A40 Team - Penblewin to Slebech Park<br />
Improvement<br />
Contractor: Costain Ltd<br />
Client: Welsh Assembly Government<br />
<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong> 2010 National Site <strong>Award</strong>s | 5
<strong>Silver</strong> <strong>Award</strong> <strong>winners</strong><br />
Glasshoughton Link Road<br />
Presented to: Andrew Langley<br />
Contractor: Costain Ltd<br />
Client: Wakefield Metropolitan District Council<br />
University of Worcester City Campus Residences<br />
Presented to: <strong>The</strong> Costain Team<br />
Contractor: Costain Ltd<br />
Client: Worcester University<br />
Victoria Park, Colwyn Bay<br />
Presented to: Paul Hunter<br />
Contractor: Costain Ltd<br />
Client: Dwr Cymru Welsh Water<br />
Fortuna Park<br />
Presented to: Charlie Barbara<br />
Contractor: Countryside Properties (Southern) Ltd<br />
Client: Countryside Annington (Frith Lane) Ltd<br />
Tavistock Community Football Club<br />
Presented to: Steve Maw and Kelvin Evans<br />
Contractor: Dawnus Construction Ltd<br />
Client: Tavistock Community Football Club<br />
EnterpriseMouchel Harrow Depot<br />
Presented to: Darren O'Connor and Dennis Solomon<br />
Contractor: EnterpriseMouchel<br />
Client: Harrow Council<br />
Bodleian and Quadrangle Railings<br />
Presented to: William Jones<br />
Contractor: Eura Conservation Ltd<br />
Client: Oxford University Estate Directorate<br />
Grand Ocean<br />
Presented to: Kevin Moon<br />
Contractor: Explore Living South East<br />
Client: Explore Living plc<br />
Arecleoch Windfarm<br />
Presented to: Project Team<br />
Contractor: Farrans (Construction) Ltd<br />
Client: Scottish Power Renewables<br />
Belfast Streets Ahead Phase 1<br />
Presented to: Frank Hennity<br />
Contractor: Farrans (Construction) Ltd<br />
Client: Department of Social Development<br />
Templepatrick Primary School<br />
Presented to: Stephen Foster<br />
Contractor: Farrans (Construction) Ltd<br />
Client: North Eastern Education & Library Board<br />
Thaxton Mill Gardens Phase 3<br />
Presented to: Gareth McKnight<br />
Contractor: Farrans (Construction) Ltd<br />
Client: Farrans Homes<br />
Beeston, Phase 5<br />
Presented to: Mick Lomas<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Health & Environment Action Services<br />
Stream 2 Foxhill<br />
Presented to: Andy Mann<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Sheffield Homes<br />
Helena Kitchens Phase 13<br />
Presented to: Barry Fallows<br />
Contractor: Frank Rogers Building Contractors<br />
Client: Helena Partnerships Ltd<br />
Thornton Junior School<br />
Presented to: John Dudley, Leanne Burden, David<br />
Tomlin and Andrew Fleming<br />
Contractor: G F Tomlinson Birmingham Ltd<br />
Client: Birmingham City Council<br />
St Pancras Chambers<br />
Presented to: Bob Ryan<br />
Contractor: Galliford Try Construction (South) Ltd<br />
Client: Manhattan Loft Corporation Ltd<br />
Northfields, Turner Road<br />
Presented to: David Wright<br />
Contractor: Galliford Try Partnerships Ltd<br />
Client: Sentient Ventures LLP<br />
Malvins Close Primary School<br />
Presented to: Harry Gallon and Dave Benson<br />
Contractor: GB Building Solutions Ltd<br />
Client: Northumberland County Council<br />
Harperbury Hospital (CAMHS Unit)<br />
Presented to: Mick Brotherton, Roderick Scott,<br />
Martin Minchev and Mark Dash<br />
Contractor: Geoffrey Osborne Ltd<br />
Client: Hertfordshire Partnership NHS Foundation Trust<br />
Rugby Multi-storey Car Park<br />
Presented to: Paul Reader<br />
Contractor: Geoffrey Osborne Ltd<br />
Client: Network Rail<br />
St Agnes<br />
Presented to: Brendon Leech, Steve Ridge and<br />
Mick Coates<br />
Contractor: Gilbert & Goode Ltd<br />
Client: Ocean Group Ltd<br />
Pond Park Primary School<br />
Presented to: Victor Hamilton<br />
Contractor: Graham Construction<br />
Client: South Eastern Education & Library Board<br />
St Leger Homes of Doncaster - Scawsby<br />
Presented to: Derek McDonald<br />
Contractor: Henry Boot Construction (UK) Ltd<br />
Client: St Leger Homes of Doncaster Ltd<br />
Fit-Out Works, Sports Park, <strong>The</strong> Amateur<br />
Swimming Association<br />
Presented to: Mark Greasby<br />
Contractor: Herbert Baggaley Construction Ltd<br />
Client: Amateur Swimming Association<br />
Sports Park, Loughborough University<br />
Presented to: Mark Greasby<br />
Contractor: Herbert Baggaley Construction Ltd<br />
Client: Loughborough University<br />
Combe Down<br />
Presented to: Robert Narbett<br />
Contractor: Hydrock Contracting Ltd<br />
Client: Bath & North East Somerset Council<br />
Caxton House<br />
Presented to: Shane Clarke<br />
Contractor: Ibex Interiors Ltd<br />
Client: Department of Work and Pensions<br />
Crown House<br />
Presented to: Steve Kitchen<br />
Contractor: ISG Interior Exterior plc<br />
Client: UKI Kingsway<br />
Marshall Street Regeneration<br />
Presented to: Alan Mason<br />
Contractor: ISG InteriorExterior<br />
Client: Marshall Street Regeneration Ltd<br />
Sandon Valley House, East Hanningfield<br />
Presented to: David Afford<br />
Contractor: ISG Jackson<br />
Client: Essex & Suffolk Water<br />
Suffolk One<br />
Presented to: Steven Yanusauskas<br />
Contractor: ISG Jackson<br />
Client: Suffolk County Council<br />
Sainsbury's Store, Pulborough<br />
Presented to: Terry Heath<br />
Contractor: ISG Pearce<br />
Client: Sainsbury's Supermarkets Ltd<br />
Cloth Hall Court, Leeds<br />
Presented to: Anthony Mitchell and Roy Ward<br />
Contractor: ISG Regions<br />
Client: Highcross Strategic Advisers Ltd<br />
Cypress Road, Kendray<br />
Presented to: Craig Hughes<br />
Contractor: Keepmoat Homes Ltd<br />
Client: Keepmoat Homes<br />
Mid Kent College, Lower Lines<br />
Presented to: Chris Burden, Jim Batty and the<br />
MKC Project Team<br />
Contractor: Kier Build<br />
Client: Mid Kent College<br />
Academic Building East<br />
Presented to: Adrian Cooper<br />
Contractor: Kier Eastern<br />
Client: University of East Anglia<br />
Reepham High School<br />
Presented to: William Hagan<br />
Contractor: Kier Eastern<br />
Client: Reepham High School<br />
<strong>The</strong> Old Royal Infirmary Building<br />
Presented to: Ron Hughes<br />
Contractor: Kier North West<br />
Client: University of Liverpool<br />
Lower Shenley, Phase 2<br />
Presented to: Ron Hobbs<br />
Contractor: Kier Partnership Homes<br />
Client: Bournville Village Trust<br />
One Reading Central<br />
Presented to: James Carpenter<br />
Contractor: Kier Regional<br />
Client: Kier Property<br />
Mountbatten Centre<br />
Presented to: Benn Hunter, James Ashley and<br />
Andrew Oliver<br />
Contractor: Kier Southern<br />
Client: Broadwater Leisure Ltd<br />
St Georges C of E Foundation School<br />
Presented to: Darren Chandler<br />
Contractor: Kier Southern<br />
Client: LEP<br />
St James Hospital<br />
Presented to: Andrew Oliver<br />
Contractor: Kier Southern<br />
Client: Portsmouth City Primary Care Trust<br />
‘‘’’<br />
When I was writing my report in 1994 I went out of<br />
my way to stress that best practice was very<br />
important in the construction industry. I am<br />
delighted to support the <strong>Considerate</strong> <strong>Constructors</strong><br />
<strong>Scheme</strong> which is doing such a very good job.<br />
Sir Michael Latham
<strong>Silver</strong> <strong>Award</strong> <strong>winners</strong><br />
Link Building and Student Union<br />
Presented to: Simon Parsons<br />
Contractor: Kier Western<br />
Client: University of Plymouth<br />
Peninsula Dental School<br />
Presented to: Andrew Nixson<br />
Contractor: Kier Western<br />
Client: Plymouth Hospitals NHS Trust<br />
M4 JCT 14-15 Baydon; Major Maintenance<br />
Presented to: Merv Bowd<br />
Contractor: Lafarge Contracting<br />
Client: Highways Agency<br />
NDC1<br />
Presented to: Allan Irvine<br />
Contractor: Laing O'Rourke / Crown House<br />
Technologies<br />
Client: Digital Realty Trust<br />
<strong>The</strong> Co-Operative Academy<br />
Presented to: Graham Fenton<br />
Contractor: Laing O'Rourke Construction North Ltd<br />
Client: Manchester City Council<br />
Imperial College - Eastside Student Accommodation<br />
Presented to: Nigel Bunce<br />
Contractor: Laing O'Rourke Construction South Ltd<br />
Client: Imperial College<br />
Station Plaza, Hastings College<br />
Presented to: Kevin Watts<br />
Contractor: Laing O'Rourke Construction South Ltd<br />
Client: John Laing Projects & Developments Ltd<br />
West Lothian Civic Centre<br />
Presented to: Alistair Johnston<br />
Contractor: Laing O'Rourke Scotland Ltd<br />
Client: West Lothian Council<br />
Cardiff City Stadium<br />
Presented to: Paul Norman<br />
Contractor: Laing O'Rourke Wales and West<br />
Client: Cardiff City Stadium Ltd<br />
Corsham Development Project<br />
Presented to: Nicholas Featherstone<br />
Contractor: Laing O'Rourke Wales and West<br />
Client: Inteq Services Ltd<br />
Southmead Hospital P21 Enabling Works<br />
Presented to: Douglas Moore<br />
Contractor: Laing O'Rourke Wales and West<br />
Client: North Bristol NHS Trust<br />
Haearn Mawr<br />
