3.3.1 Installing the ADU<br />

Make sure that there is sufficient space underneath the ADU to open<br />

the service hatch. Through this hatch you access the ADU modules<br />

for service and maintenance.<br />

Provide sufficient free space<br />

for access through<br />

the service hatch.<br />

<strong>Installation</strong> of the ADU<br />

3333<br />

<strong>Installation</strong><br />

Figure 3-15: Free space for access to the service hatch<br />

The ADU does not have to be aligned with the bow-to-stern line of<br />

the ship. When configuring the SAILOR 900 VSAT you make an<br />

azimuth calibration to obtain the correct azimuth of the ADU.<br />

• It is important to maintain vertical orientation of the ADU center<br />

line.<br />

• Consider the aspect of interference, read more about this in ADU<br />

mast design: Foundation and height on page 3-8.<br />

• Install the ADU where vibrations are limited to a minimum.<br />

• Always use all 4 bolts when installing the ADU.<br />

To install the ADU, do as follows:<br />

1. Install the mast with the mast flange and have the 4 M12 bolts<br />

ready.<br />

2. Undo all shipping buckles, take off the wooden top and remove<br />

the casing.<br />

3. Unscrew the 4 bolts holding the ADU on the wooden platform.<br />

98-133966-E2 Chapter 3: <strong>Installation</strong> 3-19