Appendix 1 Land Allocations Local Plan
Appendix 1 Land Allocations Local Plan
Appendix 1 Land Allocations Local Plan
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Dover District Council<br />
<strong>Land</strong> <strong>Allocations</strong> <strong>Local</strong> <strong>Plan</strong> Adopted 2015<br />
45<br />
3.106 Supplementary <strong>Plan</strong>ning Guidance has been adopted by the Council in 2003 for<br />
the redevelopment of this site and this will be used as a material consideration when<br />
determining planning applications www.dover.gov.uk/spg/Buckland-Mill-<strong>Plan</strong>ning-Brief.pdf.<br />
3.107 Approximately one third of the site has the benefit of full planning permission for a<br />
mixed use scheme, including up to 141 dwellings, A1 retail, a ‘community hub’ and B1 offices<br />
within the converted Buckland House. The scheme includes a series of public spaces and<br />
the formation of a new vehicle access to the north west of the mill building, from Crabble<br />
Hill. A landscaped ‘wetland’, located between the mill and river, provides ecological interest<br />
and flood storage. Development began in 2012 with the conversion of Buckland House and<br />
a new residential block to the east. Work has yet to begin on the main mill building.<br />
3.108 Early discussions should take place with Southern Water regarding the sewers that<br />
cross the site and these would need to be taken into account as part of any planning<br />
application.<br />
Proposed Development<br />
3.109 In terms of quality and design it is important that the development is laid out carefully<br />
to complement the landmark former mill building along Crabble Hill, and the Grade II Listed<br />
Buckland House and neighbouring St Andrew's Church. The site’s prominent location makes<br />
it appropriate to incorporate foreground buildings that do not detract from the views of the<br />
Church and Dover Castle. Residential development should be designed to maximise and<br />
take full advantage of the site's riverside location. Development should be designed to face<br />
the river but be set back to allow for the creation of a riverside walk and landscaping with<br />
public access. Overall, the site should create and restore the character of Dover (see<br />
Character Areas, paragraphs 3.21 to 3.23).<br />
3.110 The development will be open to views from Crabble Meadows and in order to<br />
increase overlooking it is important that development addresses and responds to this<br />
important public footway. The approach towards the public realm provision will be heavily<br />
shaped by the River and flood risk, as land raising and flood compensation and mitigation<br />
measures will be required. This needs consideration but should not compromise fundamental<br />
design issues. A Design Code should establish design parameters, and be submitted with<br />
any planning application, to guide the future phases of development. There is an opportunity<br />
to use tree planting to improve legibility and assist with the regeneration of the site.<br />
3.111 The layout will need to be designed so that it is not used as a through route for<br />
drivers wishing to avoid the traffic signals at the junction of London Road/Crabble Hill. The<br />
main access into the site should be from Crabble Hill. Opportunity must be made by the<br />
developer to provide for access to and from the site by cycle, foot and public transport. In<br />
particular, the creation of segregated cycle lane along the existing pedestrian footway/road<br />
and the creation of a pedestrian route alongside the River Dour. This route will connect to<br />
the River Dour Greenway, which provides a pleasant and quiet pedestrian and cycle route<br />
through Dover, between Buckland Bridge and the seafront. The site has the potential to<br />
accommodate up to a further 265 dwellings.