01.02.2015 Views

2010 Full Year Results Presentation - Antofagasta plc

2010 Full Year Results Presentation - Antofagasta plc

2010 Full Year Results Presentation - Antofagasta plc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Cash cost profile<br />

<strong>2010</strong> copper cost curve (Ranked<br />

(<br />

by C1)<br />

Realised copper price and cash cost<br />

400<br />

330<br />

327<br />

359<br />

300<br />

267<br />

271<br />

Cost (c/lb Paid Cu)<br />

200<br />

100<br />

0<br />

<strong>Antofagasta</strong><br />

Source: Brook Hunt, a Wood MacKenzie company<br />

- 2,000 4,000 6,000 8,000 10,000 12,000 14,000<br />

129<br />

137<br />

111<br />

120<br />

96<br />

87<br />

40<br />

32<br />

96<br />

104<br />

2006 2007 2008 2009 <strong>2010</strong><br />

-100<br />

Comulative Production ('000 tonnes)<br />

Realised copper price (c/lb) Pre-credit cash costs (c/lb) Cash Cost<br />

Cash cost by operation (c/lb<br />

lb)<br />

2009 <strong>2010</strong> 2011E<br />

Copper<br />

Los Pelambres 80.4 79.3 78.9<br />

Esperanza - - 40.6<br />

El Tesoro 123.4 169.2 160.7<br />

Michilla 157.6 183.8 197.6<br />

Group weighted average net of by-products<br />

96.3 104.0 88.1<br />

Group weighted average<br />

(before deducting by products)<br />

120.3 137.3 137.7<br />

30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!