Presented to: Mike Walker, Nicole Barnes and<br />
Kevin White<br />
Contractor: Leadbitter<br />
Client: Leadbitter Homes<br />
Hanbury Grove<br />
Presented to: Kevin Beckett, Steve Ellaway, Simon<br />
Thomas and Nicole Barnes<br />
Contractor: Leadbitter<br />
Client: Leadbitter Homes/Melin Homes<br />
New Bettws High School<br />
Presented to: Aeron Thomas, Simon Owen<br />
and Mike Little<br />
Contractor: Leadbitter<br />
Client: Newport City Council<br />
Camp Hill Phase 2<br />
Presented to: Adam Cooper and Tim Harrison<br />
Contractor: Lovell Partnerships Ltd<br />
Client: Pride in Camphill<br />
Dunster Place<br />
Presented to: Carl Deakin and Tim Harrison<br />
Contractor: Lovell Partnerships Ltd<br />
Client: Jephson Housing Association<br />
Gloucester City Homes<br />
Presented to: Neil Turner and Sandra Shiner<br />
Contractor: Lovell Partnerships Ltd<br />
Client: Gloucester City Homes<br />
Year 2 SCA10<br />
Presented to: Peter Hampton<br />
Contractor: Lovell Partnerships Ltd<br />
Client: Homes for Haringey Ltd<br />
Teddington School Project<br />
Presented to: John Fraser<br />
Contractor: Mace Plus Ltd<br />
Client: London Borough of Richmond Upon Thames<br />
Belvedere Academy<br />
Presented to: Mark Parker<br />
Contractor: Mansell Construction Services Ltd<br />
Client: GDST Academy Trust Board<br />
Crosby Lakeside Adventure Centre<br />
Presented to: Steve Wimpenny<br />
Contractor: Mansell Construction Services Ltd<br />
Client: Sefton Metropolitan Borough Council<br />
Chapel Road/Marine Parade Road Safety<br />
Improvement - Worthing<br />
Presented to: Nigel Steer<br />
Contractor: May Gurney Ltd<br />
Client: WSCC Customers & Communities<br />
North Leamington School Project<br />
Presented to: Mark Alker<br />
Contractor: Miller Construction (UK) Ltd<br />
Client: Warwickshire County Council<br />
University of Brighton<br />
Presented to: Clive Lavington<br />
Contractor: Miller Construction (UK) Ltd<br />
Client: University of Brighton<br />
222/236 Grays Inn Road<br />
Presented to: Stephen Jones<br />
Contractor: MITIE Interiors Ltd<br />
Client: TelerealTrillium<br />
Harrop Fold School<br />
Presented to: Paul Heald<br />
Contractor: Morgan Ashurst plc<br />
Client: Hochtief Developments<br />
Thames Water Ring Main Extension-Brixton to<br />
Honor Oak. Contract 4DCF/A1<br />
Presented to: David Brown<br />
Contractor: Morgan Est plc<br />
Client: Thames Water Utilities Ltd<br />
Cawood & Ryther<br />
Presented to: Mike Entwistle of Morrison<br />
Construction and Adrian Millward of the<br />
Environment Agency<br />
Contractor: Morrison Construction<br />
Client: Environment Agency<br />
Hackney Street Properties<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: Mulalley & Co Ltd<br />
Client: Hackney Homes<br />
Watford Community Housing Trust x2<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: Mulalley & Co Ltd<br />
Client: Watford Community Housing Trust<br />
Blackpool Coastal Housing, Energy Efficient<br />
Heating and Electrical Upgrades<br />
Presented to: Aaron Mullan and Wayne Lynchey<br />
Contractor: Read and Errington<br />
Client: Blackpool Coastal Homes<br />
Sainsbury's Supermarkets Ltd -<br />
Chichester Extension<br />
Presented to: John Wilson<br />
Contractor: RG Group<br />
Client: Sainsbury's Supermarkets Ltd<br />
St Paul's Academy<br />
Presented to: Gareth Phillips<br />
Contractor: Rydon Construction Ltd<br />
Client: St Paul's Academy Trust<br />
<strong>The</strong> Open University Catering Hub<br />
Presented to: Iain Waterman<br />
Contractor: SDC Builders Ltd<br />
Client: <strong>The</strong> Open University<br />
Rockliffe Hall Hotel and Golf Course<br />
Presented to: Neil Matthias<br />
Contractor: Shepherd Construction Ltd<br />
Client: Rockliffe Hall Ltd<br />
PHP - Safe as Houses<br />
Presented to: <strong>The</strong> Electrical Department of Signpost<br />
Services Ltd<br />
Contractor: Signpost Services Ltd<br />
Client: Poole Housing Partnership Ltd<br />
New Tesco Store, Litherland<br />
Presented to: Nigel Standage<br />
Contractor: Simons Group<br />
Client: Tesco Stores Ltd<br />
West Jesmond Primary School<br />
Presented to: Lee Wayper<br />
Contractor: Sir Robert McAlpine Ltd<br />
Client: Newcastle City Council<br />
Reshaping Health Services Southern Derbyshire<br />
Presented to: Martin Quaid<br />
Contractor: Skanska<br />
Client: South Derbyshire Acute Hospitals<br />
Kings Mill Hospital<br />
Presented to: Skanska Central Nottinghamshire J.V.<br />
Contractor: Skanska Central Nottinghamshire J.V.<br />
Client: Central Nottinghamshire Hospitals plc<br />
University of Plymouth<br />
Presented to: Dean Womack<br />
Contractor: South West Highways Ltd<br />
Client: University of Plymouth<br />
Battersea Reach Block 4<br />
Presented to: Chris Wyeth<br />
Contractor: St George South London Ltd<br />
Client: St George South London Ltd<br />
Parkwest<br />
Presented to: Sean Chappell<br />
Contractor: St George West London Ltd<br />
Client: St George West London Ltd<br />
Queen Mary's Place<br />
Presented to: Bob Rosenberger<br />
Contractor: St James Group<br />
Client: St James Developments<br />
Bridge Street<br />
Presented to: Richard Farmer<br />
Contractor: Staffordshire Highways<br />
Client: Staffordshire County Council<br />
<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong> 2010 National Site <strong>Award</strong>s | 7
<strong>Silver</strong> <strong>Award</strong> <strong>winners</strong><br />
Terminal 4 Check-In WorksTerminal 4 Check-In<br />
Extension & Refurbishment Works<br />
Presented to: Colin Howell<br />
Contractor: Taylor Woodrow Construction<br />
Client: BAA<br />
R135: Wigmore Viaduct - Concrete Repairs and<br />
Cathodic Protection<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: <strong>The</strong> Construction Management<br />
Framework<br />
Client: Highways Agency<br />
Birmingham Decent Homes Structural<br />
Presented to: Roger Martin<br />
Contractor: Thomas Vale Construction plc<br />
Client: Birmingham City Council<br />
Rocklands SEN School<br />
Presented to: Simon Sparkes<br />
Contractor: Thomas Vale Construction plc<br />
Client: Staffordshire County Council<br />
City Library Newcastle<br />
Presented to: Craig Davison<br />
Contractor: Tolent Construction Ltd<br />
Client: Kajima Ltd<br />
King's Cross Station Redevelopment Programme<br />
Presented to: King's Cross Project Team<br />
Contractor: Vinci Construction UK<br />
Client: Network Rail<br />
Whiston Hospital<br />
Presented to: Whiston Hospital PFI Team<br />
Contractor: Vinci Construction UK<br />
Client: St Helens & Knowsley NHS Trust<br />
Highbury College<br />
Presented to: Craig MacNair<br />
Contractor: VolkerFitzpatrick<br />
Client: Highbury College<br />
London Borough of Hackney Term Maintenance<br />
Contract 2007-2011<br />
Presented to: Mark Mascar<br />
Contractor: Volkerhighways Ltd<br />
Client: London Borough of Hackney<br />
Chatburn Station Bridge Reconstruction<br />
Presented to: Glenn Harrison<br />
Contractor: VolkerStevin Ltd<br />
Client: Lancashire County Council<br />
Manor C of E School, Millfield Lane, York<br />
Presented to: Mark Powell<br />
Contractor: Wates Construction<br />
Client: <strong>The</strong> Governors of Manor School<br />
Harbour PRU Lowestoft<br />
Presented to: Dale Newcombe<br />
Contractor: Wates Construction Ltd<br />
Client: Suffolk County Council<br />
National Audit Office<br />
Presented to: Vince Finnegan<br />
Contractor: Wates Construction Ltd<br />
Client: National Audit Office<br />
Perivale Primary School<br />
Presented to: David Rowsell<br />
Contractor: Wates Construction Ltd<br />
Client: Perivale Primary School<br />
Public Service Village-Bury St Edmunds<br />
Presented to: Laurence Dobkin<br />
Contractor: Wates Construction Ltd<br />
Client: Suffolk County Council<br />
Stockport College Project - New Workshops<br />
Presented to: Shane Benson<br />
Contractor: Wates Construction Ltd<br />
Client: Stockport College<br />
WSCC<br />
Presented to: Paul Richardson<br />
Contractor: Wates Interiors<br />
Client: West Sussex County Council<br />
Bognor Regis Community College-<br />
Secondary School<br />
Presented to: Merv Pollington<br />
Contractor: Willmott Dixon Construction<br />
Client: West Sussex County Council<br />
Chessington Community College<br />
Presented to: Neil Tugwell<br />
Contractor: Willmott Dixon Construction Ltd<br />
Client: Royal Borough of Kingston upon Thames<br />
Kendrick School & Project Faraday<br />
Presented to: Leon Bastajian<br />
Contractor: Willmott Dixon Construction Ltd<br />
Client: Reading Borough Council<br />
St Annes Academy<br />
Presented to: Brian Hanlon<br />
Contractor: Willmott Dixon Construction Ltd<br />
Client: Rochdale Council<br />
Stockwell Park High School<br />
Presented to: Adam Worrall<br />
Contractor: Willmott Dixon Construction Ltd<br />
Client: London Borough of Lambeth<br />
St Georges Keyworker Accommodation<br />
Tooting Site<br />
Presented to: Tony Brook<br />
Contractor: Willmott Dixon Housing<br />
Client: Thames Valley Housing Association<br />
‘‘’’<br />
