From: Subject: References Dear Bidders, N ATO UNC LA SSIF IE D ...
From: Subject: References Dear Bidders, N ATO UNC LA SSIF IE D ...
From: Subject: References Dear Bidders, N ATO UNC LA SSIF IE D ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />
Releasable to ISAF<br />
N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />
Releasable to ISAF<br />
5/104<br />
CO-13355-OPL<br />
Part IV Statement of Work<br />
Manager), including delivery, information assurance (e.g. security accreditation<br />
process), acceptance from the Contractor (through FAST, PSA and FSA) handover<br />
to the end-users during PSA, and handover to the service provisioning authority<br />
during FSA.<br />
1.4.1.2. Following the formal handover from NC3A:<br />
1.4.1.2.1. The CCTV HQ ISAF System users will act as the 1 st level maintenance echelon<br />
for the System, in theatre, supported by HQ ISAF BSG staff at HQ ISAF (2 nd<br />
level), and the Contractor (3 rd level, at the factory, or in theatre)<br />
1.4.1.2.2. Any support activities, beyond the first year following FSA, are to be covered<br />
under NAMSA’s O&M framework. NAMSA will act as Service Provisioning<br />
Authority (SPA) for the CCTV HQ ISAF System, in theatre.<br />
1.5.General requirement<br />
1.5.1. The Contractor shall complete the work in accordance with Book II Part I:<br />
Schedule of Supply and Services (SSS).<br />
1.5.2. The CCTV HQ System will be installed within the confines of the HQ ISAF<br />
compound. Proposed locations for the installations and the approximate<br />
dimensions of the HQ ISAF compound are provided, for information purposes,<br />
and can be found at the following Annexes:<br />
1.5.2.1. Annex A: Acronym List<br />
1.5.2.2. Annex B: Proposed camera location map HQ ISAF<br />
1.5.2.3. Annex C: Notional Equipment Configuration Diagram<br />
1.5.2.4. Annex D: Resilient IP network plan for CCTV<br />
1.5.2.5. Annex E: General Equipment Description<br />
1.5.2.6. Annex F: Approximate Dimensions of the HQ ISAF Compound<br />
1.5.2.7. Annex G: Poles Lighting Standards<br />
1.5.2.8. Annex H: Poles Painting Standards<br />
1.5.2.9. Annex I: System Requirements Specification<br />
1.5.3. The Contractor shall be responsible for:<br />
1.5.3.1. Procurement<br />
1.5.3.2. Shipment to HQ ISAF with the exception of the leg between CLD Brunssum and<br />
Depot 26, Afghanistan.