Lindenberg Emirates Company Profile

lindenberg.ae

Lindenberg Emirates Company Profile

LE-PROFILE | ver.3 | rev.4.5 | 21.06.2010

LINDENBERG-EMIRATES LLC


Company Profile 3~15

• About Lindenberg Emirates 3

• Scope of Activities 4

• Completed Projects 5

• Ongoing Projects 6~7

• Representation of Lindenberg Anlagen 8

Company Organization Chart 9

Company Manpower Chart 10

Company Registration, Pre-qualification & Classification 11~13

• Project References 14~15

Lindenberg Power Division 16~29

• Division Profile 16~17

• Scope of Activities 18

• Typical Power Project Organization Chart 19

• Featured Projects 20~28

• Power Stations 29

Lindenberg Water & Drainage Division 30~40

• Division Profile 30~31

• Scope of Activities 31

• Typical Water Project Organization Chart 32

• Featured Projects 33~40

QHSE Policy 41

Company Recourses 42~47

• Workforce & Labour Camp 42

• Store Facilities 43

• Plant, Machinery, Vehicles & Equipments 44~47

Contact Information 48


About Lindenberg-Emirates

Located in the United Arab Emirates, with

its center of operation and main office in

Abu Dhabi, Lindenberg-Emirates LLC

specializes in Engineering, Procurement,

and Construction (EPC) mode of project

delivery.

Lindenberg-Emirates LLC employs manpower expertise in all aspects of contracting including civil

engineering, pipeline construction, turn-key industrial plants, mechanical and electrical installations,

and services to the electromechanical industry including testing, maintenance and operational work

which is fully supported by computer aided design (CAD) facilities, computerized project monitoring,

accounting, and cost control systems.

3

Company Details

• Date Established: 20.11.2001

• Ownership: UAE Partner 51%, Lindenberg Anlagen 49%

• Incorporated in:

• Principal Bankers:

Abu Dhabi, United Arab Emirates

Arab Bank for Investment Foreign Trade

National Bank of Abu Dhabi

HSBC Bank


Scope of Activities

Power Related Activities

• Construction & Installation of Power Transmission and Distribution Networks

• Installation of High Voltage Cables

• Substation Turnkey Low, Medium and High Voltage & Package Substation Installation

• High & Medium Voltage Switchgear & Transformer Installation

• Submarine Cable Installation

Power Related Activities

• Water Transmission & Distribution, Storm Water, Drainage & Irrigation Networks

• EPC Projects of Water & Sewerage including Pumping Stations

• Submarine Pipe Laying

Power Related Activities

• On Shore and Off Shore Oil and Gas Field Services

• Maintenance Services for Oil/Gas Production Utilities

• Technical Maintenance for Equipment, Industrial and Petroleum Plant

Repair & Maintenance Works

4

• Repair and Maintenance of Pumping Stations, Sewerage Networks & Water Drainage Lines


Projects Successfully Completed in Abu Dhabi, UAE

• Power Supply for Palaces and Hospitals (2001)

• Supply & Installation of Diesel Generators (2002)

• Power Supply for Palaces and Hospitals Stage3 (2004)

• Supply of Automatic Transfer Switches to ADDC (2006)

• Drainage Network at Marina Al Bateen, Abu Dhabi (2006)

• Water Networks at Al Qadra Village (2007)

• Water Transmission Line from Sweihan to Remah (2009)

• Water Supply to Sadiyat Island (2009)

• Sewerage and Surface Drainage Works (2009)

• Modification of Switching Stations in Abu Dhabi (2009)

• Water Transmission Lines inside Al Reem Island (2010)

Project Value (AED)

177 Million

13 Million

26 Million

130 Thousand

196 Thousand

16 Million

26 Million

108 Million

10 Million

17 Million

56 Million

5


Ongoing Projects - Power

Project Value (AED)

• Power Supply for Palaces and Hospitals Stage3, Phase3 (2005) 103

• Security & Upgrading of 11kV Electrical Networks (2008) 40

• Installation of Underground Cables, Electrical Distribution

Equipment, OHL and Allied Works in Abu Dhabi (2009)

• Procurement of LV Panels Switchgear (2009) 17

• Electrical & Civil Eng. Works for Battery Energy Storage (2009) 142

• Replacement of 11 KV Switchgears and Substations (2010) 82

• Transfer of 11kV Load & Primary Substation in Abu Dhabi (2010) 19.7

• Fast Track Construction Works Contract in Eastern Region (Group 2) 12

• Fast Track Contract for 11KV & LV Networks in Central Region 1.7

• Transfer of Load to New 132/11 kV W24 and E01 Primary Substations 34

10 / year

6


Ongoing Projects – Water & Drainage

Project Value (AED)

• Water Transmission Pipeline in Dubai (2007) 85

• Water Transmission Scheme inside Sadiyat Island (2008) 577

• Water Transmission Pipeline in Baniyas (2008) 86

• EPC Works for Al Ain Distribution Network – Pipelines Umn Ghaffa

Floating Reservoir Station – Lot D (2010)

• Replacement of Existing Sewer Networks Inside Abu Dhabi Island (2010) 116

174.5

7


Representation of Lindenberg Anlagen

Lindenberg Emirates represents Lindenberg Anlagen GmbH Germany for its products and services in

the United Arab Emirates.

