3. Stakeholder Consultation<br />

Table 3.1<br />

Key stakeholders (cont’d)<br />

Stakeholder<br />

Category<br />

Government<br />

technical<br />

advisory/land<br />

management<br />

agencies (cont’d)<br />

Infrastructure and<br />

utilities<br />

Moyne Shire Council<br />

Western Coastal Board<br />

Department of Human Services<br />

Organisation/Agency/Role<br />

Department of Victorian Communities - Aboriginal Affairs<br />

Victoria<br />

Department of Industry Innovation and Regional Development<br />

WorkSafe<br />

Country Fire Authority<br />

BHP Billiton<br />

TXU<br />

Woodside Energy Limited<br />

Corangamite Shire Council<br />

GasNet<br />

Optus<br />

Southern Rural Water<br />

Telstra<br />

Key Issues Raised<br />

Construction traffic<br />

Condensate transport<br />

TXU WUGS facility upgrades<br />

HDD water resources<br />

Impacts on archaeological sites<br />

VicRoads<br />

Media Cobden Times General interest<br />

Warrnambool Standard<br />

Camperdown Herald<br />

Colac Herald<br />

Proximity to existing infrastructure<br />

Construction timing (potential for simultaneous<br />

construction of pipelines and shore crossing with<br />

Woodside)<br />

Reinstatement<br />

Table 3.2<br />

Communication<br />

Activity<br />

Casino Gas Field Development consultation summary<br />

Subject<br />

Date<br />

Media release Casino gas sales agreement with TXU September 2003<br />

Media release Casino 3 appraisal drilling successful November 2003<br />

Invitation for public<br />

comment<br />

Stakeholder briefings<br />

Mail-out<br />

Landholder liaison<br />

EPBC referral lodged on DEH website<br />

for public comment<br />

Project development inception<br />

briefings to key stakeholders<br />

Notification to commercial fishers of<br />

timing of planned bathymetry survey<br />

Initial briefings to landholders – access<br />

consent requested<br />

November 2003<br />

December 2003<br />

December 2003<br />

January 2004<br />

Landholder liaison Pipeline route options February 2004<br />

Media release<br />

Invitation for public<br />

comment<br />

Media briefings<br />

Casino front-end engineering and<br />

design contract awarded<br />

EPBC Preliminary Document lodged<br />

on DEH website and advertised for<br />

public comment<br />

Project briefings to regional Victoria<br />

media<br />

February 2004<br />

March 2004<br />

March 2004<br />

Landholder liaison Pipeline route survey April 2004<br />

Landholder liaison Easement compensation negotiations May 2004<br />

Mail-out<br />

Invitation for public<br />

comment<br />

Notification to landholders of Pipeline<br />

Permit application<br />

Pipeline Permit application and<br />

<strong>Environment</strong> <strong>Report</strong> (this document)<br />

May 2004<br />

May–June 2004<br />

– Project information displays at regional<br />

and metropolitan centres.<br />

• Project information telephone number<br />

– to provide the opportunity for stakeholder<br />

input.<br />

Site inspections of the project area were<br />

conducted as required to support an increased<br />

understanding of the development<br />

proposal and the on-ground<br />

technical issues.<br />

Table 3.2 lists the communication activities<br />

undertaken specifically in relation to<br />

the development of the Casino gas field<br />

at the time of preparing this <strong>Environment</strong><br />

<strong>Report</strong>. Further consultation is planned<br />

for the detailed design, construction and<br />

operation phases, including the timely<br />

dissemination of project information (e.g.,<br />

brochures) to stakeholders.<br />

3.3 Consultation Records<br />

A project specific stakeholder database<br />

has been established for the Casino Gas<br />

Field Development to record the contact<br />

details of relevant stakeholders and to<br />

document consultation undertaken and<br />

the relevant outcomes, such as commitments<br />

and requirements for the construction<br />

phase.<br />

Casino Gas Field Development 13