I would like to congratulate all the <strong>Considerate</strong><br />
<strong>Constructors</strong> <strong>Scheme</strong>’s 2010 National Site <strong>Award</strong><br />
<strong>winners</strong> for the exceptional standards of<br />
performance they have attained in order to win<br />
their <strong>Award</strong>s.<br />
<strong>The</strong> commitment of the <strong>winners</strong> to their<br />
companies, to the <strong>Scheme</strong> and to our industry is<br />
both impressive and commendable; not least<br />
against the backdrop of a very difficult 12<br />
months for construction. All the <strong>winners</strong> are<br />
therefore most deserving of this accolade.<br />
Stephen Ratcliffe<br />
Director, UK Contractors’ Group
Bronze <strong>Award</strong> <strong>winners</strong><br />
Eastney Pumping Station<br />
Presented to: Andy Woodroffe<br />
Contractor: 4Delivery Ltd<br />
Client: Southern Water<br />
M61 Junction 3-4 Safety Fence Hybrid<br />
Presented to: Peter Young<br />
Contractor: A one +<br />
Client: Highways Agency<br />
M53 Junctions 7-8 Roads & Structures Hybrid <strong>Scheme</strong><br />
Presented to: Stan Jukes<br />
Contractor: A one +<br />
Client: Highways Agency<br />
North East Depot<br />
Presented to: Chris Jackman<br />
Contractor: Amey LG Ltd<br />
Client: Transport for London<br />
Park Royal - North West Depot<br />
Presented to: Harry Singh Ahluwalia<br />
Contractor: Amey LG Ltd<br />
Client: Transport for London<br />
Area 13 MAC Skirsgill Depot<br />
Presented to: Angela Moffet<br />
Contractor: AmeyMouchel<br />
Client: Highways Agency<br />
Barnet LAPN<br />
Presented to: Peter Blackburn<br />
Contractor: Apollo Housing<br />
Client: Barnet Homes<br />
Affinity Sutton, Broomleigh Major Works Project<br />
Presented to: James Dickens, Lee Anderson, Keith<br />
Bassett, Harry Lovett, Sebastian Lee<br />
Contractor: Apollo in Partnership<br />
Client: Affinity Sutton Group<br />
Area 2 <strong>Scheme</strong> 43 - Wood St - Various Properties<br />
Presented to: Andrew Gratton and Terry Linnett<br />
Contractor: Apollo in Partnership<br />
Client: Ascham Homes Ltd<br />
<strong>Scheme</strong> 35-Brookdale Road, Bryon Road,<br />
Cottenham Road, Hawthorn Road, Jewel Road,<br />
Melville Road, Milton Road, London E17<br />
Presented to: Andrew Gratton and Ben Guszpit<br />
Contractor: Apollo in Partnership<br />
Client: Ascham Homes Ltd<br />
<strong>Scheme</strong> 38 - Lester House, Beech Hall Road,<br />
Malvern Avenue, London IG8<br />
Presented to: James Darker and Darren Hickey<br />
Contractor: Apollo in Partnership<br />
Client: Ascham Homes Ltd<br />
<strong>Scheme</strong> 39 Hale End Road, Hillcrest Road, London<br />
Presented to: James Darker and John Dodge<br />
Contractor: Apollo in Partnership<br />
Client: Ascham Homes Ltd<br />
Townfield Community Centre<br />
Presented to: Nagin Karsan and Lloyd Phillips<br />
Contractor: Apollo Property Services Group Ltd<br />
Client: Hillingdon Homes Ltd<br />
Bramshott Place Village<br />
Presented to: Andrew Maull<br />
Contractor: Ardmore Construction Ltd<br />
Client: Urban Renaissance Villages<br />
<strong>Silver</strong>dale Colliery New Vision Reclamation Project<br />
Presented to: Ascot Environmental Ltd, WYG<br />
Engineering Ltd & Homes & Communities Agency<br />
Contractor: Ascot Environmental Ltd<br />
Client: Homes & Communities Agency (Birmingham)<br />
Linwood Regeneration Programme<br />
Presented to: Brian Pettigrew<br />
Contractor: Ashleigh Scotland Ltd<br />
Client: Sanctuary Scotland Housing Association<br />
Aldershot Project<br />
Presented to: Aldershot Project<br />
Contractor: Aspire Defence Capital Works<br />
Client: Project Allenby/Connaught<br />
Castle View Enterprise Academy<br />
Presented to: Mark Graham<br />
Contractor: Balfour Beatty Construction Northern Ltd<br />
Client: Sunderland City Council<br />
Barnet Homes Contracts HW2/HF6/HW9<br />
Presented to: Steve Buckley<br />
Contractor: Balfour Beatty Refurbishment Ltd<br />
Client: Barnet Homes<br />
Unison Headquarters<br />
Presented to: Paul Joyce<br />
Contractor: BAM Construction Ltd - London<br />
Client: Unison<br />
Grace Academy Coventry<br />
Presented to: Scott Marsh<br />
Contractor: BAM Construction Ltd - Midlands<br />
Client: Grace Academy Coventry<br />
Severn Trent Centre<br />
Presented to: BAM Site Team<br />
Contractor: BAM Construction Ltd - Midlands<br />
Client: Stoford Projects Ltd<br />
ASDA Ashington<br />
Presented to: Chris Fenwick<br />
Contractor: BAM Construction Ltd - North East<br />
Client: ASDA<br />
SAS Building<br />
Presented to: Richard Tyler<br />
Contractor: BAM Construction Ltd - North East<br />
Client: University of Newcastle Upon Tyne<br />
BAE Systems Building 608 & 609<br />
Presented to: Sarah Payne<br />
Contractor: BAM Construction Ltd - North West<br />
Client: BAE Systems<br />
South Cheshire College<br />
Presented to: Mark Ferrie<br />
Contractor: BAM Construction Ltd - North West<br />
Client: South Cheshire College<br />
St Peters Square<br />
Presented to: David Oldfield<br />
Contractor: BAM Construction Ltd - North West<br />
Client: BAM Properties<br />
Gosport War Memorial Hospital - Redevelopment<br />
Presented to: Nick Butler<br />
Contractor: BAM Construction Ltd - South East<br />
Client: Hampshire Primary Care Trust<br />
Project Gemini<br />
Presented to: Rick Barot<br />
Contractor: BAM Construction Ltd - South East<br />
Client: AWE<br />
Southampton Hospital P21 Projects<br />
Presented to: Rob Britten, Simon Pervin and<br />
Matt Crookes<br />
Contractor: BAM Construction Ltd - South East<br />
Client: Southampton University Hospitals NHS Trust<br />
<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong> 2010 National Site <strong>Award</strong>s | 9
Bronze <strong>Award</strong> <strong>winners</strong><br />
West Herts College Hempstead Road<br />
Re-Development<br />
Presented to: Adam Harding<br />
Contractor: BAM Construction Ltd, South East<br />
Client: West Herts College<br />
Aberaeron Coastal Protection <strong>Scheme</strong><br />
Presented to: Ray Jones<br />
Contractor: BAM Nuttall Ltd<br />
Client: Ceredigion County Council<br />
Blackpool & Fleetwood Tramway<br />
Presented to: Michael Grace<br />
Contractor: BAM Nuttall Ltd<br />
Client: Blackpool Borough Council<br />
Hannafore Outfall Replacement <strong>Scheme</strong><br />
Presented to: Peter Stanton and David Folds<br />
Contractor: BAM Nuttall Ltd<br />
Client: South West Water<br />
Reading Southside Project<br />
Presented to: John Morrison<br />
Contractor: BAM Nuttall Ltd<br />
Client: Foudry Properties Ltd<br />
Restormel WTW<br />
Presented to: David Folds<br />
Contractor: BAM Nuttall Ltd<br />
Client: South West Water<br />
A20 Roundhill Tunnel<br />
Presented to: Andy Fooks<br />
Contractor: BAM Nuttall Ltd/Hanson JV<br />
Client: Highways Agency<br />
Albrighton Flood Alleviation <strong>Scheme</strong><br />
Presented to: Midlands Business Unit<br />
Contractor: Barhale Construction plc<br />
Client: Severn Trent Water<br />
Fisherman's Hut<br />
Presented to: Andrew Banks<br />
Contractor: Barhale Construction plc<br />
Client: Scottish Water Solutions<br />
London Road Flood Alleviation <strong>Scheme</strong><br />
Presented to: Ron Hastings<br />
Contractor: Barhale Construction plc<br />
Client: Thames Water Utilities Ltd<br />
Longdon Green to Gentleshaw Trunk Main<br />
Presented to: Midlands Business Unit<br />
Contractor: Barhale Construction plc<br />
Client: South Staffordshire Water plc<br />
Block G Extension<br />
Presented to: Neil Crowther<br />
Contractor: Barnwood Construction Ltd<br />
Client: <strong>The</strong> Governors of Cheltenham Bournside School<br />
Launch Pad Plot 3400<br />
Presented to: Lew Whitehead and Neil Crowther<br />
Contractor: Barnwood Construction Ltd<br />
Client: Robert Hitchins Ltd<br />
Whitelee Wind Farm Visitor Centre<br />
Presented to: Robert Gamble<br />
Contractor: Barr Construction<br />
Client: Scottish Power Renewables (UK) Ltd<br />
<strong>The</strong> Heathers<br />
Presented to: Daryl Walsh<br />
Contractor: Barratt Homes Manchester<br />
Client: Barratt Manchester<br />
Great West Quarter, Brentford<br />
Presented to: Daniel Farenden<br />
Contractor: Barratt Homes West London<br />
Client: Barratt West London<br />
Chelsea Bridge Wharf, Block A<br />
Presented to: Jamie Street<br />
Contractor: Berkeley Homes (Urban Renaissance) Ltd<br />
Client: Berkeley Homes (Urban Renaissance) Ltd<br />
Fryston & Wheldale Collieries Reclamation<br />
Presented to: Wakefield Metropolitan District<br />
Council, Yorkshire Forward and Birse Civils<br />
Contractor: Birse Civils<br />
Client: Yorkshire Forward/Wakefield MDC<br />
University Square/Brownlow Hill<br />
Presented to: Liverpool City Council, 20/20<br />
Liverpool and Birse Civils Ltd<br />
Contractor: Birse Civils Ltd<br />
Client: Liverpool City Council<br />
Wanlip STW<br />
Presented to: Wanlip STW Team<br />
Contractor: Biwater Treatment Ltd<br />
Client: Severn Trent Water Ltd<br />
Ewden WTW (Raw Water Colour Reduction <strong>Scheme</strong>)<br />
