N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

CO-13355-OPL<br />

Part IV Statement of Work<br />

4.3.2.1. Change Requests Document (CRD)<br />

4.3.2.2. Off-specifications Document (OSD)<br />

4.3.3. The SDS shall adhere to the requirements listed in the System Requirements<br />

Specification SRS of Annex I, and include the following information:<br />

4.3.3.1. Functional breakdown of the CCTV HQ ISAF, based on the Functional<br />

Requirements listed in the SRS;<br />

4.3.3.2. Physical breakdown of the CCTV HQ ISAF into hardware, software and firmware<br />

Configuration Items (CI), following the Technical Requirements listed in the SRS.<br />

The breakdown shall include the number of licenses for each software CI, with<br />

traceability to the functional breakdown above;<br />

4.3.3.3. Identification of COTS versus any developmental items;<br />

4.3.3.4. Configuration Status Accounting (CSA) Reports, addressing all system CIs;<br />

4.3.3.5. Description of the interworking of all components to meet the system level<br />

requirements (physical interfaces between components, existing network<br />

infrastructure);<br />

4.3.3.6. Deployment and Operation principles of the CCTV HQ ISAF: overview of the<br />

new system and how the operators will make use of the provided functionality, and<br />

how administrators will be able to monitor and control the system.<br />

4.3.3.7. The Contractor shall provide a list of major components and civil works activities<br />

required to implement the technical solution, in order for the Purchaser to<br />

determine that the equipment and civil work activities are fit for purpose.<br />

4.4.Site Survey<br />

4.5. A site survey shall be performed within 4 weeks of the effective date of contract<br />

(EDC) to confirm assumptions and mitigate risk.<br />

4.5.1. The Contractor shall provide the Purchaser PM with an electronic copy of the Site<br />

Survey Report (SSR) within One (1) week of the completion of the survey.<br />

4.5.2. The SSR shall contain:<br />

4.5.2.1. Confirmation of the physical locations of the masts and any cable runs.<br />

4.5.2.2. Copies of signed agreements with local Site Authorities<br />

<br />

<br />

Approval from BSG Commander<br />

Approval from ISAF J6<br />

N<strong>ATO</strong> <strong>UNC</strong><strong>LA</strong><strong>SSIF</strong><strong>IE</strong>D<br />

Releasable to ISAF<br />

29/104