Lindenberg Anlagen GmbH Germany is a world class leader in the design and manufacturing of Power

Generation System and has international presence in more than 72 countries.

8


Company Organization Chart

CHAIRMAN

GENERAL MANAGER

GM Secretariat

HR/ADMIN

DEPARTMENT

RECRUITMENT

DEPARTMENT

BUSINESS

DEVELOPMENT

OPERATIONS

LEGAL

DEPARTMENT

HSE

DEPARTMENT

QA/QC

DEPARTMENT

HR/Admin

Manager

Recruitment

Manager

Business Dev.

Manager

Chief Operating

Officer (COO)

Lawyer

HSE Manager

QA/QC Manager

Senior HR/Admin

Officer

Recruitment

Coordinator

Business Dev.

Associate

Legal Advisor

HSE Engineers

QA/QC Engineers

Personnel Officer Safety Officers QA/QC Inspectors

COO Secretariat

DOCUMENT

CONTROL DEPT.

ESTIMATION &

PROPOSAL

PLANT/WORKSHOP

COST CONTROL

PLANNING

DEPARTMENT

CIVIL

DEPARTMENT

POWER DIVISION

WATER &

DRAINAGE DIVISION

CONTRACTS

DEPARTMENT

FINANCE DEPT.

PROCUREMENT &

STORES

IT DEPARTMENT

Senior Document

Controller

Head of Estimation

Department

Plant Manager

Cost Control

Manager

Planning Manager

Civil Department

Manager

Head of Power

Division

Division Manager

Contracts Manager

Finance Manager

Corporate

Purchase Manager

IT Administrator

Senior Estimation

Engineers

Plant Engineer

Lead Cost

Control Engineer

Senior Planning

Engineers

Project Managers

Project Manager

Projects Manager

Contracts Engineer

Accounts Manager

Procurement

Engineers

Network Engineer

Estimation

Engineers

Plant/Workshop

Foreman

Cost Control

Engineers

Planning Engineers

Construction

Managers

Construction

Managers

Project Managers

Chief Accountant

Purchase Officers

IT Assistant

Transport Officer

Project Team &

Work Crew

Project Team &

Work Crew

Construction

Managers

Senior

Accountants

Project Team &

Work Crew

Accountants

9


Company Manpower Chart

Staff Category (Total: 426)

Electrician, 62

Drivers - All

Discipline, 58

Foreman &

Supervisors, 51

Pipe Fitters, 31

Skilled & Unskilled Workers (Total: 594)

Engineers - All

Discipline, 68

Land Surveyors, 21

Instrument

Technicians / Fitters,

7

Painters, 7

QA/QC

Engineers, 3

Coordinators, 5

Administrators, 6

Officers & Legal

Advisors, 6

Draftsman - All

Discipline, 12

Document

Controllers, 11

Planning & Cost

Control, 9

Secretaries, 15

Accountants, 14

Safety -

Officers/Inspectors,

13

Storekeepers /

Timekeepers, 19

Project Managers /

Dept. Heads, 15

Laborers, 248

Mechanics, 9

Carpenters, 94

Watchmen, 8

Welders, 15

Operators, 48

Masons, 54

Steel Fixers, 52

Cleaners / Office

Boy, 29

Charged Hands, 23

Reception & Office

Assistants, 7

10

Data as of 16-Jun-2010


Registration / Clients List

Lindenberg is registered / pre-qualified in the following companies / government agencies:

11

1. Abu Dhabi Distribution Company (ADDC)

2. Abu Dhabi Future Energy Company (MASDAR)

3. Abu Dhabi Gas Industries Ltd. (GASCO)

4. Abu Dhabi Marine Operating Company (ADMA-OPCO)

5. Abu Dhabi Ministry of Defense – Military Works Dept.

6. Abu Dhabi National Oil Company (ADNOC)

7. Abu Dhabi Oil Refining Company (TAKREER)

8. Abu Dhabi Police General Head Quarters

9. Abu Dhabi Polymers Co. Ltd. (Borouge)

10. Abu Dhabi Sewerage Services Company (ADSSC)

11. Abu Dhabi Transmission & Despatch Company (TRANSCO)

12. Abu Dhabi Water & Electricity Authority (ADWEA)

13. Al Ain Distribution Company (AADC)

14. ALDAR Properties PJSC

15. Sorouh Properties

16. The National Central Cooling Co. PJSC (TABREED)

1 2 3 4

5 6 7 8

9 10 11 12

13 14 15 16


Lindenberg is Prequalified & Tendering for ADSSC’s STEP Project:

