Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>CHENNAI</strong> <strong>METRO</strong> <strong>RAIL</strong> <strong>NEWS</strong> <strong>LETTER</strong><br />
Volume-I Issue-9<br />
SEPTEMPER 2011<br />
Dr.Sudhir Krishna, IAS<br />
Secretary<br />
Ministry of Urban Development<br />
Government of India &<br />
Chairman, CMRL<br />
Thiru K.Rajaraman, IAS<br />
Managing Director<br />
Thiru S.Krishnamoorthy, IRAS<br />
Chief General Manager<br />
( Public Relations )<br />
<strong>CHENNAI</strong> <strong>METRO</strong> <strong>RAIL</strong> LIMITED<br />
“Harini Towers”<br />
No.7, Conran Smith Road,<br />
Gopalapuram,<br />
<strong>CHENNAI</strong>-600 086.<br />
PH: 044-28430020<br />
FAX: 044-28351401<br />
Website:<br />
www.chennaimetrorail.gov.in<br />
Email:<br />
chennaimetrorail@gmail.com<br />
Safety and Quality Control in Depot works of CMR Project<br />
SAFETY:- At Chennai Metro Rail Project work sites, at most importance is given to<br />
Safety. We have achieved 65.2% in Monthly Audit Report Score ( MARS) in September<br />
2011. Positive approach towards safety by the contractor has been evident by conducting<br />
external trainings like ‘Working at height’, ‘AIDS awareness programme’ from M/s. Red<br />
Cross Society, Internal trainings like ‘Material Handling’, ‘Awareness training for Occupational<br />
Health Risk’ ‘Method statement briefing for all works’, monthly safety meetings etc;<br />
As it is said “Safety is a word with meaning; it is up to us to make it work”. At CMRL depot-<br />
the Consultant and the Contractor make it to work each day as it goes.<br />
AIDS Awareness Training for workers<br />
Depot has been frequently visited by visitors from different streams, to name a few:students<br />
from IIT Madras, Chennai & Students from Musaliar College of Engineering,<br />
Kerala, etc. For all personnel’s at site, be it visitors or staff, are inducted in safety norms<br />
before being taken around the site.<br />
.<br />
Demonstration of working at heights<br />
Safety Park at Depot IIT Madras students – Safety<br />
Induction
Creativity<br />
can<br />
solve almost<br />
any<br />
problem.<br />
The creative<br />
act, the<br />
defeat of<br />
habit<br />
by<br />
originality,<br />
overcomes<br />
everything.<br />
George<br />
Lois<br />
Caption describing picture<br />
or graphic.<br />
Quaity control in CMRL Depot works at Koyambedu<br />
A specific Project Quality Plan (PQP) has been approved and followed for Koyambedu Depot<br />
work. Required Quality Control Team to ensure quality of work has been engaged by contractors<br />
and General Consultants. An independent audit wing of General Consultants also established to<br />
audit the quality of works.<br />
Earth filling & Ground Improvement works:<br />
As per the scope of work a huge earth filling work about 4 lakhs cum is involved in the Koyambedu<br />
work including ground improvement work. The contract provides details of quality control<br />
tests to be conducted for selecting the fill material as well as for earth filling work. The samples of<br />
fill material are tested for particle size distribution, liquid limit, plasticity index, coefficient of uniformity,<br />
free swelling index, sulphate content, optimum moisture content, and maximum dry density<br />
as per PQP. The samples are tested for the moisture content and relative compactions<br />
(FDD) as per contract provisions.<br />
* 294 samples from 23 quarries have been tested for fill material to ascertain the suitability of<br />
the soil as per specifications;<br />
* 3004 samples of soil have been tested for FDD (Field Dry Density) to ensure 98/95% of<br />
MDD as the case may be;<br />
* The settlement of the soil filling is monitored by measuring the settlement through the settlement<br />
marker installed at prescribed spacing; and<br />
