17.04.2015 Views

Summary Report for Conduct of Kozloduy NPP Stress Tests

Summary Report for Conduct of Kozloduy NPP Stress Tests

Summary Report for Conduct of Kozloduy NPP Stress Tests

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

Between the first 4 Units (1 to 4), on one hand, and Units 5 and 6, on the other hand,<br />

connections are provided between process systems ensuring supply <strong>of</strong> demineralised water, steam,<br />

water <strong>for</strong> fire fighting at technological demand:<br />

· Fire fighting systems <strong>of</strong> units 1 to 4 and <strong>of</strong> 5 and 6 are integrated in fire rings. Fire<br />

ring <strong>of</strong> units 1 to 4 is connected with fire ring <strong>of</strong> units 5 and 6 wich are interconnected and, if<br />

needed, provisions are in place <strong>for</strong> water to be supplied <strong>for</strong> fire fighting between them.<br />

· Auxiliary steam systems <strong>of</strong> units 5 and 6 are connected with those <strong>of</strong> units 1 to 4 in<br />

order to supply steam <strong>for</strong> process needs;<br />

· The demineralised water systems <strong>of</strong> units 5 and 6 are connected with those <strong>of</strong> units 1<br />

to 4, providing possibility <strong>of</strong> exchange <strong>of</strong> demineralised water between the units.<br />

1.1.3 Licensing Status<br />

The Licensees <strong>for</strong> nuclear facilities located in <strong>Kozloduy</strong> <strong>NPP</strong> site are as follows:<br />

· Unit 1 - licensee is the State Enterprise "Radioactive waste"; valid until 17. 10. 2015,<br />

the Scope – radioactive waste management facility to be decommissioned [9].<br />

· Unit 2 - licensee is the State Enterprise "Radioactive waste"; valid until 17. 10. 2015,<br />

the Scope – radioactive waste management facility to be decommissioned [10].<br />

· Unit 3 - licensee is "<strong>Kozloduy</strong> <strong>NPP</strong> PLC; valid until 20. 05. 2014 [11].<br />

· Unit 4 - licensee is "<strong>Kozloduy</strong> <strong>NPP</strong> PLC; valid until 26. 02. 2013 [12].<br />

· Unit 5 - licensee is "<strong>Kozloduy</strong> <strong>NPP</strong> PLC; valid until 05. 11. 2017 [13].<br />

· Unit 6 - the licensee is "<strong>Kozloduy</strong> <strong>NPP</strong> PLC; valid until 02. 10. 2019 [14].<br />

· Spent fuel storage facility - licensee is " <strong>Kozloduy</strong> <strong>NPP</strong> " PLC; valid until 24.06.2014<br />

[15].<br />

· Spent fuel dry storage facility – currently the dry storage <strong>for</strong> spent fuel is under<br />

Utilization Permit <strong>for</strong> construction phase I.<br />

16/202

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!