1. Lindenberg Emirates is currently one of the 5

prequalified companies for the Sewerage

Tunnel Enhancement Project “STEP Project”

comprising of a 45 km tunnel of 5-meter

diameter at a depth of 40-45 meters. The

project is expected to be worth of 3 Billion

AED and will be executed together with a

consortium of Major Korean Construction

Companies.

2. Tender No. O-1506, STEP Deep Tunnel Sewer

Contract T-02

3. Tender No. O-1578, STEP Deep Tunnel Sewer

Contract T-03

12


Company Classification at Abu Dhabi Department of Planning & Economy

Sr. No. Field Scope of Works Category

1. WATER PROJECTS

1. Water Transport Plants & Networks

2. Water Distribution Plants & Networks

1 st

1 st

2. ELECTRICAL PROJECTS

1. Power Distribution Networks & Plants

2. Communications Networks

2 nd

5 th

3. SEWERAGE PROJECTS

1. Main Sewerage Networks

2. Sewerage Sub-Networks & House Connections

5 th

5 th

4.

MECHANICAL & ELECTRICAL WORKS

PROJECTS 1. Mechanical and Electrical Works 5 th

5. BUILDING PROJECTS

1. All types of Buildings

2. Metallic Constructions

5 th

5 th

13


Power Projects

SN Contract No. Contract Name Client Contract Value Award Date Consultant Status

1 R-99-0157

Security of the Electric Power Supply and Upgrade of the Network for Presidential

Palaces and Hospitals

ADWEA AED 176,957,025 08.02.2000 Mott MacDonald Completed

2 G-1206 Supply and Installation of 8 Nos. 415 Volts Diesel Generators ADWEA AED 13,039,984 10.04.2002 Mott MacDonald Completed

3 G-1494

Security of the Electric Power Supply and Upgrade of the Network for Presidential

Palaces and Hospitals, Stage-III Phase-III, Lot-1

ADWEA AED 25,914,216 05.02.2003

Lahmeyer

International GmbH

Completed

4 G-1882

Security of the Electric Power Supply and Upgrade of the Network for Presidential

Palaces and Hospitals (Stage-III Phase-III)

ADWEA AED 103,122,825 07.08.2005

Lahmeyer

International GmbH

Ongoing

5 D-7150

Security and Upgrading of 11 kV Electrical Network for H.H. Shk. Khalifa Palace

in Abu Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach Palace

ADDC AED 40,667,381 05.05.2008

Ozen Levent

Power Engineering

Consultancy LLC

Ongoing

6 D-7720 Modification of Switching Stations in Abu Dhabi Island ADDC AED 16,999,999 06.10.2008 - Completed

7 D-9710/C

8 115979C13E

9 G-6334

Long Term Rate Agreement for Installation of Underground Cables, Electrical

Distribution Equipment, OHL and allied works in Abu Dhabi Eastern Region

Ruwais Housing Complex Expansion – Phase III, Procurement of Electrical

Equipment – Low Voltage (LV) Panels Switchgear

Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery

Energy Storage (42MW)

ADDC

AED 10,000,000 /

YEAR

06.04.2009 - Ongoing

ADNOC AED 17,432,437 23.04.2009 - Ongoing

ADWEA AED 142,271,120 23.11.2009

Deutsche Energie-

Consult GmbH

Ongoing

10 D-6990 Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations ADDC AED 81,991,962 03.01.2010 Parsons Brinckerhoff Ongoing

11 D-10599

Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi

Island & Eastern Region

ADDC AED 19,683,403 10.02.2010 DECON Ongoing

12 D-10624

Transfer of Load to New 132/11 kV W24 and E01 Primary Substations in Abu

Dhabi Island

TRANSCO AED 174,524,364 07.03.2010

ILF Consulting

Engineers

Ongoing

14


Water & Drainage Projects

SN Contract No. Contract Name Client Contract Value Award Date Consultant Status

1 D-5630

Urgent Works at Al Qadra Village Owned by

HH Sheikh Mansour Bin Zayed

ADWEA AED 16,877,777 15.04.2006 Italconsult Completed

2 N-4604 DN 1000mm Transmission Pipeline from Sweihan to Remah TRANSCO AED 25,889,764 23.07.2007 Mott Mac Donald Completed