* Similarly the pore water pressure of the water in the soft day layer is measured by means of<br />
Piezometers.<br />
Concrete for piling work<br />
Piling work of 600mm dia.(driven cast in-situ) is in progress. Quality control test for concrete in<br />
the field has been conducted as per PQP.<br />
* 645 concrete cubes have been cast so far and it is a continuous process as the concreting in<br />
progress. So far 243 cubes are tested (7 th and 28 th day) as per specifications.<br />
Piezometer Reading in progress Plate Settlement Marker reading in Progress<br />
Progress of Depot work<br />
The up-to-date progress in Depot work is as follows:<br />
Sl. No. Description Unit Qty<br />
1 Earth filling Cum 142787<br />
2 Installation of Prefabricated Vertical Drain(PVD) RMT 880955<br />
3 Surcharge filling Cum 64297<br />
4 Test piles of 600 mm dia (Admn. Bldg. and shed) No 4<br />
5 Working piles of 600 mm dia (Admn. Building) No. 88<br />
Page 2 Chennai Metro Rail Newsletter
Progress of works in Under Ground Sections<br />
Name of Work Status<br />
UAA 01<br />
Washermanpet, Mannadi,<br />
High Court, Chennai Central<br />
and Egmore UG stations<br />
, May Day Park as an<br />
Emergency escape and<br />
Ventilation Shaft and Associated<br />
Tunnels.<br />
UAA 02<br />
Government Estate, LIC<br />
Building and Thousand<br />
Lights UG stations and<br />
Associated Tunnels<br />
UAA 03<br />
New Gemini, Teynampet,<br />
Chamiers Road and<br />
Saidapet UG stations and<br />
Associated Tunnels<br />
UAA 04<br />
Nehru Park, Kilpauk Medical<br />
College and<br />
Pachaiappa’s College UG<br />
stations and Associated<br />
Tunnels<br />
UAA 05<br />
Shenoy Nagar, Anna Nagar<br />
East, Anna Nagar Tower<br />
and Thirumangalam UG<br />
stations and Associated<br />
Tunnels<br />
Volume-I Issue-9<br />
* 95% of soil investigation works have<br />
been completed.<br />
* MTC bus stand work has been fully<br />
completed in Washermenpet.<br />
* Twelve Diaphragm wall panels<br />
casted at MayDay Park.<br />
* Six Diaphragm wall panels casted<br />
at Washer manpet.<br />
* Trail panels work completed in<br />
Egmore.<br />
* Strom water diversion and water<br />
line work in progress at Govt estate<br />
* Trail trench work is in progress at<br />
Thousand light station .<br />
* TMP preparation is on going<br />
* Strom water diversion is in progress<br />
at Saidapet<br />
* New sump (TNHB) work commenced<br />
at institute area.<br />
* Trail trench work is in progress at<br />
Chamiers road station, Teynempet<br />
and Gemini.<br />
* New bus shelter is completed at<br />
Saidapet ramp and removal of 3 bus<br />
bay commenced at MTC .<br />
* Preparatory work for sheet pilling is<br />
commenced at Saidapet ramp<br />
portions.<br />
* TMP preparation is ongoing.<br />
* 100% of soil investigation works<br />
have been completed.<br />
* Utility identification work has been<br />
completed in Nehru Park and shifting<br />
is in progress in KMC Stations.<br />
* Twenty one panels have been completed<br />
for Station Diaphragm wall<br />
construction in Nehru Park<br />
* 26 M of guide wall has been completed<br />
in KMC.<br />
* Traffic diversion work at KMC is in<br />
* Soil investigation works have been<br />
completed in stations and tunnel area.<br />
* Utility identification and shifting work<br />
is in progress in all the stations.<br />
* Diaphragm wall construction work<br />
is in progress and construction of ten<br />
panels of Diaphragm wall completed<br />
at Shenoy Nagar station.<br />
Sonic logging test<br />
Coupler testing<br />
Injury mock drill<br />
I never<br />
see what<br />
has been<br />
done;<br />
I only<br />
see<br />
what<br />
remains<br />
to<br />
be done.<br />
Buddha<br />
Page 3
All human<br />
actions<br />
have one<br />
or more<br />
of these<br />
seven<br />
causes:<br />
chance,<br />
nature,<br />
compulsion,<br />
