“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

In the oil stocks at the site <strong>of</strong> Units 5 and 6 emergency inventory (in two tanks with capacity<br />

per 2000 m3) ensuring additional operation <strong>of</strong> all simultaneously during 7 days is stored. The oil<br />

inventories (operational and backup) are sufficient <strong>for</strong> the diesel-generators operation during 20<br />

days, according to item 4.3.1.5 <strong>of</strong> [45].<br />

The mobile diesel-generator is designed to ensure power supply <strong>of</strong> alternative pumps <strong>for</strong><br />

steam generators makeup water pumps. The mobile diesel-generator can power only one out <strong>of</strong> two<br />

pumps (that <strong>of</strong> unit 5 <strong>of</strong> unit 6). The fuel tank has capacity <strong>of</strong> 3,5 m3. The maximum flow-rate <strong>of</strong><br />

the fuel is about 320 l/h. With this flow-rate the inventory in the tank located on the plat<strong>for</strong>m is<br />

sufficient <strong>for</strong> about 11 hours’ continuous operation.<br />

DC power supply systems <strong>of</strong> safety systems (I, II and III trains) are located at elevation<br />

20,40 and are not affected by MWL. According to the data from technical tests, the batteries last<br />

over 10 hours with real load without degradation.<br />

3.2.1.3 SFS<br />

3.2.1.3.1 Major SSCs<br />

In definition <strong>of</strong> critical SSCs documents [26],[107], and from [109] to [113] inclusively<br />

were considered.<br />

The system <strong>for</strong> filling, makeup, transfusion and emptying <strong>of</strong> the fuel storage pools is<br />

determined as critical SSCs due to the requirements <strong>of</strong> item 5.5.2 <strong>of</strong> [26]. The ventilation systems<br />

are determined as critical SSCs due to the requirements <strong>of</strong> item 5.8.1 <strong>of</strong> [26] and [113]. The power<br />

supply system is determined as significant SSCs due to the requirements <strong>for</strong> the ventilation systems<br />

as well as due to item 5.9.2 <strong>of</strong> [26].<br />

3.2.1.3.2 Protective measures <strong>for</strong> maintaining cooling water supply<br />

According to the defined SSCs the spent fuel compartments cooling system is not <strong>of</strong> interest<br />

<strong>for</strong> safety margins reassessment as according to [26], it may remain inoperable <strong>for</strong> up to four days,<br />

besides item 6.5.1.2 [25] stated that normally fuel storage pool cooling system operation is required<br />

<strong>for</strong> one week per month.<br />

3.2.1.3.3 Protective measures <strong>for</strong> maintaining emergency power supply<br />

For power supply or category 1 and 2 equipment a complete two-trans<strong>for</strong>mer substation<br />

with dry trans<strong>for</strong>mers with capacity <strong>of</strong> 630 kVА and two-section switchgear with redundancy<br />

between the sections is provided. The substation power supply is by two independent cable lines<br />

from 6 kV sections <strong>of</strong> units 3 and 4.<br />

3.2.1.4 DSFS<br />

3.2.1.4.1 Major SSCs<br />

110/202