3 N-2622.1 Water Supply to Sadiyat Island and Adjacent Areas – Lot A,B, & C TRANSCO AED 108,118,493 22.07.2007

4 D-6972

5 N-5807

Linking of Delma Two (2) MGD RO Plant to Main Delma Reservoirs Construction

of 119 Water House Connections

Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat /

Abu Dhabi Island

ADDC AED 4,633,941 06.08.2007

TRANSCO AED 569,594,995 20.01.2008

Tebodin Consultants &

Engineers

Dr. MH Ali El-Saie

Consulting Engineers

Tebodin Consultants

and Engineers

Completed

Completed

Ongoing

6 O-1047 Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib) ADSSC AED 10,400,000 30.01.2008 Parsons Intl Ltd Completed

7 N-5386 Water Transmission Lines Inside Al Reem Island – Lot A TRANSCO AED 56,455,067 03.02.2008

Tebodin Consultants

and Engineers

Completed

8 D-7310.1 Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway ADDC AED 94,037,448 22.05.2008 Italconsult Ongoing

9 N-6821

10 O-1463

EPC Works for Al Ain Distribution Network – Pipelines Umn Ghaffa Floating

Reservoir Station – Lot D

Works Associated with the Replacement of Existing Sewer Networks at Some

Sectors Inside Abu Dhabi Island - Category A

TRANSCO AED 174,524,364 07.03.2010

ILF Consulting

Engineers

Ongoing

ADSSC AED 116,026,699 13.06.2010 Dorsch Gruppe Awarded

15


Division Profile

Lindenberg Power Division provides expertise in implementing Electromechanical and

Instrumentation projects on turnkey basis, starting from the design stage to construction, testing and

commissioning and maintenance services for diverse industrial projects.

Having the expertise in turnkey contracting on many projects, the Power Division is very familiar

with all criteria necessary for the successful execution of Electromechanical projects. The Power

Division builds these mandatory requirements into all projects:

• Reliable and efficient performance

• Single-point responsibility

• ISO-certified quality control procedures

• Proven safety programs

• Cost controls and reductions

• Productive and on-time scheduling

16


Division Profile

The Power Division provides a dedicated technical and managerial team necessary to design and

construct new facilities or upgrades. By bringing together every aspect of a power project under a

single management team, the division provides economical and efficient solutions to meet the needs

of a diverse industry base.

The project management team comprised of specialists in the design, construction and operation of

complex type of projects. From concept through acceptance, the division provides the optimal

resources, equipment and services to meet all contractual requirements. The EPC team is

accountable for the following critical functions:

• Planning, organizing and procedures

• Scheduling and tracking

• Cost control

• Document control

• Single-point customer contact

• Progress reporting

17


Scope of Activities

• Contracting works for Power Networks and Distribution Systems

• Underground cable network including jointing, termination, testing and commissioning

• Complete electrical and instrumentation works for Power Plants, Refineries, Power Stations,

Desalination Plants and Sewerage Treatment Plants

• Turnkey contracting works for LV / MV / HV Substations

• EPC works for electric generators

• Installation and commissioning of auxiliary powers, package substation, control panels and

transmission lines

• Contracting works for plant fire fighting and safety alarm systems, remote monitors, and fire

suppression systems.

• Control / MCC room fire suppression systems installation

• Submarine Cable Installation

• Industrial Building Construction

• HVAC Works

• LV / MV / HV Switchgear and Transformer Installation

• Installation and Commissioning of Auxiliary Power Supplies

18


Typical Power Project Organization Chart

HEAD OF POWER DIVISION

PROJECT MANAGER

ENGINEERING

PLANNING & QS

CONSTRUCTION

HSE & QA/QC

OFFICE SUPPORT

Civil Engineer

Electrical Engineer

Planning Engineer

QS

Construction Manager /

Project Engineer

HSE Engineer

QA/QC Engineer

Coordinator

Secretary

Draftsman

Storekeeper

Timekeeper

Watchman

Mechanical Engineer

Civil Engineer

Electrical Engineer

Testing & Comm. Eng.

Design Coordinator

Mechanical Foreman

Civil Foreman Electrical Foreman Draftsman (Electrical)

Draftsman (Electromech’l)

19


Featured Projects

Security of the Electric Power Supply and Upgrade of the Network for Presidential

Palaces and Hospitals

Contract No.