habit,<br />
reason,<br />
passion, and<br />
desire.<br />
Aristotle<br />
Caption describing picture<br />
or graphic.<br />
Progress of civil works in Elevated Sections<br />
Progress from Koyembedu to Ashok Nagar<br />
as on 30 September, 2011<br />
Item Total Nos<br />
Progress from Ashok Nagar to St.Thomas<br />
Mount as on 30 September, 2011<br />
Progress from Little Mount to O T A<br />
as on 30 September, 2011<br />
Completed<br />
Nos<br />
Piles 1083 907<br />
Pile caps 244 179<br />
Piers 249 143<br />
Spans Erected 150 74<br />
Item<br />
Total<br />
Nos<br />
Completed<br />
Nos<br />
Piles 350 244<br />
Pile caps 87 55<br />
Open foundations<br />
91 45<br />
Piers 178 81<br />
Spans Erected 136 33<br />
Item<br />
Total<br />
Nos<br />
Completed<br />
Nos<br />
Piles 276 139<br />
Pile caps 71 18<br />
Open foundations<br />
197 77<br />
Piers 263 60<br />
Spans Erected 75 4<br />
Fire Drill<br />
Dwall panel drilling fluid quality check<br />
Cube Compression test<br />
Page 4 Chennai Metro Rail Newsletter
Volume-I Issue-9<br />
Latest photos of some of the ongoing works<br />
Parapet gantry work at vadapalani<br />
Aggregate bin construction in casting yard<br />
at Vanagaram<br />
Achievements<br />
Parapet erection work at Vadapalani<br />
Launching of segments of viaduct<br />
near Kasi theater<br />
Thiru Samuel Boswell Durairaj, son of Thiru D.Durairaj, Manager<br />
(PF), CMRL has scored 1149 marks out of 1200, in the +2 pub-<br />
lic examinations conducted by Government of Tamilnadu during<br />
March 2011 and got admission in MBBS at IRT- Perundurai<br />
Medical College, Perundurai, in the free Government seat.<br />
By three<br />
methods<br />
we may<br />
learn wisdom:<br />
First,<br />
by reflection,<br />
which is<br />
noblest;<br />
second,<br />
by imitation,<br />
which is<br />
easiest;<br />
and third<br />
by<br />
experience,<br />
which is the<br />
bitterest.<br />
Confucius<br />
Page 5
Editor : Thiru S.Krishnamoorthy,<br />
IRAS<br />
Sub-Editor : Thiru K.Elanthiraiyan<br />
Translocation of Deer's with care by CMRL<br />
On taking over the land of TANUVAS at Nandanam by<br />
CMRL, major steps were taken to translocate 32 deer’s living in<br />
Poultry Research Station, Nandanam to Aringer Anna Zoological<br />
Park, Vandalur and Guindy National Park, Guindy with the help<br />
of Tamil Nadu Forest Department.<br />
During the course of translocation, first a study was<br />
made on the behaviour of the animal in the location. After the<br />
study, all the drinking spot for deer's inside the campus were<br />
closed . A high fencing was made in different places, deer's were<br />
given food and water by the staffs of forest department regularly<br />
so as to get friendly with the animal. This helped to trap them<br />
easily .<br />
Wooden trap boxes were made to trap the deers for<br />
transporting . Food was kept in the wooden boxes which attracted<br />
the animal and one by one all were trapped and translocated<br />
to the new location.<br />
Throughout the operation, vetenary doctors were present.<br />
Medical tests were conducted to see whether they are strong<br />
enough for journey during translocation. Ambulance was also<br />
present to treat the animal if they get injured during these operations.<br />
This operation took about 4 months. CMRL funded the<br />
whole amount required for the translocation of these 32 deer's to<br />
the Zoo authority of Tamil Nadu. This is the first time in Tamil<br />
Nadu, such a large group of deer's were translocated by CMRL<br />
with 100% success and care.<br />
Published by Chennai Metro Rail Limited.<br />
Please address all correspondence to: The Editor, Chennai Metro Rail News Letter,<br />
Chennai Metro Rail Limited, “Harini Towers”, No.7, Conran Smith Road,<br />
Gopalapuram, Chennai-600 086.<br />
Email: chennaimetrorail@gmail.com