JSF Program Status Update

atlanticalliance.ca

JSF Program Status Update

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

F-35 Lightning II

Keith P. Knotts

F-35 Business Development

Australia and Canada

© 2011 Lockheed Martin Aeronautics Company

Israeli Media 110311 - 1


DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

U.S. Fighter Force

Procurement Quantities

© 2011 Lockheed Martin Aeronautics Company Israeli Media 110311 - 1


DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Value Proposition

An Effective Coalition

Economies of Scale

DoN, 680

USAF, 1,763

International,

700

FMS, 800

Lower Life-Cycle Costs

Counters Current and

Future Threats

© 2011 Lockheed Martin Aeronautics Company

Israeli Media 110311 - 1


DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

F-35 Master Schedule

CY 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

System

Development

and

Demonstration

CATB

STOVL CTOL

First Flights

DT Flight Test

CV

CTOL

STOVL

CV

Low-Rate

Initial

Production

and

Multiyear

Procurement

LRIP 1 (2)

LRIP 2 (12)

LRIP 3 (17)

LRIP 4 (32)

LL LRIP 5 (35 )

LL LRIP 6 (38)

LRIP 7 (70)

LRIP 8 (110)

LRIP 9 (154)

LRIP 10 (194)

Planned Production

LRIP 11 (218)

• Air Force 1,763 CTOL

• Dept of Navy 680 CV/STOVL

MY 1

• International 800-1,500

© 2011 Lockheed Martin Aeronautics Company ACOA Conference 120811- 4


DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

Production/Operations Ramping Up

117 Aircraft Delivered/On Order

SDD (19 A/C)

LRIP 1 (2 A/C)

LRIP 2 (12 A/C)

In Assembly

Rolled Out

As of 5 Dec 2011

LRIP 3 (17 A/C)

LRIP 4 (32 A/C)

LRIP 5 (35 A/C)

38 Aircraft in Ground Test

and Flight Ops

SDD (18 A/C)

LRIP 1 (2 A/C)

LRIP 2 (12 A/C)

LRIP 3 (8 A/C)

Production Tracking To Plan

In Ground and

Flight Test

© 2011 Lockheed Martin Aeronautics Company ACOA Conference 120811- 5


DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

© 2011 Lockheed Martin Martin Aeronautics Company Company

ACOA Conference 120811- 6


DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

F-35 Flight Test Progress

1000

900

800

700

600

500

400

300

200

100

0

2011 Cumulative Flights

Cum Plan

As of 3 Dec Against EOM Plan

Cum Actual

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Flights

• CTOL – 445, CV – 159, STOVL – 313

8000

7000

6000

5000

4000

3000

2000

1000

0

Test Points

• CTOL – 3,278, CV – 1,582, STOVL – 2,343

2011 Cumulative Test Points

As of 3 Dec Against EOM Plan

Fleet Plan

Fleet Actual

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Flight Test Ahead of 2011 Plan

© 2011 Lockheed Martin Aeronautics Company ACOA Conference 120811- 7


DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

STOVL Landing on the WASP

© 2011 Lockheed Martin Aeronautics Company ACOA Conference 120811- 8


DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

F-35 Builds Coalition Interoperability

Australia

(100)

Canada

(65)

United States

(2,443)

United

Kingdom

(135 CV)

(3 STOVL)

Netherlands

(85)

Turkey

(100)

Denmark

(30)

Italy

(69 CTOL

62 STOVL)

Norway

(48)

Israel

Singapore

Japan

Korea

Spain

© 2011 Lockheed Martin Aeronautics Company ACOA Conference 120811- 9


DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.

© 2011 Lockheed Martin Aeronautics Company ACOA Conference 120811- 10

More magazines by this user
Similar magazines