Tailings and mine waste management - Ausenco
Tailings and mine waste management - Ausenco
Tailings and mine waste management - Ausenco
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Tailings</strong> <strong>and</strong> <strong>mine</strong><br />
<strong>waste</strong> <strong>management</strong><br />
Environment <strong>and</strong> sustainability
<strong>Tailings</strong> <strong>and</strong> <strong>mine</strong> <strong>waste</strong> <strong>management</strong><br />
<strong>Ausenco</strong> is a leading global provider<br />
of engineering <strong>and</strong> project <strong>management</strong><br />
services to the resource <strong>and</strong> energy sectors.<br />
We combine ingenuity with insight to deliver<br />
effective end-to-end solutions for our clients.<br />
Our professionals offer expertise across every<br />
aspect of the resource <strong>and</strong> energy sectors<br />
— in areas including <strong>mine</strong>ral processing;<br />
pipelines; transportation systems; ports <strong>and</strong><br />
terminals; infrastructure; <strong>and</strong> conventional,<br />
renewable <strong>and</strong> alternative energies. We’re also<br />
experts in optimising performance through<br />
tailored operations <strong>and</strong> maintenance solutions,<br />
<strong>and</strong> in providing environmental <strong>and</strong><br />
sustainability strategies that deliver benefits<br />
for projects, communities <strong>and</strong> the environment.<br />
We’re skilled in every phase of the project<br />
lifecycle. From initial concept through to<br />
operation <strong>and</strong> closure, our people can assess,<br />
plan, cost, design <strong>and</strong> construct ingenious<br />
solutions that add value <strong>and</strong> support your return<br />
on investment.<br />
Our track record includes tailings storage<br />
dams <strong>and</strong> impoundments in wet <strong>and</strong> dry<br />
climates, at high elevations, in active<br />
seismic regions, <strong>and</strong> in some of the most<br />
remote <strong>mine</strong> locations.
Delivering sustainable solutions for a<br />
cleaner environment<br />
Today, the environment <strong>and</strong> sustainability are<br />
key considerations across the energy <strong>and</strong><br />
resources sectors.<br />
We care about the environments in which<br />
we operate globally, <strong>and</strong> work with our clients<br />
<strong>and</strong> communities to deliver the best outcomes<br />
for all.<br />
Our professional strengths in geotechnical,<br />
civil, hydrological, hydrogeological <strong>and</strong><br />
environmental sciences enable us to<br />
deliver practical solutions that fulfil our<br />
clients’ sustainability strategies.<br />
We are experienced in:<br />
• adhering to local <strong>and</strong> regional<br />
sustainable development considerations<br />
• using sustainability concepts to drive<br />
innovation in the design phase<br />
• applying <strong>management</strong> systems in the<br />
construction phase to deliver projects on<br />
specification, on time, on budget <strong>and</strong> without<br />
safety incidents<br />
• using triple-bottom-line decision-making<br />
processes to optimise performance during all<br />
phases of a project.<br />
We have a long track record in developing<br />
effective, sustainable systems for managing<br />
tailings <strong>and</strong> <strong>mine</strong> <strong>waste</strong>.<br />
Managing <strong>waste</strong> effectively <strong>and</strong> sustainably<br />
<strong>Ausenco</strong> has extensive experience in designing<br />
a variety of tailings-storage facilities, including<br />
in difficult terrain <strong>and</strong> challenging climatic<br />
conditions. We have designed more than 100<br />
tailings dams <strong>and</strong> 200 heap-leach pad projects<br />
across the globe.<br />
We’re one of the world’s leaders in the field,<br />
with a track record that includes tailingsstorage<br />
dams <strong>and</strong> impoundments in wet <strong>and</strong><br />
