- Page 1: Environment Report Casino Gas Field
- Page 6 and 7: Executive Summary TXU WUGS facility
- Page 8 and 9: Executive Summary ment from the Cas
- Page 10 and 11: Executive Summary 9 8 N Casino offs
- Page 12 and 13: Executive Summary 668 000 670 000 6
- Page 14 and 15: Executive Summary Alignment of the
- Page 16 and 17: Executive Summary Table 1 Environme
- Page 18 and 19: Executive Summary Table 1 Environme
- Page 20 and 21: Executive Summary xx Casino Gas Fie
- Page 22 and 23: Contents 4.3.4 Commercial Benefits
- Page 24 and 25: Contents 6.15.1 Existing Environmen
- Page 26 and 27: Contents 6.3 Locations of commercia
- Page 28 and 29: Contents xxviii Casino Gas Field De
- Page 30 and 31: 1. Introduction 640 000 650 000 660
- Page 32 and 33: 1. Introduction • Provision of an
- Page 34 and 35: 2. Regulatory Framework • Commonw
- Page 36 and 37: 2. Regulatory Framework Santos has
- Page 38 and 39: 2. Regulatory Framework 10 Casino G
- Page 40 and 41: 3. Stakeholder Consultation Table 3
- Page 42 and 43: 3. Stakeholder Consultation This re
- Page 44 and 45: 4. Project Rationale ability to sto
- Page 46 and 47: 4. Project Rationale mary energy so
- Page 48 and 49: 5. Project Description network. A n
- Page 50 and 51: 5. Project Description 640 000 650
- Page 52 and 53:
5. Project Description Proposed Otw
- Page 54 and 55:
5. Project Description Table 5.3 As
- Page 56 and 57:
5. Project Description 668 000 670
- Page 58 and 59:
5. Project Description and hydrauli
- Page 60 and 61:
5. Project Description with a ‘pu
- Page 62 and 63:
5. Project Description HDD Profile
- Page 64 and 65:
5. Project Description Restoration
- Page 66 and 67:
5. Project Description Enesar Court
- Page 68 and 69:
5. Project Description move weld de
- Page 70 and 71:
5. Project Description tion contrac
- Page 72 and 73:
5. Project Description corrosion in
- Page 74 and 75:
6. Impact Assessment 10.3 m (WNI, 2
- Page 76 and 77:
6. Impact Assessment 9 8 Flaxman's
- Page 78 and 79:
6. Impact Assessment 640 000 650 00
- Page 80 and 81:
6. Impact Assessment Drill Fluid an
- Page 82 and 83:
6. Impact Assessment coated or thic
- Page 84 and 85:
6. Impact Assessment mammals such a
- Page 86 and 87:
6. Impact Assessment noise were red
- Page 88 and 89:
6. Impact Assessment Physiological
- Page 90 and 91:
6. Impact Assessment SIV, 2003). Ke
- Page 92 and 93:
6. Impact Assessment the proposed s
- Page 94 and 95:
6. Impact Assessment Table 6.4 Geol
- Page 96 and 97:
6. Impact Assessment • Route plan
- Page 98 and 99:
6. Impact Assessment Project, Santo
- Page 100 and 101:
6. Impact Assessment 668000 670000
- Page 102 and 103:
6. Impact Assessment 670000 672000
- Page 104 and 105:
6. Impact Assessment 668000 670000
- Page 106 and 107:
6. Impact Assessment Park and Loch
- Page 108 and 109:
6. Impact Assessment side native ve
- Page 110 and 111:
6. Impact Assessment Curdie Vale -
- Page 112 and 113:
6. Impact Assessment Habitat Loss.
- Page 114 and 115:
6. Impact Assessment Table 6.9 Pote
- Page 116 and 117:
6. Impact Assessment 6.9.5 Residual
- Page 118 and 119:
o 6. Impact Assessment 630000 65000
- Page 120 and 121:
6. Impact Assessment Electricity. P
- Page 122 and 123:
6. Impact Assessment will be requir
- Page 124 and 125:
6. Impact Assessment requirements.
- Page 126 and 127:
6. Impact Assessment of the project
- Page 128 and 129:
6. Impact Assessment 6.13.2 Potenti
- Page 130 and 131:
6. Impact Assessment will be contra
- Page 132 and 133:
6. Impact Assessment dicted noise l
- Page 134 and 135:
6. Impact Assessment occupants of R
- Page 136 and 137:
6. Impact Assessment • Minimising
- Page 138 and 139:
6. Impact Assessment - Pipeline mon
- Page 140 and 141:
7. Environmental Management Framewo
- Page 142 and 143:
7. Environmental Management Framewo
- Page 144 and 145:
7. Environmental Management Framewo
- Page 146 and 147:
8. References CSC. 2004c. Industry.
- Page 148 and 149:
8. References Force on Marine Prote
- Page 150 and 151:
9. Glossary laydown area: sites at
- Page 153 and 154:
Appendix 1 Appendix 1 - Terrestrial
- Page 155 and 156:
Appendix 1 List of flora species th
- Page 157 and 158:
Appendix 1 Status List of flora spe
- Page 159 and 160:
Appendix 1 List of fauna species th
- Page 161 and 162:
Appendix 1 List of fauna species th
- Page 163:
Appendix 2 Santos Environment, Heal
- Page 166 and 167:
INTRODUCTION Introduction Message f
- Page 168 and 169:
2 > FRAMEWORK EHSMS Framework The S
- Page 170 and 171:
4 > MANAGEMENT STANDARDS EHSMS 01 |
- Page 172 and 173:
6 > MANAGEMENT STANDARDS EHSMS 05 M
- Page 174 and 175:
8 > MANAGEMENT STANDARDS EHSMS 07 M
- Page 176 and 177:
unless otherwise stated, be based o
- Page 178 and 179:
12 > MANAGEMENT STANDARDS EHSMS 10
- Page 180 and 181:
14 > MANAGEMENT STANDARDS EHSMS 12
- Page 182 and 183:
16 > MANAGEMENT STANDARDS EHSMS 12
- Page 184 and 185:
18 > MANAGEMENT STANDARDS EHSMS 14
- Page 186 and 187:
20 > MANAGEMENT STANDARDS EHSMS 16
- Page 188 and 189:
22 > HAZARD STANDARDS Hazard Standa
- Page 190 and 191:
24 > GLOSSARY Glossary EHSMS Perfor
- Page 192:
Santos Head Office Santos House 91