Client

R-99-0157

Value AED 176,957,025

Award Date 08.02.2000

Description

Abu Dhabi Water & Electricity Authority (ADWEA)

Supply, Installation, Testing & Commissioning Works

20


Featured Projects

Security of the Electric Power Supply and Upgrade of the Network for Presidential

Palaces & Hospitals (Stage-III Phase-III)

Contract No. G-1882

Client

Value AED 103,122,825

Award Date 07.08.2005

Description

Abu Dhabi Water & Electricity Authority (ADWEA)

Design, Supply, Installation Testing and Commissioning including remote

control monitoring system, ISMS, and Medium Voltage Panels.

21


Featured Projects

Supply and Installation of 8 Nos. 415 Volts Diesel Generators

Contract No. G-1206

Client

Value AED 13,039,984

Award Date 10.04.2002

Abu Dhabi Water & Electricity Authority (ADWEA)

Description Design, Supply, Installation, Testing and Commissioning of 8 Nos. 415

Volts Diesel Generators

22


Featured Projects

Security of the Electric Power Supply and Upgrade of the Network for Presidential

Palaces and Hospitals Stage-III Phase-III. Lot-1

Contract No. G-1494

Client

Value AED 25,914,216

Award Date 05.02.2003

Description

Abu Dhabi Water & Electricity Authority (ADWEA)

Design, Supply, Installation Testing and Commissioning Works

23


Featured Projects

Security and Upgrading of 11 kV Electrical Network for H.H. Shk. Khalifa Palace in Abu

Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach Palace

Contract No. D-7150

Client

Value AED 40,667,381

Award Date 05.05.2008

Abu Dhabi Distribution Company (ADDC)

Description Design, Supply, Installation Testing and Commissioning of 11KV

Switching Station & replacement of Switchgears, Control Panels, DC

system in Beach Palace Stations B4, B5 Stations & Standby power plant

in H.H.Shk Khalifa Switching station.

24


Featured Projects

Modification of Switching Stations in Abu Dhabi Island

Contract No. D-7720

Client

Value AED 16,999,999

Award Date 06.08.2008

Description

Abu Dhabi Distribution Company (ADDC)

Supply, Installation & Commissioning of RMU’s and Modification of Transformer Panel to Feeder Panel in Switching

Stations.

Long Term Rate Agreement for Installation of Underground Cables, Electrical Distribution Equipment, OHL and allied works in Abu

Dhabi Eastern Region

Contract No.

Client

Value

D-9710/C

Award Date 16.04.2009

Abu Dhabi Distribution Company (ADDC)

AED 10,000,000 per year

Description Installation of Underground Cables, Electrical Distribution Equipments, OHL and Allied Works as per Work Order

Basis

25


Featured Projects

Ruwais Housing Complex Expansion – Phase III, Procurement of Electrical Equipment – Low Voltage (LV) Panels Switchgear

Contract No. 115979C13E

Client

Abu Dhabi National Oil Company (ADNOC)

Value AED 17,432,437

Award Date 23.04.2009

Description Supply & Delivery of Low Voltage Panels Switchgear

Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery Energy Storage (42MW)

Contract No. G-6334

Client

Value AED 142,271,120

Award Date 23.11.2009

Description

Abu Dhabi Water and Electricity Authority (ADWEA)

Design & Construction of 10 Nos. BESS Substation & Installation Testing Commissioning of NGK Batteries & Supply of

Auxiliary Items.

26


Featured Projects

Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations

Contract No. D-6990

Client

Value AED 81,991,962

Award Date 03.01.2010

Abu Dhabi Distribution Company (ADDC)

Description Design & Construction of 1 New 132/11 kV Substation & Modification of 11 kV Network and Replacement with new 11

kV Switchgear @ 2 nos. Substation.

Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi Island & Eastern Region (2010)

Contract No. D-10599

Client

Abu Dhabi Distribution Company (ADDC)

Value AED 19,683,403

Award Date 10.02.2010

Description EPC for 2 Nos. 25 Million Gallons Steel Tanks and associated Civil and Pipeline Works.

27


Featured Projects

Transfer of Load to New 132/11 kV W24 and E01 Primary Substations in Abu Dhabi Island

Contract No. D-10624

Client

Value AED 34,028,598

Award Date 25.05.2010

Description

Abu Dhabi Distribution Company (ADDC)

Supply of 11kV Switchgear, DC System, LVAC, DMS System, Auxiliary Transformer and Joints & Terminations.

Installation of Power Cables, 11/0.415kV Package S/S and Civil Works i.e. Building, Trenching, etc.

28


Power Stations

Power Station with Diesel Engine for operation

on Diesel, Crude Oil and HFO

Turnkey Power Stations up to 12 MW

Powered with Diesel, Gas and Dual Fuel Engines

29

Power Station with Gas Engines

Power Station with Dual Fuel Engines


Division Profile

In order to accommodate the brisk developments of UAE’s industry, Lindenberg Water and Drainage

Division was established to provide water and drainage solutions.

