23.01.2015 Views

Dingee Reservoir Final Seismic Report - East Bay Municipal Utility ...

Dingee Reservoir Final Seismic Report - East Bay Municipal Utility ...

Dingee Reservoir Final Seismic Report - East Bay Municipal Utility ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TABLE B-2<br />

SUMMARY OF ATTERBERG LIMIT TEST RESULTS<br />

Lab No Boring LED<br />

Surface<br />

Elevation (FT)<br />

Sample No Elevation (FT) Depth(FT) MC %<br />

Total Density<br />

(PCF)<br />

Dry<br />

Density<br />

(PCF)<br />

Void Ratio Saturation<br />

(%)<br />

Specific<br />

Gravity<br />

Passing #200<br />

Sieve (%)<br />

2007 XV-11 @ 772.7 MC-1-I 769.7 3.0 17.1 123.3 105.3 0.600 77.0 2.7 62.5 40 19 21<br />

2007 XV-11 @ 772.7 MC-2-I 767.2 5.5 15.0 - - - - 2.7 45.3 - - -<br />

2007 XV-11 @ 772.7 MC-4-II 762.2 10.5 20.8 125.1 103.6 0.626 89.7 2.7 63.0 - - -<br />

2007 XV-11 @ 772.7 MC-4-I 761.7 11.0 22.3 124.3 101.6 0.658 91.5 2.7 65.8 47 22 25<br />

2007 XV-12 @ 772.2 MC-1-1 768.9 3.3 15.2 136.3 118.3 0.424 96.8 2.7 48.1 - - -<br />

2007 XV-12 @ 772.2 MC-2-I 766.7 5.5 16.4 134.2 115.3 0.461 96.0 2.7 45.4 34 18 16<br />

2007 XV-12 @ 772.2 MC-4-I 761.7 10.5 15.1 135.0 117.3 0.436 93.4 2.7 66.5 48 21 27<br />

2007 XV-12 @ 772.2 PT-6 759.2 13.0 21.1 129.6 107.0 0.575 99.2 2.7 63.2 36 19 17<br />

2007 XV-12 @ 772.2 PT-6 758.7 13.5 17.2 134.9 115.1 0.464 100.1 2.7 47.7 - - -<br />

2007 XV-12 @ 772.2 PT-6 758.2 14.0 19.6 130.8 109.4 0.540 98.0 2.7 65.3 - - -<br />

2007 XV-12 @ 772.2 PT-7 756.7 15.5 21.1 130.9 108.1 0.559 102.0 2.7 65.3 37 19 18<br />

2007 XV-12 @ 772.2 PT-9 749.2 23.0 19.0 132.3 111.2 0.515 99.6 2.7 70.5 - - -<br />

2007 XV-13 @ 773.2 MC-1-I 767.2 6.0 19.8 123.5 103.1 0.634 84.3 2.7 64.0 - - -<br />

2007 XV-13 @ 773.2 MC-3-I 759.7 13.5 23.0 154.6 125.7 0.340 182.5 2.7 61.8 29 17 12<br />

2007 XV-13 @ 773.2 MC-5-I 755.2 18.0 20.3 129.7 107.8 0.563 97.4 2.7 67.6 40 20 20<br />

2007 XV-13 @ 773.2 MC-8-I 747.2 26.0 24.7 121.8 97.7 0.724 92.1 2.7 72.4 - - -<br />

2007 XV-13 @ 773.2 MC-9-III 745.7 27.5 21.3 123.5 101.8 0.655 87.8 2.7 64.4 31 20 11<br />

2007 XV-14 @ 754.2 SH-4 741.7 12.5 19.6 131.3 109.8 0.534 99.0 2.7 60.4 - - -<br />

2007 XV-14 @ 754.2 SH-6 733.8 20.4 22.1 129.2 105.8 0.592 100.7 2.7 78.8 45 21 24<br />

2007 XV-14 @ 754.2 SH-6 733.2 21 23.5 127.1 102.9 0.637 99.6 2.7 81.3 - - -<br />

2007 XV-14 @ 754.2 SH-7 730.7 23.5 18.3 133.0 112.4 0.499 99.0 2.7 62.5 - - -<br />

2007 XV-15 @ 754.5 MC-1-III 749.5 5.0 21.5 121.6 100.1 0.683 85.0 2.7 59.5 29 18 11<br />

2007 XV-15 @ 754.5 MC-1-I 748.5 6.0 17.2 133.3 113.7 0.482 96.4 2.7 57.5 27 17 10<br />

2007 XV-15 @ 754.5 MC-2-I 744.5 10.0 24 125.7 101.4 0.662 98.0 2.7 80.3 53 22 31<br />

2007 XV-15 @ 754.5 MC-3-I 741.5 13.0 15.2 137.4 119.3 0.412 99.6 2.7 67.1 - - -<br />

Liquid<br />

Limit<br />

(%)<br />

Plastic<br />

Limit (%)<br />

Plasticity<br />

Index<br />

W:\WORKGRP\DATA\Yprashar\Projects\<strong>Dingee</strong>\Lab_Data\MAIN_<strong>Dingee</strong> <strong>Reservoir</strong> - Summary for Laboratory Testing Program.xls<br />

TALBE B-2 - PI 7/30/2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!