Presented to: Julian Hammer<br />
Contractor: Black & Veatch<br />
Client: Yorkshire Water Services Ltd<br />
Talybont Water Treatment Works<br />
Presented to: Dwr Cymru Welsh Water<br />
Contractor: Black & Veatch/Laing O'Rourke<br />
Partnerships<br />
Client: Dwr Cymru Welsh Water<br />
Construction of the New Library and Clinic and<br />
Refurbishment of the Community Centre<br />
Presented to: John Riordan<br />
Contractor: Borras Construction Ltd<br />
Client: Bedford Borough Council<br />
St Paul’s Way Community School<br />
Presented to: Nicolas Beausseron<br />
Contractor: Bouygues UK Ltd<br />
Client: London Borough of Tower Hamlets<br />
Exchange Place, Edinburgh<br />
Presented to: BLL Project Team<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: Hanover Cube<br />
Gloucester Quays<br />
Presented to: Simon Allen<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: Gloucester Quays LLP<br />
Greenwich N0204<br />
Presented to: Nick Daniel<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: GPRL Ltd<br />
One Southampton Row<br />
Presented to: David Davies<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: Hanover Cube<br />
Ravensbourne College<br />
Presented to: Adrian Richards<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: Meridian Delta Ltd<br />
Regents Place<br />
Presented to: Roger Hirst<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: <strong>The</strong> British Land Company plc<br />
University of Sheffield - Student Village<br />
Presented to: Richard Brooke<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: Catalyst Higher Education (Sheffield) plc<br />
University of St Andrews,<br />
New Bute School of Medicine<br />
Presented to: Rodger Anderson<br />
Contractor: Bovis Lend Lease Ltd<br />
Client: University of St Andrews<br />
Syon Park Hotel<br />
Presented to: Bowen Site team<br />
Contractor: Bowen plc<br />
Client: Ability Hotel (Syon) Ltd<br />
St John's Worcester<br />
Presented to: Paul Foster<br />
Contractor: Bowmer & Kirkland Ltd<br />
Client: Sainsbury's Supermarkets Ltd<br />
Leighnmohr Cresent<br />
Presented to: Sean McWilliams<br />
Contractor: Braidwater Ltd<br />
Client: Braidwater Ltd<br />
5047 - Aldham House Lane<br />
Presented to: Rob Seaman<br />
Contractor: Bramall Construction Ltd<br />
Client: Yorkshire Housing<br />
5077 - Love Lane<br />
Presented to: Bob Carr<br />
Contractor: Bramall Construction Ltd<br />
Client: Synergy Housing Solutions Ltd<br />
Exmouth Street<br />
Presented to: Ian Reynolds<br />
Contractor: Bramall Construction Ltd<br />
Client: Accent Group Ltd<br />
L.M.H Framework<br />
Presented to: Paul McKenzie<br />
Contractor: Bramall Construction Ltd<br />
Client: Liverpool Mutual Homes<br />
Longsight Library<br />
Presented to: Martin Hook and Bob Hanlon<br />
Contractor: Bramall Construction Ltd<br />
Client: Manchester City Council<br />
Year 4 Works Kitchen & Bathroom Replacements<br />
Presented to: Carl Watkin<br />
Contractor: Bramall Construction Ltd<br />
Client: Community Gateway Association<br />
Chingford Green Various<br />
Presented to: Paul Darbinson<br />
Contractor: Breyer Group plc<br />
Client: Ascham Homes Ltd<br />
Strata SE1<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: Brookfield Construction (UK) Ltd<br />
Client: Castle House Developments<br />
Lots Road Power Station Redevelopment<br />
Presented to: Brown & Mason<br />
Project Management Team<br />
Contractor: Brown & Mason Ltd<br />
Client: Hutchinson Whampoa Properties (Europe) Ltd<br />
<strong>The</strong> Cube<br />
Presented to: Aidan Smith and Neil Edginton<br />
Contractor: BuildAbility Ltd<br />
Client: Birmingham Development Co Ltd<br />
DS3 Project<br />
Presented to: Michael Morrissey<br />
Contractor: Canary Wharf Contractors Ltd<br />
Client: Canary Wharf Group<br />
Chambers Wharf<br />
Presented to: Cantillon Ltd<br />
Contractor: Cantillon Ltd<br />
Client: St Martins Property Corporation Ltd
Bronze <strong>Award</strong> <strong>winners</strong><br />
Basildon Lower Academy<br />
Presented to: Russell Lane<br />
Contractor: Carillion Building<br />
Client: Essex County Council<br />
Beaconsfield MSA<br />
Presented to: Leigh Rogers<br />
Contractor: Carillion Building<br />
Client: Swayfields Ltd<br />
Bury Townside Fields Development<br />
Presented to: John England<br />
Contractor: Carillion Building<br />
Client: ASK Property Development Ltd<br />
Gaza Barracks Redevelopment<br />
Presented to: Steve Simmons<br />
Contractor: Carillion Building<br />
Client: Defence Estates<br />
Joseph Rowntree New School Project<br />
Presented to: Joseph Rowntree Site Team<br />
Contractor: Carillion Building<br />
Client: City of York Council<br />
Leeds Swarcliffe P.F.I x2<br />
Presented to: Chris Phillips, John Tweddell and the<br />
Swarcliffe Team<br />
Contractor: Carillion Building<br />
Client: Yorkshire Transformations Ltd<br />
New Line Learning Academy<br />
Presented to: NLLA Project Team<br />
Contractor: Carillion Building<br />
Client: Kent County Council<br />
New Welsh Assembly Government Office,<br />
Aberystwyth<br />
Presented to: Stephen Evans<br />
Contractor: Carillion Building<br />
Client: Welsh Assembly Ministers<br />
Queen Elizabeth High School<br />
Presented to: Mark Wusthoff<br />
Contractor: Carillion Building<br />
Client: Carmarthenshire County Council<br />
Romford Market Redevelopment-Phase3-5<br />
Presented to: Ahmad Moazami<br />
Contractor: Carillion Building<br />
Client: Pickenham (Romford) Ltd<br />
Site Offices Carillion Building, Nailsea School<br />
Presented to: Richard Molloy<br />
Contractor: Carillion Building<br />
Client: North Somerset Council<br />
St Joseph's VA RC Comprehensive School<br />
Presented to: Farid Didi<br />
Contractor: Carillion Building<br />
Client: Inspiredspaces STaG Ltd<br />
Urmston Town Centre Regeneration Project<br />
Presented to: John Currie<br />
Contractor: Carillion Building<br />
Client: ASK Property Development Ltd<br />
Woodley "One Stop Health Centre"<br />
Presented to: Pat Wickham<br />
Contractor: Carillion Building<br />
Client: 1st Health Solutions<br />
Burgh Primary School<br />
Presented to: Owen Cherrie<br />
Contractor: Carillion Building Scotland<br />
Client: South Lanarkshire Council<br />
A6192 Staveley Northern Loop Phase 1<br />
Presented to: Ian Bingham and Simon Alsop<br />
Contractor: Carillion Civil Engineering<br />
Client: Derbyshire County Council<br />
Bedford Western Bypass<br />
Presented to: Carillion Site Team<br />
Contractor: Carillion Civil Engineering<br />
Client: Bedford Borough Council<br />
A40 Western Avenue Bridges Replacement<br />
Presented to: Sean McCallion<br />
Contractor: Carillion Infrastructure<br />
Client: Transport for London - Street Management<br />
M4 Widening - Junction 29 to 32<br />
Presented to: Mike Park<br />
Contractor: Carillion Infrastructure<br />
Client: Welsh Assembly Government<br />
Building D, Paddington<br />
Presented to: Ian Cordery<br />
Contractor: Carillion National Building<br />
Client: European Land and Property Ltd<br />
Indescon Court-Phase 1<br />
Presented to: Barry O'Shea<br />
Contractor: CJ O'Shea & Co Ltd<br />
Client: Millharbour Developments Ltd<br />
Sanctuary Building<br />
Presented to: Phil Lynn and Bill Burns<br />
Contractor: COFELY GDF SUEZ<br />
Client: Department for Children Schools and Families<br />
St Michael & All Angels Primary School<br />
Presented to: Gordon Mackenzie<br />
Contractor: Conlon Construction Ltd<br />
Client: Archdiocese of Liverpool<br />
Costain Farmoor AWTW<br />
Presented to: Costain Farmoor AWTW Project Team<br />
Contractor: Costain Ltd<br />
Client: Thames Water<br />
Felixstowe South Reconfiguration - Phase 1<br />
Presented to: David Alefs<br />
Contractor: Costain Ltd<br />
Client: Port of Felixstowe<br />
Riverside Resource Recovery Facility<br />
Presented to: John Russell<br />
Contractor: Costain Ltd<br />
Client: Riverside Resource Recovery Ltd<br />
South Crescent Project<br />
Presented to: Paul Middleton and Aubrey Davies<br />
Contractor: Costain Ltd<br />
Client: City of London<br />
Spalding Community Hospital<br />
Presented to: Steve Merrin<br />
Contractor: Costain Ltd<br />
Client: Arden Partnership (Lincolnshire) Ltd<br />
20, 22, 34, 36, 38 and 40 Ebury Bridge Road<br />
Presented to: <strong>The</strong> Bastows Project Management Team<br />
Contractor: D Bastow Ltd<br />
Client: Grosvenor Estate Management <strong>Scheme</strong> -<br />
Belgravia<br />
Tan Pit Retaining Wall Replacement<br />
Presented to: Lloyd Williams<br />
Contractor: DCT Civil Engineering Ltd<br />
Client: Stockport MBC<br />
Brixham Regeneration Phase 1<br />
Presented to: Simon Wilkinson<br />
Contractor: Dean & Dyball Civil Engineering<br />
Client: Torbay Development Agency<br />
DSDA Ashchurch - Main Gate Improvements<br />
Presented to: James Darby and Philip Goodfellow<br />
Contractor: Debut Services (South West) Ltd<br />
Client: Defence Estates<br />
Woolwich Barracks (A8201)<br />
Presented to: Derek Wright<br />
Contractor: Debut Services Ltd<br />
Client: Defence Estates<br />