The Division has up-to-date working knowledge of is very well conversant with the requirements in

water supply and water distribution network. The necessary infrastructure, including manpower,

reliable sources of suppliers, equipment are readily available at our disposal.

30


Division Profile

The Water & Drainage Division is acknowledged as the premier provider of the highest quality

professional service in the field of water and drainage facilities; insuring absolute client satisfaction

through the expertise and experience of its people. The division aims to provide new technologies,

processes, and materials to build and deliver water and drainage facilities that are best suitable for

their class & area of usage.

Scope of Activities

• Water Pipeline Networks

• Water & Irrigation Reservoirs

• Water & Sewerage Pumping Stations

• Sewage Treatment Plants

• Operation & Maintenance of Sewerage

Networks and Pumping Stations

31


Typical Water & Drainage Project Organization Chart

DIVISION MANAGER

PROJECT MANAGER

ENGINEERING

PLANNING & QS

CONSTRUCTION

HSE & QA/QC

OFFICE SUPPORT

Civil Engineer

Electromech’l Engineer

Inst & Ctrl. Engineer

Planning Engineer

QS

Construction Manager /

Project Engineer

HSE Engineer

QA/QC Engineer

Coordinator

Secretary

Draftsman

Storekeeper

Timekeeper

Watchman

Site Engineer Site Engineer Site Engineer

Water Tank Works

(Concrete Construction)

Civil Works Pipeline Works Chamber Works Electromechanical Works Inst’n & Control Works

Foreman Civil Foreman Pipeline Foreman Chamber Foreman E/M Foreman I & C Foreman

Work Crew Land Surveyor Land Surveyor Land Surveyor E/W Work Crew I & C Work Crew

Civil Work Crew Pipeline Crew Chamber Crew

32


Featured Projects

Urgent Works at Al Qadra Village Owned by HH Sheikh Mansour Bin Zayed

Contract No. D-5630

Client Abu Dhabi Water & Electricity Authority (ADWEA)

Value AED 16,877,777

Award Date 15.04.2006

Description Supply, Construction & Maintain Water Supply Network

33


Featured Projects

DN 1000mm Transmission Pipeline from Sweihan to Remah

Contract No. N-4604

Client Abu Dhabi Transmission & Despatch Company (TRANSCO)

Value AED 25,889,764

Award Date 23.07.2007

Description Supply, Construction, and Installation of Water Transmission Pipelines

34


Featured Projects

Water Supply to Sadiyat Island and Adjacent Areas – Lots A, B, & C

Contract No. N-2622.1

Client Abu Dhabi Transmission & Despatch Company (TRANSCO)

Value AED 108,118,493

Award Date 22.07.2007

Description Supply, Construction, & Installation of Water Supply Network

35


Featured Projects

Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat / Abu Dhabi

Island

Contract No. N-5807

Client

Value AED 569,594,995

Award Date 20.01.2008

Description

Abu Dhabi Transmission & Despatch Company (TRANSCO)

Construction of DI/CS Pipelines

36


Featured Projects

Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib)

Contract No. O-1047

Client

Value AED 10,400,000

Award Date 30.01.2008

Description

Abu Dhabi Sewerage Services Company (ADSSC)

Miscellaneous Sewerage and Drainage Works at Sas Al Nakheel & Sash

Shuhaib

37


Featured Projects

Water Transmission Lines Inside Al Reem Island – Lot A

Contract No. N-5386

Client Abu Dhabi Transmission & Despatch Company (TRANSCO)

Value AED 56,455,067

Award Date 03.02.2008

Description Installation of DI/CS Pipelines

38


Featured Projects

Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway

Contract No. D-7310.1

Client Abu Dhabi Distribution Company (ADDC)

Value AED 94,037,448

Award Date 22.05.2008

Description Supply and Replacement of Water Transmission Pipelines

39


Featured Projects

EPC Works for Al Ain Distribution Network - Pipelines Umn Ghaffa Floating Reservoir Station - Lot D

Contract No. N-6821

Client

Abu Dhabi Transmission & Despatch Company (TRANSCO)

Value AED 174,524,364

Award Date 07.03.2010

Description EPC for 2 Nos. 25 Million Gallons Steel Tanks and associated Civil and Pipeline Works.

Works Associated with the Replacement of Existing Sewer Networks at Some Sectors Inside Abu Dhabi Island - Category A

Contract No. O-1463

Client

Abu Dhabi Sewerage Services Company (ADSSC)

Value AED 116,026,699

Award Date 13.06.2010

Description Construction, Replacement & Rehabilitation of Existing Sewer Lines and Manholes Inside Abu Dhabi Island.

