27.01.2015 Views

RFP - Ontario Energy Board

RFP - Ontario Energy Board

RFP - Ontario Energy Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(b)<br />

Proposals must be submitted to the following address and to the attention of the<br />

following person:<br />

<strong>Ontario</strong> <strong>Energy</strong> <strong>Board</strong><br />

2300 Yonge Street<br />

27 th Floor<br />

Toronto, ON M4P 1E4<br />

Attention: Procurement Administrator<br />

4.3.2 Proposals Must Be Submitted On Time at Prescribed Location<br />

Proposals must be submitted at the location set out above on or before the Proposal<br />

Submission Deadline. Proposals submitted after this point in time will be deemed late,<br />

disqualified and returned to the proponent. For the purpose of calculating time, the <strong>Board</strong> clock<br />

at the prescribed location for submission shall govern.<br />

4.3.3 Proposal Irrevocable after Proposal Submission Deadline<br />

Proposals shall remain irrevocable in the form submitted by the proponent for a period of one<br />

hundred and twenty (120) days running from the moment that the Proposal Submission<br />

Deadline has lapsed.<br />

4.3.4 <strong>Board</strong> May Seek Clarification and Incorporate Response into Proposal<br />

The <strong>Board</strong> reserves the right to seek clarification and supplementary information relating to the<br />

clarification from proponents after the Proposal Submission Deadline. The response received by<br />

the <strong>Board</strong> from a proponent shall, if accepted by the <strong>Board</strong>, form an integral part of that<br />

proponent's proposal. The <strong>Board</strong> reserves the right to interview any or all proponents to obtain<br />

information about or clarification of their proposals. In the event that the <strong>Board</strong> receives<br />

information at any stage of the evaluation process which results in earlier information provided<br />

by the proponent being deemed by the <strong>Board</strong> to be inaccurate, incomplete or misleading, the<br />

<strong>Board</strong> reserves the right to revisit the proponents compliance with the Mandatory Requirements<br />

and/or adjust the scoring of Rated Criteria.<br />

4.3.5 <strong>RFP</strong> Incorporated into Proposal<br />

All of the provisions of this <strong>RFP</strong> are deemed to be accepted by each proponent and<br />

incorporated into each proponent's proposal.<br />

4.3.6 No Incorporation by Reference by Proponent<br />

The entire content of the proponent’s proposal should be submitted in a fixed form and the<br />

content of web sites or other external documents referred to in the proponent’s proposal will not<br />

be considered to form part of its proposal.<br />

4.3.7 Proposal Property of the <strong>Board</strong><br />

Except where expressly set out to the contrary in this <strong>RFP</strong> or in the proponent’s proposal, the<br />

proposal and any accompanying documentation submitted by a proponent shall become the<br />

property of the <strong>Board</strong> and shall not be returned.<br />

Page 12 of 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!