For more information about power supply and power requirements<br />

see Connecting power on page 5-1.<br />

3.4.2 Grounding the ACU (bulkhead)<br />

Make sure that the grounding requirements are met. This is<br />

important to protect the ACU against lightning. See the appendix<br />

Grounding and RF protection on page F-1 for details about<br />

grounding.<br />

<strong>Installation</strong> of the ACU (bulkhead)<br />

3333<br />

3.4.2.1 ADU cable<br />

The ADU is connected to the ACU with the ADU cable (coax cable)<br />

with an N connector at both ends. For information on ADU<br />

grounding, see Grounding the ADU on page 3-23.<br />

At the ACU end, it is strongly recommended to ground the ADU<br />

cable. Use a short cable from the ACU to a grounding point and<br />

connect the short cable to the ADU cable at this grounding point,<br />

making sure the shield of the connector is properly connected.<br />

<strong>Installation</strong><br />

3.4.2.2 Ground stud<br />

To ensure that the ACU is grounded – also if the cable is<br />

disconnected from the ACU, connect an extra ground wire to the<br />

ground stud on the ACU. This ground wire must be a heavy wire or<br />

braid cable with a larger diameter than the coax cable (minimum<br />

cross section: 4 mm 2 ).<br />

Ground stud<br />

Figure 3-25: SAILOR 900 VSAT ACU, bulkhead version, ground stud<br />

98-133966-E2 Chapter 3: <strong>Installation</strong> 3-27