22.03.2015 Views

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Removal and replacement of ADU modules<br />

9.5.7.11 Removing the Polarisation Encoder<br />

To remove the Polarisation Encoder, do as follows:<br />

Tools needed:<br />

• 4 x 150 mm Allen key<br />

(located inside the<br />

service door of the ADU)<br />

• Flat head screw driver<br />

1. Follow the instructions in Removing the Polarisation Unit on<br />

page 9-73.<br />

2. Disconnect the 6-pin connector (with the colored wires) from the<br />

PMM, marked ORE, and free the cable to the Polarisation<br />

Encoder.<br />

ORE ZRM OMT<br />

Figure 9-67: Removing the sub-D connector of the PMM<br />

3. Loosen the 2x4 mm Allen screws and rotate the Polarisation<br />

Encoder in the key holes.<br />

4. Free the Polarisation Encoder from the cable holders.<br />

5. Remove the Polarisation Encoder.<br />

Figure 9-68: Polarisation Encoder, removing<br />

9.5.7.12 Inserting a new Polarisation Encoder<br />

To insert a new Polarisation Motor follow the instructions above in<br />

reverse order.<br />

9-54 Chapter 9: <strong>Service</strong> & maintenance 98-133966-E2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!