25.01.2015 Views

Forest Preserve District of Cook County South Region

Forest Preserve District of Cook County South Region

Forest Preserve District of Cook County South Region

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Forest</strong> <strong>Preserve</strong> <strong>District</strong> <strong>of</strong> <strong>Cook</strong> <strong>County</strong><br />

14<br />

18<br />

5<br />

4<br />

7<br />

19<br />

10<br />

10<br />

17<br />

2<br />

13<br />

22<br />

10<br />

16<br />

1<br />

20<br />

9<br />

21<br />

3<br />

6<br />

8<br />

15<br />

<strong>South</strong> <strong>Region</strong><br />

11<br />

I<br />

12<br />

9<br />

!<br />

!\<br />

!<br />

!<br />

!<br />

Project Locations<br />

<strong>District</strong> Zones<br />

12<br />

Paved Trails<br />

Unpaved Trails<br />

FPDCC<br />

City <strong>of</strong> Chicago<br />

9


Project Category Map Project Description 2012 2013 2014 2015 2016<br />

General Consulting<br />

Services 1 Sand Ridge Nature Center boardwalk<br />

design $60,000<br />

General Consulting<br />

Services<br />

2<br />

SOUTH REGION<br />

Proposed Capital Improvement Projects‐ Funding Summary<br />

Calumet Sag Bicycle Trail‐ EAST<br />

Section Phase II Eng (Total =$82,311;<br />

80% Grant=$65,849;<br />

20%FPD=$16,462) $16,462<br />

Walks, Shelters &<br />

Ramps<br />

Walks, Shelters &<br />

Ramps<br />

Walks, Shelters &<br />

Ramps<br />

Walks, Shelters &<br />

Ramps<br />

3<br />

4<br />

5<br />

6<br />

Boardwalk replacement at Sand<br />

Ridge Nature Center [Note: Original<br />

estimate <strong>of</strong> $1.2 M reduced by 50%.<br />

Need more affordable alternatives.] $ 600,000<br />

Dan Ryan Woods <strong>South</strong> aqueduct<br />

repair ‐Phase II $25,000<br />

New shelter at <strong>South</strong> Dan Ryan<br />

Woods. $150,000<br />

New picnic shelter at combined<br />

Shabonna Woods/Sand Ridge Nature<br />

Center. $150,000<br />

Restoration ‐<br />

Landscape<br />

Parking Projects 8<br />

Parking Projects 9<br />

Parking Projects 10<br />

7<br />

Replace 4 light poles at Dan Ryan<br />

Woods sledding hill and parking lot,<br />

subject to Rec Needs assessments $25,000<br />

Construct new parking lots for<br />

Burnham Prairie ($550k) and Thorn<br />

Creek ($330k) acquisitions $880,000<br />

Repave deteriorated parking lots in<br />

Thorn Creek Divn: Sand Ridge NC<br />

redesign ($110k), North Creek<br />

Meadow ($175k), Plum Creek<br />

($190k). $300,000 $175,000<br />

Redesign and repave deteriorated<br />

parking lots in Calumet Divn:<br />

Beaubien Woods Boating Center<br />

($290k); Eggers Grove after comfort<br />

station completed ($286k), Calumet<br />

Woods ($76k). $290,000 $286,000 $76,000<br />

Trail System<br />

11 Resurface Thorn Creek Bicycle Trail ‐<br />

Rebuilding<br />

186th and Glenwood Lansing $600,000<br />

Thorn Creek Bicycle Trail Completion<br />

New Trail System 12 (20% FPDCC match; $5,700,000 total<br />

cost). $376,200 $763,800<br />

Calumet‐Sag Bicycle Trail‐ EAST<br />

New Trail System 13 Section (20% FPDCC match;<br />

$1,593,832 total cost) $318,766


<strong>South</strong><br />

New Trail System 14<br />

New bicycle trail at Dan Ryan Woods<br />

(20% FPDCC match; $390,000 total<br />

project cost). $78,000<br />

New Trail System 15<br />

Burnham Greenway Bicycle Trail<br />

extension to Sand Ridge Nature<br />

Center. $430,000<br />

New Trail System 16 Beaubien Woods Bicycle Trail $300,000<br />

New Trail System 17 Loop Trail at Whistler Woods (NEW) <br />

Support Facilities 18<br />

Sewer & Water<br />

Construction<br />

Fences, Gates,<br />

Concrete Units<br />

Calumet Subdivn HQ at 87th St. &<br />

Western ‐ new windows ‐ pending<br />

building needs analysis $45,000<br />

19 Water Line at Eggers Grove $350,000<br />

Fence repair at Sand Ridge Nature<br />

20<br />

Center $25,000<br />

Fences, Gates,<br />

Concrete Units<br />

Fences, Gates,<br />

Concrete Units<br />

21 Install fence at Shabonna Woods to<br />

incorporate into Sand Ridge NC $300,000<br />

Beaubien Woods boat launch<br />

22<br />

parking lot fence $25,000<br />

<strong>South</strong> Total $ 4,025,662 $ 1,638,566 $ 175,000 $ 806,000 $ ‐<br />

Page 2 <strong>of</strong> 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!