rev 1 drawings

freeplotting.com

rev 1 drawings

MARK LOCATION SIZE (NOMINAL)

width x height x thickness

DOOR

MATERIAL

FRAME

MATERIAL

RATING

DOOR

TYPE

HDWARE

GROUP

DETAIL NUMBER

HEAD JAMB SILL

REMARKS / NOTES

T = GYMBOREE C = GENERAL CONTRACTOR L = LANDLORD E = EXISTING

FURNISH INSTALL REMARKS

STOCK/HALL/OFFICE T C L E T C L

GENERAL

FURNISH

T C L

E

INSTALL

T C L

REMARKS

CORPORATION

500 HOWARD STREET

SAN FRANCISCO, CALIFORNIA 94105

DOOR SCHEDULE

MARK FINNEMANN

'A'

GLASS ENTRY DOORS:

'C'

TOILET ROOM DOOR:

STOREFRONT T C L E T C L

B

A

INTERIOR DOOR

DOOR TYPES

ENTRY DOORS

KEY MATERIAL

C

'B' SALES / HALLWAY DOOR:

REAR SERVICE

HARDWARE GROUPS

MANUFACTURER DESCRIPTION

'D' SERVICE DOOR (G.C. TO VERIFY CONDITION OF EXISTING

HARDWARE AND SUPPLEMENT AS REQUIRED):

HARDWARE NOTES

LOCATION / NOTES

TOILET ROOM

HVAC

T

T

C

C

L

L

E

E

T

T

C

C

SEE SHEET

M3.1

L

L

SALES AREA T C L

E

T

C

L

6270

CRAZY 8

ARBOR PLACE

SPACE #2110b

6700 DOUGLAS BLVD. SUITE 2110b

DOUGLASVILLE, GA 30135

G6270 ALO / CYK / MWH DRM / MCF

PLUMBING T C L E T C L

SEE SHEET

M3.1

ELECTRICAL

T C L E T C L

SEE SHEET

E5.0

RESPONSIBILITY SCHEDULE

RESPONSIBILITY SCHEDULE CONTINUED

VENDOR CATEGORY

COMPANY

NOTES

&

SCHEDULES

FINISH SCHEDULE

PAINT SPEC NOTES

VENDOR LIST

A0.1


ADJACENT TENANT (N.I.C.)

CORPORATION

500 HOWARD STREET

SAN FRANCISCO, CALIFORNIA 94105

MARK FINNEMANN

REAR SERVICE CORRIDOR (N.I.C.)

(E) SALES AREA

FOR REMOVAL/ RELOCATION OF

HVAC EQUIPMENT, DUCTWORK,

ELECTRICAL AND PLUMBING

LINES. SEE MECHANICAL &

ELECTRICAL SPECIFICATION

SECTIONS 15009 AND 16009

RESPECTIVELY. COORDINATE

WITH LANDLORD.

DEMO SUB-CONTRACTOR IS

RESPONSIBLE FOR VISITING SITE

FOR VISUAL INSPECTION PRIOR

TO A BID.

24

MALL COMMON AREA (N.I.C.)

6270

CRAZY 8

ARBOR PLACE

SPACE #2110b

6700 DOUGLAS BLVD. SUITE 2110b

DOUGLASVILLE, GA 30135

G6270 ALO / CYK / MWH DRM / MCF

K J H

N

ADJACENT TENANT (N.I.C.)

DEMOLITION PLAN

1/4"=1'-0"

-

1

DEMOLITION PLAN KEYNOTES (CONTINUED)

SHEET NOTES

LANDLORD'S PLAN REVIEW COMMENTS

DEMOLITION

PLAN

EXISTING HEIGHTS

DEMOLITION PLAN KEYNOTES

DEMOLITION LEGEND

DEMOLITION NOTES

A1.1


ADJACENT TENANT (N.I.C.)

CORPORATION

500 HOWARD STREET

SAN FRANCISCO, CALIFORNIA 94105

MARK FINNEMANN

REAR SERVICE CORRIDOR (N.I.C.)

24

MALL COMMON AREA (N.I.C.)

