10.04.2015 Views

(CarBi) project - REDD - VietNam

(CarBi) project - REDD - VietNam

(CarBi) project - REDD - VietNam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

www.panda.org/greatermekong<br />

The anamites carbon<br />

sinks and biodiversity<br />

(<strong>CarBi</strong>) <strong>project</strong><br />

<strong>REDD</strong>+ nesting workshop


www.panda.org/greatermekong<br />

Implementation<br />

time 2011-2014<br />

Financing<br />

* € 7 Mio from<br />

ICI-BMU<br />

* €1.5 Mio from<br />

WWF<br />

WWFimplementation<br />

agency, with<br />

government<br />

partners in<br />

Vietnam and<br />

Lao


www.panda.org/greatermekong<br />

The <strong>project</strong> goal:<br />

For a species-rich, trans-border forest complex of four conservation<br />

areas in Vietnam and Laos (around 200,000 hectares) and priority<br />

areas in Vietnam in two connected corridors, a sustainable<br />

management regime will be developed and implemented.


Project Components<br />

www.panda.org/greatermekong<br />

1. Improving Protected Area<br />

management<br />

2. Natural forest restoration in the<br />

degraded forest corridors in<br />

Quang Nam and Thua Thien Hue<br />

provinces in Vietnam<br />

3. Reducing illegal logging and<br />

control of trans-boundary timber<br />

trade<br />

4. Trans-boundary <strong>REDD</strong> pilot


Three parts:<br />

<strong>REDD</strong> Component<br />

• PDD Development<br />

Designing a participatory, transparent,<br />

technically state-of-the-art <strong>project</strong><br />

• MRV<br />

Quantifying and monitoring the forest<br />

carbon stocks<br />

• Capacity Building<br />

Bridging understanding between local<br />

people and <strong>project</strong> partners<br />

www.panda.org/greatermekong


PDD Development<br />

www.panda.org/greatermekong<br />

• Project aims to sell carbon<br />

credits in the Voluntary<br />

Carbon Market<br />

• A Project Design Document<br />

(PDD) is the key tool to<br />

access this market.<br />

• First step: engage<br />

consultants to conduct<br />

feasibility study.


www.panda.org/greatermekong<br />

MRV<br />

• A robust Measurement, Reporting and<br />

Verification (MRV) system is important to<br />

ensure that estimates of the changes in the<br />

carbon emissions as a result of the <strong>project</strong> are<br />

real and credible.<br />

• Combination of remote sensing and groundtruthing<br />

• The <strong>project</strong>-based MRV system should be<br />

compatible with national-level MRV systems


Capacity building<br />

www.panda.org/greatermekong<br />

• Capacity building on:<br />

• <strong>REDD</strong> baseline and monitoring<br />

methods<br />

• PDD development<br />

• Benefit sharing mechanisms<br />

• Approaches:<br />

• Formal workshops and training<br />

• “Learning by doing” - working<br />

closely with <strong>project</strong> partners<br />

• Learning from the experiences of<br />

other <strong>project</strong>s


Trans-boundary issues<br />

• <strong>CarBi</strong> designed as a trans-boundary <strong>project</strong> - to try and<br />

test approaches to managing international “leakage”,<br />

additional complexities to the <strong>project</strong>.<br />

• A trans-boundary PDD will be challenging due to<br />

legislative and technical issues.<br />

• Approach to PDD development will be confirmed during<br />

upcoming feasibility study, but may involve developing<br />

“modular” PDDs<br />

• Challenges with trans-boundary approach:<br />

• Given drivers of deforestation in the region;<br />

• May need to involve complex benefit sharing agreements<br />

www.panda.org/greatermekong


Thank you!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!