40


QHSE Policy

LINDENBERG EMIRATES LLC establishes, implements and

maintains effective QHSE (Quality, Occupational Health & Safety

and Environmental) Management Systems in line with the

requirements of ISO 9001:2008, ISO 14001:2004 & OHSAS

18001:2007, to ensure that customer requirements are met.

This is carried out with the aim of enhancing customer

satisfaction. LINDENBERG EMIRATES LLC complies with

applicable Health, Safety and Environmental legal and other

requirements in order to prevent incidents, injury, ill health, and

pollution and to encourage the conservation of natural resources.

LINDENBERG EMIRATES LLC is committed to the continual

improvement of its QHSE Management Systems through setting

Objectives & Targets and continuously reviewing them; and by

providing training for employees to deal with their day to day

responsibilities safely, competently and in an environmentally

sustainable manner.

LINDENBERG EMIRATES LLC is committed to communicating the

QHSE policy to employees within the organization and to other

interested parties. The policy shall be reviewed periodically to

ensure its suitability, relevance and appropriateness at all times.

LINDENBERG EMIRATES LLC aims to pursue this policy by:

• Instilling and promoting safety consciousness amongst

employees & sub-contractors to prevent ill health, injury

and incidents

• Implementing innovative measures to continuously improve

its QHSE practices

• Meeting applicable legal & other requirements

• Communicating the policy to interested parties

• Minimizing the generation of hazardous and toxic waste

where possible

• Providing safe and healthy working environments for its

employees, customers, and subcontractors

• Preventing the release, spill and leakage of harmful

substances into the environment, and taking immediate

action to contain any accidental discharge

• Encouraging reducing, recycling and re-using materials

where possible.

AHMAD ZAABRI

General Manager

41

LE-IMS-Pol | rev. 0


Workforce and Labour Camp

Lindenberg-Emirates LLC employs almost 600 Skilled and Unskilled Labors. Labor Camps with all

modern facilities are established in Al Faya, Mussafah and Al Ain to accommodate the requirements of

the health & safety of the workforce.

Camp Location Size No. of Rooms

Capacity

(No. of Occupants)

Al Faya 1,300 m 2 96 864

Mussafah (M36) 876 m 2 48 290

Al Ain 400 m 2 28 180

TOTAL 2,576 m 2 172 1,334

42


Store Facilities

Aside from Projects Sites Stores and Yards, two Main Stores of 30x20 m2 are operational at Mussafah

to help in storing & preserving the materials received for different projects, also used for storage of

our standard erection tools required during installation/ commissioning activities.

43


Plant, Machineries, Vehicles and Equipment

Lindenberg Emirates’ policy in Vehicles, Equipment and Machinery is to:

• purchase and own all equipment to cover the project needs.

• self-maintain these vehicles, equipment and machinery.

• hire vehicles, equipment and machinery to prevent delays in the project execution.

