“<strong>Kozloduy</strong> <strong>NPP</strong>” PLC<br />

SUMMARY REPORT<br />

<strong>for</strong> <strong>Conduct</strong> <strong>of</strong> <strong>Kozloduy</strong> <strong>NPP</strong><br />

<strong>Stress</strong> <strong>Tests</strong><br />

availability <strong>of</strong> the siphons at elevation <strong>of</strong> -4.50 = 31,10m). Pumps <strong>of</strong> ASSGEM system are located<br />

at elevation <strong>of</strong> -3.00 m which determines that they will be affected at MWL more than +32,50 m.<br />

The only scenario is isolation <strong>of</strong> water supply systems „Zhelezni vrata” 1 and 2 as a result <strong>of</strong><br />

the earthquake. however in this case the effect <strong>of</strong> MWL will be executed at sufficiently later phase<br />

<strong>of</strong> accident progress process (about 20 hours after the earthquake).<br />

In accordance with results <strong>of</strong> assessment <strong>of</strong> the margins at extreme meteorological<br />

conditions it is defined that due to closed and self-contained nature <strong>of</strong> the spent fuel storage system,<br />

SFP 3 and 4 and their auxiliary systems there is a high safety level in relation to external factor<br />

„Extreme winds and tornados”.<br />

6.1.3.2.3 Unavailability <strong>of</strong> the power supply<br />

In accordance with results <strong>of</strong> assessment <strong>of</strong> margins to loss <strong>of</strong> electric power and loss <strong>of</strong><br />

ultimate heat sink, it is defined that power supply to these systems <strong>for</strong> cooling <strong>of</strong> the fuel in SFP-3<br />

and SFP-4 is provided from various physically separated sources (emergency diesel generators –<br />

three per unit, emergency diesel-generators <strong>of</strong> ASSGEM, mobile DG). At low value <strong>of</strong> decay heat<br />

<strong>of</strong> the fuel stored in the pools. Available time margin be<strong>for</strong>e the assemblies uncoverage starts is<br />

about one week <strong>for</strong> SFP-3 and more than 9 days <strong>for</strong> SFP-4 at assumption <strong>of</strong> complete loss <strong>of</strong><br />

cooling.<br />

6.1.3.2.4 Potential failure <strong>of</strong> measurement instrumentation<br />

Within short-term modernization program <strong>of</strong> the units analysis was done <strong>for</strong> definition <strong>of</strong><br />

environmental parameters <strong>for</strong> equipment qualification at emergency conditions. As the first step <strong>of</strong><br />

the qualification the sensors <strong>of</strong> emergency protection chains were replaced with qualified sensors <strong>of</strong><br />

Emergency protection chains. For some the sensors related to safety, new location was selected, and<br />

they were moved to area which does not require qualification on extreme environmental conditions.<br />

As a result, at present all the measurement channels, related to reactor protection are<br />

qualified <strong>for</strong> correspondent seismic and environmental conditions. For conditioning <strong>of</strong> process<br />

parameter signals, precise digital equipment is used. Uninterrupted power supply units (UPS)<br />

additionally isolate power supply to these channels, by which independence is assured <strong>for</strong> the power<br />

supply to the channels.<br />

In addition to that the qualification program is executed <strong>for</strong> the remaining equipment related<br />

to safety, including test <strong>of</strong> samples <strong>of</strong> equipment <strong>for</strong> ageing, seismic and environmental conditions<br />

at loss-<strong>of</strong>-coolant accident. On the basis <strong>of</strong> results <strong>of</strong> the qualification program the remaining<br />

safety-related sensors were also replaced.<br />

To support Operator actions additional set <strong>of</strong> the computerized systems was implemented,<br />

such as:<br />

· Computerized system <strong>for</strong> supporting the operator and recording the process<br />

parameters at normal operations and in case <strong>of</strong> accident;<br />