Helles Barracks<br />
Presented to: Drew Goldie<br />
Contractor: Debut Services Ltd Project Slam<br />
Client: Defence Estates<br />
RAF Leeming<br />
Presented to: Andy Murray<br />
Contractor: Debut Services Ltd Project Slam<br />
Client: Defence Estates<br />
Caspian Wharf Block 'B'<br />
Presented to: Neil Mugridge<br />
Contractor: Denne Construction Ltd<br />
Client: Berkeley Homes Capital plc<br />
Highfield<br />
Presented to: Graham Rye<br />
Contractor: Denne Construction Ltd<br />
Client: Janine Stone Ltd<br />
Ham Drive Learning Centre<br />
Presented to: Devon Contractors<br />
Design and Build Team<br />
Contractor: Devon Contractors Ltd<br />
Client: Plymouth City Council<br />
Construction of 10 Nr Flats & Demolition of<br />
Existing Building on Parkfield Hall<br />
Presented to: Dean Purvis<br />
Contractor: Dunelm Property Services Ltd<br />
Client: Endeavour Housing Association<br />
Parkway & Churchside South Shields Task Order 4<br />
Presented to: Shawn Clark<br />
Contractor: Dunelm Property Services Ltd<br />
Client: South Tyneside Homes<br />
Yorkswood House, Solihull<br />
Presented to: Dean Lambert<br />
Contractor: E.G.Carter & Co Ltd<br />
Client: Home Group Ltd<br />
134 Franche Road, Kidderminster, Worcestershire<br />
Presented to: Trevor Stevens<br />
Contractor: E.G.Carter & Company Ltd<br />
Client: Home Group (Stoneham Housing)<br />
University of Liverpool H.I.P<br />
Presented to: EMCOR - H.I.P Project Team<br />
Contractor: EMCOR Engineering Services Ltd<br />
Client: University of Liverpool<br />
EnterpriseMouchel (Area 1) Notter Bridge<br />
Highways Depot<br />
Presented to: Howard Jones<br />
Contractor: EnterpriseMouchel<br />
Client: Highways Agency<br />
Lisburn Institute Site Offices<br />
Presented to: George McClure<br />
Contractor: Farrans (Construction) Ltd<br />
Client: East Down and Lisburn Partnership<br />
‘Decent Homes Works’ (Charnwood<br />
Neighbourhood Housing)<br />
Presented to: Pete Watson<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Charnwood Neighbourhood Housing Ltd<br />
183 No Heatings Cowpen Area 3 Blyth<br />
Presented to: Mark Thompson<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Blyth Valley Housing<br />
<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong> 2010 National Site <strong>Award</strong>s | 11
Bronze <strong>Award</strong> <strong>winners</strong><br />
Abbey Court<br />
Presented to: Barry Wild<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: <strong>The</strong> Gateshead Housing Company<br />
Acquired Properties<br />
Presented to: Colin Tate<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Your Homes Newcastle<br />
Addison Grafton Estate<br />
Presented to: Barry Metters<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Your Homes Newcastle<br />
Blyth Valley Heatings Cowpen 4<br />
Presented to: Mark Thompson<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Blyth Valley Housing<br />
Blyth Valley Mods - 221 Heating's, Cowpen<br />
Presented to: Andrew Cooper<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Blyth Valley Housing<br />
Blyth Valley Mods - 96 Heating's<br />
Presented to: Mark Thompson<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Blyth Valley Housing<br />
Blyth Valley Mods - Bowes Court & Pattinson House<br />
Presented to: Ian McBean<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Blyth Valley Housing<br />
Etal Park<br />
Presented to: Simon Roberts<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Your Homes Newcastle<br />
Fawdon Unities<br />
Presented to: Kevin McCormack<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Your Homes Newcastle<br />
Ferguson Lane<br />
Presented to: Dave Lagus<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Your Homes Newcastle<br />
Grayson Crest<br />
Presented to: Richard Hadfield<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: West North West Homes Leeds<br />
Newbolt & Tennyson<br />
Presented to: Barry Wild<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: <strong>The</strong> Gateshead Housing Company<br />
Newcastle Sheltered Housing<br />
Presented to: Brian Spackman<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Your Homes Newcastle<br />
Ponteland Year 2<br />
Presented to: Ian Towers<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Northumberland County Council<br />
Rookwood Phase 7A<br />
Presented to: Duncan Gray<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Leeds East North East Homes<br />
Shiregreen<br />
Presented to: Chris Bridgewood, Paul Yates, Jonny<br />
Woodhead, Chris Goddard and Simon Fenn<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Sanctuary Housing Association<br />
South Warwickshire<br />
Presented to: Stuart Nicholls<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Heart of England Housing Group<br />
Stanley Area<br />
Presented to: Dave Britton<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Derwentside Homes<br />
Walker North of Grasmere<br />
Presented to: Andy Yule<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Your Homes Newcastle<br />
Wansbeck Homes Externals<br />
Presented to: Arthur Cornell<br />
Contractor: Frank Haslam Milan & Co Ltd<br />
Client: Wansbeck Homes<br />
Lloyd Motors Colne<br />
Presented to: Nigel Bantleman<br />
Contractor: G & J Seddon Ltd<br />
Client: G & J Seddon Ltd<br />
Newbury House<br />
Presented to: Andy Sutherland<br />
Contractor: G & J Seddon Ltd<br />
Client: Riverside Housing Association<br />
Fort Royal Primary School<br />
Presented to: Peter Dunn and Leanne Burden<br />
Contractor: G F Tomlinson Birmingham Ltd<br />
Client: Worcestershire County Council<br />
Kings Norton Nursery<br />
Presented to: Vance Seymour, David Tomlin and<br />
Chris Sheriff<br />
Contractor: G F Tomlinson Birmingham Ltd<br />
Client: Birmingham City Council<br />
Osprey Quay Marina<br />
Presented to: Alan Crabb<br />
Contractor: G & H Group<br />
Client: Dean & Reddyhoff Marinas Ltd<br />
1-17 Kinnerton Street, Belgravia, London,<br />
SW1X 8EA<br />
Presented to: Matt Ayers – Project Manager and<br />
Chris Ashton – Senior Site Manager<br />
Contractor: Galliford Try Construction (South) Ltd<br />
Client: Grosvenor Developments Ltd<br />
Chestnut Lodge<br />
Presented to: Neil Joyce<br />
Contractor: Galliford Try Partnerships Ltd<br />
Client: Ealing Care Alliance<br />
Southview Road, Vange<br />
Presented to: Michael Dennis<br />
Contractor: Galliford Try Partnerships Ltd<br />
Client: Swan Housing Association<br />
Durham Johnston School<br />
Presented to: Neil Metcalf and Steve Cockerill<br />
Contractor: GB Building Solutions Ltd<br />
Client: Durham County Council<br />
New Delaval Primary School<br />
Presented to: Alex Barker<br />
Contractor: GB Building Solutions Ltd<br />
Client: Northumberland County Council<br />
Oasis Academy, Pelham Road, Immingham<br />
Presented to: Andy Costello and Mick Count<br />
Contractor: GB Building Solutions Ltd<br />
Client: <strong>The</strong> Oasis Centre<br />
Staybridge Hotel Newcastle<br />
Presented to: Darren Cook and John McIntyre<br />
Contractor: GB Building Solutions Ltd<br />
Client: Trinity Developments (Newcastle) Ltd<br />
Willerby Carr Lane Primary School<br />
Presented to: James Townend, John Gledhill<br />
and Nick Fryer<br />
Contractor: Geo. Houlton & Sons Ltd<br />
Client: East Riding of Yorkshire Council<br />
933-946 Yeovil Road<br />
Presented to: Roger Pettitt, Chris Creighton and<br />
Matt Forsdick<br />
Contractor: Geoffrey Osborne Ltd<br />
Client: SEGRO plc<br />
Quorum Business Park<br />
Presented to: <strong>The</strong> Quorum Site Management Team<br />
Contractor: Grantside Ltd<br />
Client: Quorum Development Partners LLP<br />
Pumping Station Site<br />
Presented to: Martyn Wicks and David Reynolds<br />
Contractor: Gullett & Sons Ltd<br />
Client: A2Dominion Group<br />
A38 Kennford to Exeter Racecourse Westbound<br />
Presented to: Peter Collinson<br />
Contractor: Hanson Contracting<br />
Client: Highways Agency<br />
Titanic Quarter<br />
Presented to: Sean Francis<br />
Contractor: Harcourt Construction NI Ltd<br />
Client: Titanic Quarter<br />
My Street Phase 2<br />
Presented to: Andrew Prosper<br />
Contractor: Herbert T Forrest Ltd<br />
Client: Salix Homes<br />
Mill Road<br />
Presented to: Keith Fisher<br />
Contractor: Higgins Construction plc<br />
Client: Swan Housing Group<br />
<strong>The</strong> Quadrant<br />
Presented to: <strong>The</strong> Quadrant Site Team<br />
Contractor: Higgins Construction plc<br />
Client: Presentation Housing Association<br />
42C 45N & 0 Eaton Square<br />
Presented to: Spencer Edwards<br />
Contractor: Holloway White Allom Ltd<br />
Client: Grosvenor Investments Ltd<br />
HWA, 51 Eaton Square<br />
Presented to: Paul Flanagan<br />
Contractor: Holloway White Allom Ltd<br />
Client: Grosvenor Estate Management <strong>Scheme</strong> -<br />
Belgravia<br />
Longriggend Waste Water Treatment Works<br />
Presented to: Graham Fielden<br />
Contractor: Horizons Hydro Engineering<br />
Client: Scottish Prison Services<br />
College of Arms<br />