dry climates, at high elevations, in active seismic<br />
regions, <strong>and</strong> in some of the most remote<br />
<strong>mine</strong> locations.<br />
We offer end-to-end solutions for both the<br />
design <strong>and</strong> civil quality assurance of tailingsstorage<br />
facilities.<br />
Our <strong>mine</strong> <strong>waste</strong> systems include <strong>waste</strong><br />
dump <strong>management</strong>, embankment dams,<br />
borrow source evaluations, general, civil,<br />
<strong>and</strong> foundations.<br />
Reflexion of the geomembrane over<br />
the tailings pond, PanAmerican Silver,<br />
La Colorada <strong>mine</strong>, Mexico
Our experience<br />
Project<br />
Pascua Lama<br />
Location<br />
Chile–Argentina border<br />
Client<br />
Barrick Gold<br />
Year<br />
2004–ongoing<br />
Description<br />
Located at high altitude on<br />
the border between Argentina<br />
<strong>and</strong> Chile, this project at the<br />
Pascua Lama gold–silver<br />
<strong>mine</strong> presented technical,<br />
environmental, <strong>and</strong> health<br />
<strong>and</strong> safety challenges.<br />
<strong>Ausenco</strong>’s role included:<br />
• developing the<br />
detailed design <strong>and</strong><br />
permitting package for<br />
the tailings facility<br />
• completing the design<br />
for the site hydrology,<br />
surface water diversion<br />
<strong>and</strong> detention system.<br />
<strong>Ausenco</strong>’s technical solutions<br />
included provisions to control<br />
acid-rock drainage, minimise<br />
hydrological disturbance,<br />
<strong>and</strong> optimise the use of<br />
local <strong>waste</strong> rather than<br />
disturbing untouched areas<br />
for borrow materials.<br />
Project<br />
Corani<br />
Location<br />
Puno, Peru<br />
Client<br />
Bear Creek Mining Corporation<br />
Description<br />
Bear Creek Mining Corporation<br />
is developing the Corani<br />
silver-gold exploration project,<br />
located approximately 4,300 m<br />
above sea level in Puno, Peru.<br />
<strong>Ausenco</strong> has undertaken<br />
investigation, analysis,<br />
design <strong>and</strong> cost estimate<br />
development services for<br />
several facilities.<br />
Mitigation of environmental<br />
<strong>and</strong> social impacts has been<br />
a driver for developing<br />
sustainable designs for each<br />
facility. Key considerations<br />
have included:<br />
• community water dem<strong>and</strong>s<br />
<strong>and</strong> riparian flow<br />
<strong>management</strong>, including<br />
improved reliability of<br />
community water sources<br />
• post-closure uses of the<br />
tailings-storage facility<br />
site in relation to<br />
closure l<strong>and</strong>form<br />
• state-of-the-practice<br />
application of geocomposite<br />
<strong>and</strong> soil liners.<br />
Project<br />
Cerro Matoso Ferronickel Mine<br />
Location<br />
Montelibano, Colombia<br />
Client<br />
BHP Billiton —<br />
Cerro Matoso SA<br />
Year<br />
2011<br />
Description<br />
<strong>Ausenco</strong> reviewed the<br />
stability of the Sajana tailings<br />
dam at the Cerro Matoso<br />
ferronickel <strong>mine</strong> after<br />
changes to the use of<br />
cyclones created uncertainty<br />
regarding the dam’s<br />
geotechnical performance.<br />
We conducted a geotechnical<br />
desktop study for the tailings<br />
dam, including<br />
• numeric model calibration<br />
to compare the original<br />
design with actual<br />
geotechnical conditions<br />
• a hydrogeological model,<br />
including water balance,<br />
flow direction <strong>and</strong> watertable<br />
estimation<br />
• a conceptual liquefaction<br />
analysis to identify<br />
potential tailings dam<br />
failure due to dynamic<br />
load (earthquake).<br />
To learn more about our experience in sustainable <strong>management</strong> of tailings <strong>and</strong> <strong>mine</strong> <strong>waste</strong>,<br />
contact us via email business.development@ausenco.com or visit our website www.ausenco.com<br />
AUS0716_04_TMWM_V1_06.02.13