05.04.2015 Views

2010 Metro Mitigation Plan

2010 Metro Mitigation Plan

2010 Metro Mitigation Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. MWS has prioritized Capital Improvement Projects as outlined in the multiple<br />

Stormwater Basin <strong>Plan</strong>s;<br />

5. MWS has prioritized watersheds throughout the County for preparing/updating Basin<br />

<strong>Plan</strong>s;<br />

6. The IRC Building Codes contain seismic and design wind elements;<br />

7. Residential plan reviews are performed on complex designs;<br />

8. The NPDES water quality requirements may offer an opportunity to coordinate flood<br />

warning capabilities and stream gauging;<br />

9. OEM has recently updated the severe weather warning siren capabilities of the<br />

community with 71 sirens;<br />

10. Public information could be made available to inform residents about the risks of<br />

hazards (earthquakes, floods, and tornadoes, predominantly) and appropriate risk<br />

reduction actions that they can undertake; and<br />

11. <strong>Metro</strong> does not support flood protection and retrofitting as standard solutions for<br />

residential flooding problems.<br />

<strong>Metro</strong>politan Nashville - Davidson County<br />

<strong>Mitigation</strong> Strategy<br />

Multi-Hazard <strong>Mitigation</strong> <strong>Plan</strong> Page 5-2<br />

April <strong>2010</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!