12.03.2015 Views

PEST RISK ANALYSIS (PRA) TRAINING Group Exercises Manual

PEST RISK ANALYSIS (PRA) TRAINING Group Exercises Manual

PEST RISK ANALYSIS (PRA) TRAINING Group Exercises Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GROUP EXERCISE NO. 3.6<br />

<strong>PEST</strong> <strong>RISK</strong> <strong>ANALYSIS</strong> <strong>TRAINING</strong> - GROUP EXERCISES MANUAL<br />

The conclusion of the pest risk management stage will be either that no measures are<br />

identified which are appropriate to address the identified pest risk, or that one or<br />

more management options (or series of options) is appropriate to lower the pest risk<br />

to an acceptable level.<br />

Based on your information from the table above, identify two equivalent measures (or<br />

series of measures) which are appropriate to mitigate the pest risk identified in this<br />

scenario. These measures will form the basis of future phytosanitary regulations or<br />

requirements.<br />

Effective<br />

Option A Option B Option C<br />

Feasible<br />

Efficient<br />

Conclusion<br />

Points for Discussion:<br />

• What criteria did you consider in evaluating each option or in selecting<br />

preferred options?<br />

• What principles of the IPPC should be remembered during the pest risk<br />

management stage?<br />

• What are the most challenging aspects of the pest risk management stage?<br />

• What are some things that an NPPO could do to make this stage of the <strong>PRA</strong><br />

easier?<br />

46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!