6270

CRAZY 8

ARBOR PLACE

SPACE #2110b

6700 DOUGLAS BLVD. SUITE 2110b

DOUGLASVILLE, GA 30135

G6270 ALO / CYK / MWH DRM / MCF

K J H

N

ADJACENT TENANT (N.I.C.)

FLOOR PLAN

1/4"=1'-0"

-

1

FLOOR PLAN

FLOOR PLAN KEYNOTES

PARTITION LEGEND

A2.1


ADJACENT TENANT (N.I.C.)

CORPORATION

500 HOWARD STREET

SAN FRANCISCO, CALIFORNIA 94105

MARK FINNEMANN

REAR SERVICE CORRIDOR (N.I.C.)

24

MALL COMMON AREA (N.I.C.)

6270

CRAZY 8

ARBOR PLACE

SPACE #2110b

6700 DOUGLAS BLVD. SUITE 2110b

DOUGLASVILLE, GA 30135

G6270 ALO / CYK / MWH DRM / MCF

K J H

N

REFLECTED CEILING PLAN

ADJACENT TENANT (N.I.C.)

1/4"=1'-0"

-

1

REFLECTED

CEILING PLAN

SHEET NOTES

REFLECTED CEILING PLAN KEYNOTES

REFLECTED CEILING PLAN LEGEND

A3.1


CORPORATION

500 HOWARD STREET

SAN FRANCISCO, CALIFORNIA 94105

MARK FINNEMANN

CRAZY 8

ARBOR PLACE

SPACE #2110b

6700 DOUGLAS BLVD. SUITE 2110b

DOUGLASVILLE, GA 30135

6270

G6270 ALO / CYK / MWH DRM / MCF

B

A

STOREFRONT ELEVATION

1/2"=1'/0"

-

2

STOREFRONT

PLAN &

ELEVATION

STOREFRONT PLAN

1/2"=1'-0"

-

1

A5.1


CORPORATION

500 HOWARD STREET

SAN FRANCISCO, CALIFORNIA 94105

MARK FINNEMANN

STOREFRONT BASE DETAIL

3"=1'-0"

-

12

ENTRY COLUMN DETAIL

1 1/2"=1'-0"

-

9

ENTRY COLUMN DETAIL

1 1/2"=1'-0"

-

6

COLUMN HEADER DETAIL

3"=1'-0"

-

3

6270

CRAZY 8

ARBOR PLACE

SPACE #2110b

6700 DOUGLAS BLVD. SUITE 2110b

DOUGLASVILLE, GA 30135

G6270 ALO / CYK / MWH DRM / MCF

STOREFRONT DETAIL

1 1/2"=1'-0"

-

11

DISPLAY PLATFORM DETAIL

1 1/2"=1'-0"

-

8

NEUTRAL PIER DETAIL

1 1/2"=1'-0"

-

5

TYP. GLAZING CHANNEL @ HEAD

3"=1'-0"

-

2

STOREFRONT

DETAILS

FLOOR TRANSITION DETAIL AT ENTRY

6"=1'-0"

1 1/2"=1'-0"

1 1/2"=1'-0"

-

10 ENTRY COLUMN DETAIL

-

7 NEUTRAL PIER DETAIL

BASE DETAIL AT DISPLAY PLATFORM 3"=1'-0"

-

4

-

1

A5.3


ADDENDUM # 1

December 28, 2011

CRAZY 8

Arbor Place

Douglasville, GA

Project #6270

MARK C. FINNEMANN

ARCHITECT

2145 Ford Parkway Suite 301

St. Paul, MN 55116

Tel: (651) 690-5525

Fax: (651) 690-5545

The following revision and clarification amend the construction documents issued for bid. Please notify all plan

holders and incorporate the Bulletin item in to your construction documents. This Bulletin forms a part of the

Contract Documents and modifies the original Specifications, Plans and Detail Drawings. This is your authorization

to make changes in the work as indicated on the enclosed revised drawings. If costs are involved, whether credits

or charges, such shall be computed and forwarded to the Gymboree Project Manager for approval prior to effecting

the change. If there are any questions regarding these changes please contact Mark Finnemann Architect.

