3. Stakeholder Consultation<br />
Table 3.1<br />
Key stakeholders (cont’d)<br />
Stakeholder<br />
Category<br />
Government<br />
technical<br />
advisory/land<br />
management<br />
agencies (cont’d)<br />
Infrastructure and<br />
utilities<br />
Moyne Shire Council<br />
Western Coastal Board<br />
Department of Human Services<br />
Organisation/Agency/Role<br />
Department of Victorian Communities - Aboriginal Affairs<br />
Victoria<br />
Department of Industry Innovation and Regional Development<br />
WorkSafe<br />
Country Fire Authority<br />
BHP Billiton<br />
TXU<br />
Woodside Energy Limited<br />
Corangamite Shire Council<br />
GasNet<br />
Optus<br />
Southern Rural Water<br />
Telstra<br />
Key Issues Raised<br />
Construction traffic<br />
Condensate transport<br />
TXU WUGS facility upgrades<br />
HDD water resources<br />
Impacts on archaeological sites<br />
VicRoads<br />
Media Cobden Times General interest<br />
Warrnambool Standard<br />
Camperdown Herald<br />
Colac Herald<br />
Proximity to existing infrastructure<br />
Construction timing (potential for simultaneous<br />
construction of pipelines and shore crossing with<br />
Woodside)<br />
Reinstatement<br />
Table 3.2<br />
Communication<br />
Activity<br />
Casino Gas Field Development consultation summary<br />
Subject<br />
Date<br />
Media release Casino gas sales agreement with TXU September 2003<br />
Media release Casino 3 appraisal drilling successful November 2003<br />
Invitation for public<br />
comment<br />
Stakeholder briefings<br />
Mail-out<br />
Landholder liaison<br />
EPBC referral lodged on DEH website<br />
for public comment<br />
Project development inception<br />
briefings to key stakeholders<br />
Notification to commercial fishers of<br />
timing of planned bathymetry survey<br />
Initial briefings to landholders – access<br />
consent requested<br />
November 2003<br />
December 2003<br />
December 2003<br />
January 2004<br />
Landholder liaison Pipeline route options February 2004<br />
Media release<br />
Invitation for public<br />
comment<br />
Media briefings<br />
Casino front-end engineering and<br />
design contract awarded<br />
EPBC Preliminary Document lodged<br />
on DEH website and advertised for<br />
public comment<br />
Project briefings to regional Victoria<br />
media<br />
February 2004<br />
March 2004<br />
March 2004<br />
Landholder liaison Pipeline route survey April 2004<br />
Landholder liaison Easement compensation negotiations May 2004<br />
Mail-out<br />
Invitation for public<br />
comment<br />
Notification to landholders of Pipeline<br />
Permit application<br />
Pipeline Permit application and<br />
<strong>Environment</strong> <strong>Report</strong> (this document)<br />
May 2004<br />
May–June 2004<br />
– Project information displays at regional<br />
and metropolitan centres.<br />
• Project information telephone number<br />
– to provide the opportunity for stakeholder<br />
input.<br />
Site inspections of the project area were<br />
conducted as required to support an increased<br />
understanding of the development<br />
proposal and the on-ground<br />
technical issues.<br />
Table 3.2 lists the communication activities<br />
undertaken specifically in relation to<br />
the development of the Casino gas field<br />
at the time of preparing this <strong>Environment</strong><br />
<strong>Report</strong>. Further consultation is planned<br />
for the detailed design, construction and<br />
operation phases, including the timely<br />
dissemination of project information (e.g.,<br />
brochures) to stakeholders.<br />
3.3 Consultation Records<br />
A project specific stakeholder database<br />
has been established for the Casino Gas<br />
Field Development to record the contact<br />
details of relevant stakeholders and to<br />
document consultation undertaken and<br />
the relevant outcomes, such as commitments<br />
and requirements for the construction<br />
phase.<br />