25.03.2015 Views

revised final closure plan - Salinas Valley Solid Waste Authority

revised final closure plan - Salinas Valley Solid Waste Authority

revised final closure plan - Salinas Valley Solid Waste Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Revised Final Closure Plan July 2010<br />

Crazy Horse Sanitary Landfill -3- 103-97133<br />

2. Allows the SVSWA to prepare an estimate of <strong>closure</strong> and post<strong>closure</strong> maintenance<br />

costs for the landfill.<br />

3. Enables the LEA, CIWMB and RWQCB to assess the reasonableness of the cost<br />

estimate.<br />

Section 2 of this report presents the <strong>final</strong> <strong>closure</strong> <strong>plan</strong> for the landfill, which identifies and describes<br />

tasks involved in closing the landfill in a manner consistent with applicable regulations and<br />

acceptable standards to protect public health and safety, and the environment. The contents of this<br />

<strong>final</strong> <strong>closure</strong> <strong>plan</strong> are consistent with the requirements of 27 CCR 21769 and 21800, and other<br />

applicable sections of Title 27.<br />

Site monitoring and maintenance information and descriptions of tasks for implementing the<br />

post<strong>closure</strong> maintenance activities are provided separately in the Revised Final Post-Closure<br />

Maintenance Plan (RFPCMP). The <strong>closure</strong> cost estimates consistent with the requirements of 27 CCR<br />

21820 are presented in Section 3.<br />

Golder Associates

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!