Presented to: John Kennedy and Jody Kennedy<br />
Contractor: Houseline Building Services Ltd<br />
Client: College of Arms<br />
Allerton Grange New High School<br />
Presented to: Simon Walton<br />
Contractor: Interserve Project Services Ltd<br />
Client: Leeds City Council
Bronze <strong>Award</strong> <strong>winners</strong><br />
HMP/YOI Isis<br />
Presented to: Tim Shepherd<br />
Contractor: Interserve Project Services Ltd<br />
Client: Ministry of Justice Custodial Property (MoJCP)<br />
M3 Mapledurwell Junction 5 to 6 Major<br />
Maintenance<br />
Presented to: Steve Bendall and Darryl Allen<br />
Contractor: Interserve Project Services Ltd<br />
Client: Highways Agency<br />
EDS<br />
Presented to: Paul Pompili<br />
Contractor: ISG InteriorExterior<br />
Client: EDS<br />
Shell Centre Renewal<br />
Presented to: Andrew Sheppard<br />
Contractor: ISG InteriorExterior<br />
Client: Shell<br />
Best Buy Hedge End<br />
Presented to: James Long<br />
Contractor: ISG Pearce<br />
Client: Best Buy Europe<br />
Rotary Court<br />
Presented to: Jason Hancock<br />
Contractor: ISG Pearce<br />
Client: Saxon Weald Homes<br />
Sainsbury's Bude<br />
Presented to: Garin Cope<br />
Contractor: ISG Pearce<br />
Client: Sainsbury's Supermarkets Ltd<br />
Tesco Winchester<br />
Presented to: Phil Waters<br />
Contractor: ISG Pearce<br />
Client: Tesco Stores Ltd<br />
All Saints’ C of E School<br />
Presented to: Roy Ward<br />
Contractor: ISG Regions<br />
Client: City of Bradford Metropolitan District Council<br />
Sir John Deane's College<br />
Presented to: Fraser Tanner<br />
Contractor: ISG Regions<br />
Client: Sir John Deane's College<br />
A47 Kings Lynn Baco’s<br />
Presented to: Chris Souter<br />
Contractor: Jackson Frameworks Ltd<br />
Client: Atkins Ltd<br />
Thirlmere Compensation Flow<br />
Presented to: Robert Hill<br />
Contractor: JN Bentley Ltd<br />
Client: United Utilities<br />
Grosvenor House Apartments<br />
Presented to: Lee Hutchinson<br />
Contractor: John Sisk & Son Ltd<br />
Client: Spark<br />
Wembley WO4<br />
Presented to: Eike Schwartlander<br />
Contractor: John Sisk & Son Ltd<br />
Client: Quintain Investments (04) Ltd<br />
ISS Building<br />
Presented to: Graham Woodridge<br />
Contractor: John Turner & Sons (Preston) Ltd<br />
Client: Lancaster University<br />
Elements - Herringthorpe Rotherham<br />
Presented to: Steve Whitehead<br />
Contractor: Keepmoat Homes Ltd<br />
Client: NHBC<br />
<strong>The</strong> Pinnacle Milton Keynes - New Building<br />
Development<br />
Presented to: M. R. George<br />
Contractor: Kier<br />
Client: Hampton Brook Ltd<br />
Knights Enham Infant & Junior Schools<br />
Presented to: Andy Hammerton<br />
Contractor: Kier Brazier<br />
Client: Hampshire County Council<br />
Mid Kent College, Lower Lines<br />
Presented to: MKC Project Team<br />
Contractor: Kier Build<br />
Client: Mid Kent College<br />
Richard Rose Central Academy<br />
Presented to: Richard Rose Central Academy Team<br />
Contractor: Kier Construction<br />
Client: Cumbria County Council<br />
Canons High School<br />
Presented to: Anthony Cooney<br />
Contractor: Kier Harrow Projects<br />
Client: Harrow Council<br />
<strong>The</strong> Samworth Church Academy<br />
Presented to: John Hodson<br />
Contractor: Kier Marriott<br />
Client: Nottinghamshire County Council<br />
Walter Sickert Hall<br />
Presented to: Jon Carter<br />
Contractor: Kier Marriott<br />
Client: Liberty Living plc<br />
Cauldon Campus - Caring Centre of Excellence<br />
Presented to: John Leo<br />
Contractor: Kier Moss<br />
Client: Stoke on Trent College<br />
Sainsbury's Gloucester Quays<br />
Presented to: David Edkins<br />
Contractor: Kier Moss<br />
Client: Sainsbury's Supermarkets Ltd<br />
PICU, Carleton Clinic<br />
Presented to: Ray Swindon<br />
Contractor: Kier North East<br />
Client: <strong>The</strong> Cumbria Partnership NHS Trust<br />
Morrison's Supermarket, Horsforth<br />
Presented to: Phil Shepherd<br />
Contractor: Kier North West<br />
Client: WM Morrison Supermarkets plc<br />
Tesco - Liverpool One<br />
Presented to: Rick Smeaton<br />
Contractor: Kier North West<br />
Client: Tesco Stores Ltd<br />
Stream 11 Decent Homes - Jaunty Site Compound<br />
Presented to: Ivan Middleton, Paul Harpham<br />
and Jo Balm<br />
Contractor: Kier Sheffield LLP<br />
Client: Sheffield Homes<br />
Butlins Spa Hotel<br />
Presented to: James Ashley<br />
Contractor: Kier Southern<br />
Client: Bourne Leisure<br />
Fosse Way Special School<br />
Presented to: Mark Mitchell<br />
Contractor: Kier Western<br />
Client: Bath & North East Somerset Council<br />
Keynsham Primary Care Centre<br />
Presented to: Trevor Anderson<br />
Contractor: Kier Western<br />
Client: Bath & North East Somerset Primary Care<br />
Yate Community Health Centre<br />
Presented to: Gary Latham<br />
Contractor: Kier Western<br />
Client: South Gloucestershire Primary Care Trust<br />
St John's College Oxford - Kendrew Quadrangle<br />
Presented to: Darran Gammon<br />
Contractor: Kingerlee Ltd<br />
Client: <strong>The</strong> President and Scholars of Saint John<br />
Baptist College in the University of Oxford<br />
Project Spear<br />
Presented to: Geoff Eardley<br />
Contractor: Laing O'Rourke /<br />
Crown House Technologies<br />
Client: Barclays<br />
Stockport Modular Twin <strong>The</strong>atres and Wards<br />
Presented to: Laing O’Rourke Team<br />
Contractor: Laing O'Rourke Construction Ltd<br />
Client: Stockport NHS Foundation Trust<br />
Manchester Central Project<br />
Presented to: Manchester Central Project Team<br />
Contractor: Laing O'Rourke Construction North Ltd<br />
Client: Manchester Central<br />
Manchester Health Academy<br />
Presented to: Shaun Boylan<br />
Contractor: Laing O'Rourke Construction North Ltd<br />
Client: Manchester City Council<br />
Women's and Newborn Unit<br />
Presented to: David Mills<br />
Contractor: Laing O'Rourke Construction North Ltd<br />
Client: East Lancashire Hospitals NHS Trust<br />
Cannon Place Project<br />
Presented to: David Hiddleston<br />
Contractor: Laing O'Rourke Construction South Ltd<br />
Client: Hines UK<br />
Hardwicks Way<br />
Presented to: Chris Warren and Robert Knott<br />
Contractor: Laing O'Rourke Construction South Ltd<br />
Client: Hardwicks (Wandsworth)<br />
Pembury Hospital Redevelopment<br />
Presented to: Jonathan Abbott<br />
Contractor: Laing O'Rourke Construction South Ltd<br />
Client: Kent & East Sussex Weald Hospital Ltd<br />
Forrester & St Augustine's High Schools<br />
Presented to: Andy Somerville<br />
Contractor: Laing O'Rourke Scotland Ltd<br />
Client: Axiom Education<br />
Harold Hill Fire Station<br />
Presented to: John Loftus<br />
Contractor: Lakehouse<br />
Client: London Fire & Emergency Planning Authority<br />
Thorn Grove Primary School<br />
Presented to: Darren McKeon<br />
Contractor: Lakehouse<br />
Client: Hertfordshire County Council<br />
Lyme Regis House<br />
Presented to: Steve Burton<br />
Contractor: Leadbitter<br />
Client: Signpost Housing Association Ltd<br />
<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong> 2010 National Site <strong>Award</strong>s | 13
Bronze <strong>Award</strong> <strong>winners</strong><br />
Swindon Academy<br />
Presented to: Brian Rawlings<br />
Contractor: Leadbitter Group<br />
Client: United Learning Trust<br />
Sainsbury's Store Chiswick<br />
Presented to: Leigh Russell<br />
Contractor: Longcross Construction<br />
Client: Sainsbury's Supermarkets Ltd<br />
Sainsbury’s, Bury St Edmunds<br />
Presented to: Stuart Donovan<br />
Contractor: Longcross Construction<br />
Client: Sainsbury's Supermarkets Ltd<br />
Tesco Loughborough - <strong>The</strong> Rushes<br />
Presented to: Andrew Kitchen<br />
Contractor: Longcross Construction<br />
Client: Tesco Stores Ltd<br />
1-24 Daniel House<br />
Presented to: Bill Matharu<br />
Contractor: Lovell Partnerships Ltd<br />
Client: Hackney Homes<br />
1-35 Oberon House<br />
Presented to: Bill Matharu<br />
Contractor: Lovell Partnerships Ltd<br />
Client: Hackney Homes<br />
45-180 Crondall Court<br />
Presented to: Bill Matharu<br />
Contractor: Lovell Partnerships Ltd<br />
Client: Hackney Homes<br />
Beswick Phase 2<br />
Presented to: John Mather<br />
Contractor: Lovell Partnerships Ltd<br />
Client: Lovell Partnerships Ltd<br />
Cheltenham ALMO<br />
Presented to: Dennis Powell and Tim Harrison<br />
Contractor: Lovell Partnerships Ltd<br />
Client: Cheltenham Borough Homes<br />
Churchfields<br />
Presented to: Allan Cramsie and Geoff Riley<br />
Contractor: Lovell Partnerships Ltd<br />
Client: South Liverpool Housing<br />
Fagley Internal Refurbishment<br />
Presented to: Roy Brown<br />
Contractor: Lovell Partnerships Ltd<br />
Client: In Communities<br />
Gilead Street<br />
Presented to: Nigel Cooper<br />
Contractor: Lovell Partnerships Ltd<br />
Client: Riverside Housing Association<br />
North Warwickshire/Piccadilly<br />
Presented to: Mark West and Brian Berry<br />
Contractor: Lovell Partnerships Ltd<br />
Client: North Warwickshire Borough Council<br />
Raffles Estate, Phase 3, Site D (Park View)<br />