Ph. 651-690-5525

Item # Description

1 Sheet A0.1 – Revise responsibility and remarks of Bulkhead in Storefront Section of

Responsibility Schedule Continued section

2 Sheet A1.1 – Revise coded notes near right and left side of storefront in Demolition Plan

1/A1.1

3 Sheet A1.1 – Add note #’s 16, 17, and 18 to Demolition Plan Keynotes (Continued) section

4 Sheet A1.1 – Add Landlord’s Plan Review Comments section to plans

5 Sheet A2.1 – Add keynote #25 near left side of storefront in Floor Plan 1/A2.1

6 Sheet A2.1 – Revise note # 25 in Floor Plan Keynotes section

7 Sheet A3.1 – Revise number of and location of return air diffusers in Reflected Ceiling Plan

1/A3.1

8 Sheet A3.1 – Revise location of track lighting along rear sales area wall in Reflected Ceiling

Plan 1/A3.1

9 Sheet A5.1 – Add boxed note to Storefront Plan 1/A5.1

10 Sheet A5.1 – Add notes revise note and add note to right side of storefront on Storefront

Plan 1/A5.1

11 Sheet A5.1 – Add note to left side of storefront on Storefront Plan 1/A5.1

12 Sheet A5.1 – Add grout line and add duplex to lower right side of storefront on Storefront

Elevation 2/A5.1

13 Sheet A5.1 – Add grout line to lower left side of storefront on Storefront Elevation 2/A5.1

14 Sheet A5.1 – Add notes to upper left and right of storefront on Storefront Elevation 2/A5.1

15 Sheet A5.3 – Revise and add note to Neutral Pier Detail 4/A5.3

16 Sheet A5.3 – Add note to Neutral Pier Detail 5/A5.3

17 Sheet E1.0 – Remove VAV boxes from Power Plan 1/E1.0

18 Sheet E1.0 – Add RTU to power Plan 1/E1.0

19 Sheet E1.0 – Revise electrical at storefront in Power Plan 1/E1.0

20 Sheet E1.0 – Add electrical near manager’s desk in Power Plan 1/E1.0

21 Sheet E1.0 – Add Landlord’s Plan Review Comments section to Power Plan 1/E1.0

22 Sheet E1.1 – Revise note #’s 18 and 19 in Power Coded Notes section

23 Sheet E1.1 – Add note # 20 to Power Coded Notes section

24 Sheet E2.0 – Revise location of rear sales area wall track lighting in Lighting Plan 1/E2.0

25 Sheet E4.0 – Revise Exist L panel schedule

26 Sheet E4.0 – Revise Exist H panel schedule

27 Sheet E4.0 – Revise Exist P panel schedule

28 Sheet E5.0 – Revise item 1 of subsection E of Section 16202 – Materials specification


29 Sheet E5.0 – Revise Electrical Responsibility Schedule

30 Sheet M1.0 – Revise entire Mechanical Plan 1/M1.0

31 Sheet M1.0 – Add Landlord Plan Review Comments section to Mechanical Plan 1/M1.0

32 Sheet M1.0 – Revise note #’s 1, 2, 6, 7, 8, 13, and 14 in Mechanical Coded Notes section

33 Sheet M1.0 – Add note # 16 to Mechanical Coded Notes section

34 Sheet M2.0 – Add Landlord’s Plan Review Comment to Fire Damper Detail 3/M2.0

35 Sheet M2.0 – Revise entire detail including title 4/M2.0

36 Sheet M2.0 – Add Rooftop Heat Pump Unit Detail 6/M2.0 to sheet

37 Sheet M2.0 – Add RG-3 to detail 7/M2.0

38 Sheet M2.0 – Revise HVAC Equipment Schedule 9/M2.0

39 Sheet M2.0 – Add Condensate Drain P-Trap Detail 10/M2.0 to sheet

40 Sheet M2.1 – Add Landlord’s Plan Review Comments 8/M2.1 to sheet

41 Sheet M3.0 – Revise item 1 under subsection A of Section 15501 – Summary of Work

specification

42 Sheet M3.1 – Revise HVAC Responsibility Schedule

General Contractor to forward this addendum in a timely fashion to the Job Superintendent and all sub-contractors

as necessary that are not listed above so as not to delay construction.

END OF ADDENDUM