44


Vehicles and Machineries List

SN PLANT / EQUIPMENT DESCRIPTION CAPACITY QTY YEAR of PURCHASE

45

1. Air Compressor, Diesel 289 CFM 6 2008

2. Air Compressor, Electric 200 L 2 2008

3. Asphalt Cutter FS 410D 5 Hp 1 2008

4. Backhoe Loader, CAT 422 E 76 HP/ 1.25Cu.m 1 2007

5. Backhoe Loader, JCB CX3 76 HP/ 1.25Cu.m 2 2008

6. Bar Bending Machine 4 HP/up 34 mm 6 2008

7. Bar Cutting Machine 4 HP/up 34 mm 6 2008

8. Battery Charger 230V / DC12-24V 12 -24 V 1 2008

9. Bus (Daewoo) 66 Seater 1 2008

10. Bus (Tata) 66 Seater 1 2006

11. Butt Wilding Machine 90 mm - 315 mm 2 2008

12. Concrete Mixer 750 750 L 1 2008

13. Concrete Mixer, BB350L 350 L 2 2008

14. Concrete Vibrator, with accessories 4.8 HP 15 2008

15. Dewatering Pumps 300 Cu.m/h 35 2008

16. Diesel Storage Tank 4000 USG 4000 ~ 12000 Gl 11 2008

17. Diesel Water Pump 3, PTD306 Dia 3" 5 2008

18. Double Drum Roller Compactor 825 Kg 9 2008

19. ELE . Welding Machine 225 AMP 225 Amp 5 2008

20. Excavator, CAT 320CL 20 Ton 1 2007

21. Excavator, CAT 330D 30 Ton 1 2007


Vehicles and Machineries List

SN PLANT / EQUIPMENT DESCRIPTION CAPACITY QTY YEAR of PURCHASE

46

22. Excavator, Komatsu PC220 20 Ton 2 2008

23. Excavator, Komatsu PC300 30 Ton 2 2008

24. Excavator, Komatsu PC300 30 Ton 2 2009

25. Excavator, Komatsu PC400 40 Ton 1 2008

26. Excavator, Komatsu PC400 40 Ton 5 2009

27. Fast Boat 34' 34 Feet 1 2008

28. Fast Boat 38' 38 Feet 1 2008

29. Flat Bed Truck Trailer 60 Ton 4 2008

30. Ford 4x4 4 x4 4 2007

31. Generator, Diesel 5 ~ 135 KVA 19 2008

32. Generator, Petrol 5 KVA 6 2008

33. Hand Spray Pump With Accessories 1/2 " Dia 3 2008

34. Hiap Truck (Nissan) 6.5 Ton 3 2008

35. Jack Hammer for Air Compressor 34 KG 6 2008

36. Jetting Pump 4" 4" Dia 4 2008

37. Low Bed Truck Trailer 70 Ton 1 2008

38. Mobile Crane 55T 55 Ton 1 2008

39. Mobile Crane 70T 70 Ton 1 2008

40. Mobile Workshop (Nissan Truck) 8 Ton 1 2008

41. Pickup Double Cabin 4x4 1 2006

42. Pipe Carrier Saddles - 1 2008


Vehicles and Machineries List

SN PLANT / EQUIPMENT DESCRIPTION CAPACITY QTY YEAR of PURCHASE

47

43. Pipe Wrapping Machine - 1 2008

44. Plate Compactors 132 Kg 11 2008

45. Preassure Pump 1/2 " Dia 2 2008

46. Rolli Craddles uo to 60" 1 2008

47. Side Boom (Komatsu Pipe Lier) 58 Ton 2 2009

48. Six Wheel Tipper (Volvo) 18 Cu.M. 2 2008

49. Skid Steer, CAT 216B 52 HP/0.26 Cu.m 1 2007

50. Submersible Pump 2" Dia 1 2008

51. Table Saw Bench - Power Cutter 315 mm / 4.5 HP 5 2008

52. Toyota Fortuner 4x4 1 2008

53. Tractor - Flatbed (Volvo / Scania) 50 Ton 2 2008

54. Tractor - Lowbed (Volvo) 70 Ton 1 2008

55. Water Tanker (Nissan) 3,000 GL 3 2008

56. Welding Machine, Diesel 400 Amp 6 2008

57. Welding Machine, Electric 400 Amp 2 2008

58. Wheel Excavator, CAT M316D 16 Ton 1 2008

59. Wheel Loader, CAT 950H 196 HP/ 3 Cu.m 1 2007

60. Wheel Loader, CAT 950H 196 HP/ 3 Cu.m 3 2009

61. Wheel Loader, CAT 962H 211 HP/ 3.2 Cu.m 5 2008

62. Wheel Loader, CAT 966H 262 HP/ 4 Cu.m 2 2009

63. Pipe Wrapping Machine - 1 2008


Contact Information

We hope that the information given and detailed in this Company Profile is sufficient to illustrate the

potential and capabilities of Lindenberg. We will be pleased to provide further information on your

request. Kindly contact us.

Lindenberg Emirates LLc

Lindenberg Water & Drainage Division

P.O. Box 42630, Abu Dhabi,

(A Division of Lindenberg Emirates LLC)

United Arab Emirates Tel: +971 2 642 2576

Tel: +971 2 681 1061 Fax: +971 2 642 2579

Fax: +971 2 681 3655 E-mail: lwd@lindenberg.ae

E-mail: info@lindenberg.ae

48

Lindenberg Power Division

Projects Office, Passport Road, Abu Dhabi

(A Division of Lindenberg Emirates LLC) Tel: +971 2 642 2131, Fax: +971 2 642 2031

Tel: +971 2 642 2576 Legal Department, Salam St, Abu Dhabi

Fax: +971 2 642 2571 Tel: +971 2 672 2993, Fax: +971 2 6748455

E-mail: lpd@lindenberg.ae

Al Ain Office, Moujae Area, Al Ain

Tel: +971 3 755 8155, Fax: +971 3 755 8156

Website: www.lindenberg.ae

*Each Project has its own Site Office(s)


P.O. Box 42630, Abu Dhabi, United Arab Emirates

Tel: +971 2 6811061, Fax: +971 2 6813655

E-mail: info@lindenberg.ae

Website: www.lindenberg.ae

More magazines by this user
Similar magazines