Presented to: Angela Metcalfe<br />
Contractor: Lovell Partnerships Ltd<br />
Client: Lovell Partnerships Ltd<br />
Ringland Regeneration Phase 2<br />
Presented to: Paul Phillips<br />
Contractor: Lovell Partnerships Ltd<br />
Client: Fairlake Properties<br />
St Mellons 2B<br />
Presented to: Gemma Davies<br />
Contractor: Lovell Partnerships Ltd<br />
Client: City and County of Cardiff<br />
Rutherford Appleton Laboratories -<br />
New Research Complex<br />
Presented to: Darren Phillips<br />
Contractor: M + W Group<br />
Client: Rutherford Appleton Laboratories<br />
7 More London Riverside<br />
Presented to: Mace Plot 7 Team<br />
Contractor: Mace Ltd<br />
Client: LBD 2 Ltd<br />
Mill Rise Extra Care Village<br />
Presented to: Mike Whittington<br />
Contractor: Mansell Construction Services Ltd<br />
Client: Prima 200 Fundco No 1 Ltd<br />
Sandwell Pathfinder<br />
Harvills Hawthorn Improvement<br />
Presented to: Wayne Gwilt<br />
Contractor: Mansell Construction Services Ltd<br />
Client: Riverside Housing Association<br />
Sandwell Pathfinder Improved Standard Works<br />
Presented to: Martin Sollars<br />
Contractor: Mansell Construction Services Ltd<br />
Client: Riverside Housing Association<br />
Sandwell Pathfinder Millfields Regeneration<br />
Presented to: Lewis Jones<br />
Contractor: Mansell Construction Services Ltd<br />
Client: Riverside Housing Association<br />
<strong>The</strong> Dartford Bridge Learning<br />
& Community Campus<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: Mansell Construction Services Ltd<br />
Client: Kent County Council<br />
Three Corners Youth Building<br />
Presented to: Bob Belzko, Matthew Osborn, Romeo<br />
Kengne and Paul Hardy<br />
Contractor: Mansell Construction Services Ltd<br />
Client: London Borough of Islington<br />
Big Yellow Self Storage, Reading<br />
Presented to: James Currie<br />
Contractor: MCS Build Ltd<br />
Client: <strong>The</strong> Big Yellow Group plc<br />
Northampton Public Realm - Phase 1B<br />
Presented to: MGWSP/Aggregate Industries<br />
Construction Team<br />
Contractor: MGWSP<br />
Client: Northamptonshire County Council<br />
Front of House Project Torbay Hospital (c/o<br />
Medicinq Ltd )<br />
Presented to: Steve Pollard<br />
Contractor: Midas Construction Ltd<br />
Client: South Devon Healthcare<br />
Penwith College<br />
Presented to: Kevin Bate<br />
Contractor: Midas Construction Ltd<br />
Client: Truro College<br />
East Durham College<br />
Presented to: Jeff Hedley<br />
Contractor: Miller Construction (UK) Ltd<br />
Client: East Durham College<br />
New Motherwell College<br />
Presented to: John Downey<br />
Contractor: Miller Construction (UK) Ltd<br />
Client: Motherwell College<br />
Whitburn C of E School<br />
Presented to: Dave Robinson<br />
Contractor: Miller Construction (UK) Ltd<br />
Client: Durham Diocesan Board of Education<br />
Bideford College BSF<br />
Presented to: Dave Pearce and Martin Kennedy<br />
Contractor: Morgan Ashurst plc<br />
Client: Devon County Council<br />
Larkhall Academy<br />
Presented to: Iain Reid<br />
Contractor: Morgan Ashurst plc<br />
Client: InspirED<br />
New Biomass Wing<br />
Presented to: Ken Bassett<br />
Contractor: Morgan Ashurst plc<br />
Client: University of East Anglia<br />
St Ninians High School<br />
Presented to: David Gray<br />
Contractor: Morgan Ashurst plc<br />
Client: East Dunbartonshire Council<br />
Trinity High School<br />
Presented to: Ally Wells<br />
Contractor: Morgan Ashurst plc<br />
Client: South Lanarkshire Council<br />
Wexham School<br />
Presented to: Kris Wadley<br />
Contractor: Morgan Ashurst plc<br />
Client: Slough Borough Council<br />
Wigan Life Centre<br />
Presented to: Brian Barritt<br />
Contractor: Morgan Ashurst plc<br />
Client: Hochtief Developments<br />
Assynt Water Treatment Works<br />
Presented to: Morrison Enpure Joint Venture<br />
Contractor: Morrison Enpure Joint Venture<br />
Client: Scottish Water Solutions<br />
Kibblesworth<br />
Presented to: Dave Watson<br />
Contractor: Morrison Facilities Services<br />
Client: <strong>The</strong> Gateshead Housing Company<br />
Manchester Metrolink Phase 3A - South<br />
Manchester Line & Depot<br />
Presented to: Keith Prince and the South<br />
Manchester Line & Depot Team<br />
Contractor: MPact-Thales Joint Venture (MPT)<br />
Client: Greater Manchester Passenger Transport<br />
Executive<br />
Alpha House, Gorefield House<br />
and Canterbury House<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: Mulalley & Co Ltd<br />
Client: Brent Housing Partnership<br />
Newham Homes Internal Modifications<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: Mulalley & Co Ltd<br />
Client: Newham Homes<br />
Newham Homes Low Rise Enveloping<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: Mulalley & Co Ltd<br />
Client: Newham Homes<br />
Newham Homes Relip Works<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: Mulalley & Co Ltd<br />
Client: Newham Homes<br />
Newham Homes Tall Blocks Enveloping<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: Mulalley & Co Ltd<br />
Client: Newham Homes
Bronze <strong>Award</strong> <strong>winners</strong><br />
Great Yarmouth Outer Harbour<br />
Presented to: Bob Perry<br />
Contractor: Nuttall John Martin<br />
Client: Great Yarmouth Port Company Ltd<br />
University of Derby Fenestration Project<br />
Presented to: <strong>The</strong> OPL Team<br />
Contractor: Office Projects Ltd<br />
Client: University of Derby<br />
Buildings 2&3 Bankside - RBS<br />
Presented to: Jed Gardner and Ian Morrow<br />
Contractor: Overbury plc<br />
Client: <strong>The</strong> Royal Bank of Scotland<br />
Warburg Pincus<br />
Presented to: Richard McPherson<br />
Contractor: Overbury plc<br />
Client: Warburg Pincus<br />
Orangefield Primary School<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: Patton Construction<br />
Client: Belfast Education & Library Board<br />
Tesco Bellshill<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: Patton Construction<br />
Client: Tesco Ltd<br />
Mary Datchelor<br />
Presented to: Brian Oatley<br />
Contractor: Peak Design & Construct Ltd<br />
Client: St George South London Ltd<br />
Pevensey Bay Sea Defences<br />
Presented to: Ian Thomas<br />
Contractor: Pevensey Coastal Defence Ltd<br />
Client: Environment Agency<br />
May<br />
Presented to: Dave Gill<br />
Contractor: PMC Construction &<br />
Development Services Ltd<br />
Client: Pavilion Housing Association<br />
Office Extension Goff Petroleum, Stanfield Road<br />
Presented to: David Whitehead<br />
Contractor: R G Carter Ltd<br />
Client: George J Goff Ltd<br />
123 Talbot Road, Blackpool<br />
Presented to: Tim Wright and Steve O'Connell<br />
Contractor: R P Tyson Construction Ltd<br />
Client: Great Places<br />
Waitrose Ltd - Wellington<br />
Presented to: Ian Gallaway<br />
Contractor: RG Group<br />
Client: Waitrose Ltd<br />
Hough Fold Way - Bolton<br />
Presented to: Keith Watterson<br />
Contractor: Rok<br />
Client: PFP Developments Ltd<br />
Mersea Island School<br />
Presented to: Dave Bloomfield<br />
Contractor: Rose Builders Ltd<br />
Client: Governors of Mersea Island School<br />
Sainsbury's Chester<br />
Presented to: Andy Williams<br />
Contractor: S Dudley and Sons Ltd<br />
Client: Sainsbury’s Chester<br />
Sainsbury's Pontllanfraith<br />
Presented to: Paul Jones<br />
Contractor: S Dudley and Sons Ltd<br />
Client: Sainsbury's Supermarkets Ltd<br />
Sainsbury’s Fosse Park<br />
Presented to: Mike Emery<br />
Contractor: S Dudley and Sons Ltd<br />
Client: Sainsbury's Supermarkets Ltd<br />
Christ Church Blue Boar Quad<br />
Presented to: Tony Sullivan<br />
Contractor: SDC Builders Ltd<br />
Client: Christ Church Oxford<br />
Bilton Grange Medical Centre<br />
Presented to: Cavan Gray-Nicholson and<br />
David Barley<br />
Contractor: Sewell Construction Ltd<br />
Client: Hull Citycare<br />
Burnley College and UCLAN Centre<br />
Re-Location Project<br />
Presented to: Mark Richardson<br />
Contractor: Shepherd Construction Ltd<br />
Client: Burnley College<br />
Richmond School<br />
Presented to: Peter Bell<br />
Contractor: Shepherd Construction Ltd<br />
Client: North Yorkshire County Council<br />
Walsall College - New Business and<br />
Learning Campus<br />
Presented to: Stuart Fanshaw<br />
Contractor: Shepherd Construction Ltd<br />
Client: Walsall College<br />
Project Inspire<br />
Presented to: Peter Munn<br />
Contractor: Sir Robert McAlpine Ltd<br />
Client: Serco Defence & Aerospace<br />
Holbrook House<br />
Presented to: Brian Nunn<br />
Contractor: Skanska Construction UK Ltd<br />
Client: Henderson Global Investors<br />
Weymouth Relief Road<br />
Presented to: Willie McCormick<br />
Contractor: Skanska Construction UK Ltd<br />
Client: Dorset County Council<br />
103 Tindal Street<br />
Presented to: Bill Cave, Matthew Bailey, Mick Ridley<br />
and Del Browne<br />
Contractor: Speller Metcalfe Malvern Ltd<br />
Client: John Christophers<br />
Energy from Waste Facility, La Collette<br />
Presented to: Andy Simm<br />
Contractor: Spie Batignolles, Camerons Ltd<br />
Client: Transport & Technical Services<br />
Beaufort Park<br />
Presented to: Paul Jeal<br />
Contractor: St George Central London Ltd<br />
Client: St George Central London Ltd<br />
<strong>The</strong> Minster College<br />
Presented to: Alan Lyons<br />
Contractor: Stepnell Ltd<br />
Client: Herefordshire Council<br />
YHA Coalport<br />
Presented to: Talbot Construction<br />
(Northern Region)<br />
Contractor: Talbot Design (Seale) Ltd<br />
Client: YHA (England & Wales) Ltd<br />
Campbell Park<br />
Presented to: Tony Butcher<br />
Contractor: Taylor Wimpey North Thames<br />
Client: Taylor Wimpey North Thames<br />
Arc, Bury St Edmunds<br />
Presented to: Simon Buck<br />
Contractor: Taylor Woodrow Construction<br />
Client: Centros UK Ltd<br />
Docklands Light Railway 3 Car Capacity<br />
Enhancement Project x2<br />
Presented to: Mark Howard<br />
Contractor: Taylor Woodrow Construction<br />
Client: Docklands Light Railway<br />
Terminal 4 CIP Lounge and A380 Stands and<br />
Gate Provision Project<br />
Presented to: Mike Elks<br />
Contractor: Taylor Woodrow Construction<br />
Client: BAA<br />
P6: Gravelly Hill - Preventative Maintenance<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: <strong>The</strong> Construction Management Framework<br />
Client: Highways Agency<br />
Hereford Custody Project<br />
Presented to: Paul Bennett<br />
Contractor: Thomas Vale Construction plc<br />
Client: Estate Services<br />
St Anne's Primary School<br />
Presented to: Dave Cull<br />
Contractor: Thomas Vale Construction plc<br />
Client: Worcestershire County Council<br />
Arundel Square<br />
Presented to: Chris Homewood<br />
Contractor: United House Ltd<br />
Client: Arundel Square Developments Ltd<br />
Stanley Morgan<br />
Presented to: David Martin<br />
Contractor: United House Ltd<br />
Client: Housing 21<br />
Tovil Green<br />
Presented to: Kevin J Ladley<br />
Contractor: United House Ltd<br />
Client: Kent Community Partnership Ltd<br />
Royal Inch Crescent Garden Remediation<br />
Presented to: Phil Dews<br />
Contractor: VHE Construction plc<br />
Client: Renfrewshire Council<br />
Yewlands School Technology College<br />
Presented to: Craig Pease<br />
Contractor: Vinci Construction<br />
Client: Sheffield City Council<br />
Office Development 2 West Regent Street<br />
Presented to: Michael Henderson<br />
Contractor: Vinci Construction Ltd<br />
Client: City Site Estates plc<br />
Grain LNG Tank 4<br />
Presented to: Stephen Pate<br />
Contractor: Vinci Construction UK<br />
Client: Chicago Bridge & Iron<br />
Aquinas College<br />
Presented to: John Offlands<br />
Contractor: Vinci Construction UK Ltd<br />
Client: Aquinas College<br />
Luton Sixth Form College<br />
Presented to: Mr Steve Diggines<br />
Contractor: Vinci Construction UK Ltd<br />
Client: Luton Sixth Form College<br />
<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong> 2010 National Site <strong>Award</strong>s | 15
Bronze <strong>Award</strong> <strong>winners</strong><br />
Project MoDEL<br />
Presented to: Philip Willmott<br />
Contractor: Vinci Construction UK Ltd<br />
Client: VSM Estates Ltd<br />
Ysgol Glan Usk School<br />
Presented to: Kieran Mulrooney<br />
Contractor: Vinci Construction UK Ltd<br />
Client: Newport Schools Solutions<br />
Sandwell Homes<br />
Presented to: Brian Price<br />
Contractor: Vinci Facilities<br />
Client: Sandwell Homes<br />
Windsor House, Slough<br />
Presented to: VolkerFitzpatrick Windsor House<br />
Slough Site Team<br />
Contractor: VolkerFitzpatrick Ltd<br />
Client: Lasalle UK Ventures Property 2 Sarl<br />
London Borough of Enfield Term Maintenance<br />
Contract 2006 - 2011<br />
Presented to: Steve Woolf<br />
Contractor: VolkerHighways<br />
Client: London Borough of Enfield<br />
Prescott Channel Lock and<br />
Water Control Structures<br />
Presented to: Roger Martin<br />
Contractor: VolkerStevin Ltd<br />
Client: British Waterways<br />
39-45 Cadogan Gardens<br />
Presented to: Peter Hicks<br />
Contractor: Walter Lilly & Co Ltd<br />
Client: Cadogan Estate Ltd<br />
VLA Weybridge<br />
Presented to: Russell Tinniswood<br />
Contractor: Walter Lilly & Co Ltd<br />
Client: DEFRA, VLA Weybridge<br />
Hummersknott School and Language College<br />
Presented to: Jason Henderson<br />
Contractor: Walter Thompson (Contractors) Ltd<br />
Client: Darlington Borough Council<br />
Linthorpe School, Kitchen & Classroom<br />
Extension<br />
Presented to: Ian Walker<br />
Contractor: Walter Thompson (Contractors) Ltd<br />
Client: Middlesbrough Council<br />
Aerospace & Automotive Academy<br />
Presented to: Nigel Wood<br />
Contractor: Warings Contractors Ltd<br />
Client: Farnborough College of Technology<br />
Berkshire College of Agriculture<br />
Presented to: Simon F Greaves, Jim Faulkner,<br />
Michael Wilson, Jetinder Maal and Tatiana Vodovoz<br />
Contractor: Warings Contractors Ltd<br />
Client: Berkshire College of Agriculture<br />
<strong>Considerate</strong> <strong>Constructors</strong> <strong>Scheme</strong><br />
Site Registration<br />
PO Box 75<br />
Ware<br />
Hertfordshire SG12 0YX<br />
Telephone 01920 485959<br />
Fax 01920 485958<br />
Freephone 0800 7831423<br />
www.ccscheme.org.uk<br />
siteenquiries@ccscheme.org.uk<br />
Printed on 9Lives recycled stock | Published 05/10 | Please recycle<br />
22-26 <strong>The</strong> Headrow<br />
Presented to: Adam Knowles and Steve Hart<br />
Contractor: Wates Construction Ltd<br />
Client: Capital & Counties<br />
HML Skipton Building Society<br />
Presented to: Stephen Hart<br />
Contractor: Wates Construction Ltd<br />
Client: Skipton Building Society<br />
HMP Brixton – New Kitchen<br />
Presented to: Gareth Neal<br />
Contractor: Wates Construction Ltd<br />
Client: Secretary of State for the Home Office<br />
National Audit Office<br />
Presented to: Vince Finnegan<br />
Contractor: Wates Construction Ltd<br />
Client: National Audit Office<br />
North Liverpool Academy<br />
Presented to: John Parry<br />
Contractor: Wates Construction Ltd<br />
Client: North Liverpool Academy Trust<br />
John Street<br />
Presented to: Paul Smith<br />
Contractor: Wates Living Space<br />
Client: East Thames Housing Association<br />
St Cuthberts Place<br />
Presented to: Frederick Lees<br />
Contractor: Wates Living Space (Midlands) Ltd<br />
Client: Zenith Development Partnership<br />
Wates Retail c/o Marks & Spencer<br />
Presented to: Paul Hey<br />
Contractor: Wates Retail<br />
Client: Marks & Spencer plc<br />
Unit C1 Maylands Wood Estate<br />
Presented to: James Sprack<br />
Contractor: Welbro Project Management Ltd<br />
Client: Brixton plc<br />
Harlow Carr Gardens<br />
Presented to: Carl Barrow<br />
Contractor: William Birch & Sons Ltd<br />
Client: Royal Horticulture Society<br />
Grange Park<br />
Presented to: Russell Pitman<br />
Contractor: William Davis Ltd<br />
Client: William Davis<br />
Morledge<br />
Presented to: Martin Bottomley<br />
Contractor: William Davis Ltd<br />
Client: William Davis<br />
Corby East Midlands International Pool<br />
Presented to: Martin Adie, Ian Williamson, Ben<br />
Ward, Mark Richards, Mark Panter, Neil Noakes<br />
and Thomas Prince<br />
Contractor: Willmott Dixon Construction Ltd<br />
Client: Corby Borough Council<br />
Crocketts Community Primary School<br />
Presented to: <strong>The</strong> Project Team<br />
Contractor: Willmott Dixon Construction Ltd<br />
Client: Sandwell Metropolitan Borough Council<br />
Manor Park Sports Complex<br />
Presented to: Dan Fisher<br />
Contractor: Willmott Dixon Construction Ltd<br />
Client: University of Surrey<br />
Rogiet Primary School<br />
Presented to: Andy Miles<br />
Contractor: Willmott Dixon Construction Ltd<br />
Client: Monmouthshire County Council<br />
University of Hertfordshire - Hatfield Campus<br />
Presented to: Nick Jude<br />
Contractor: Willmott Dixon Construction Ltd<br />
Client: University of Hertfordshire<br />
Ward Refurbishment - Prince Charles Hospital<br />
Presented to: Paul Lane<br />
Contractor: Willmott Dixon Construction Ltd<br />
Client: Cwym Taff Local Health Board<br />
Waterside <strong>The</strong>atre<br />
Presented to: Lee Bircumshaw<br />
Contractor: Willmott Dixon Construction Ltd<br />
Client: Aylesbury Vale District Council<br />
HMP Swaleside H Wing<br />
Presented to: Geoff Kempt<br />
Contractor: Willmott Dixon Construction Ltd<br />
(Dartford)<br />
Client: Ministry of Justice Custodial Property<br />
(MoJCP)<br />
Loxford School of Science and Technology<br />
Presented to: Chris Evans<br />
Contractor: Willmott Dixon Construction Ltd<br />
(Dartford)<br />
Client: Loxford School of Science and Technology<br />
Orpington College<br />
Presented to: Duncan Purvis<br />
Contractor: Willmott Dixon Construction Ltd<br />
(Dartford)<br />
Client: Orpington College<br />
Wolverton Park<br />
Presented to: Carl Mulkern and Tony Brook<br />
Contractor: Willmott Dixon Housing<br />
Client: Places for People Homes<br />
For full details of all the <strong>winners</strong>,<br />
visit www.ccscheme.org.uk or<br />
www.ccscheme.org.uk/industry-image<br />
FS 543981