20.04.2015 Views

156: EDA Public Works in RI, 1996-2000 - State of Rhode Island ...

156: EDA Public Works in RI, 1996-2000 - State of Rhode Island ...

156: EDA Public Works in RI, 1996-2000 - State of Rhode Island ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8. Enterprise Zone Po<strong>in</strong>ts: 5 maximum<br />

Project is <strong>in</strong> a state-designated enterprise zone 5<br />

9. Income Po<strong>in</strong>ts: 15 maximum<br />

a. Less than $27,000 15<br />

b. $27,000 - $32,999 12<br />

c. $33,000 - $35,999 9<br />

d. $36,000 - $38,999 6<br />

e. $39,000 and above 3<br />

10. Applicant’s Priority Po<strong>in</strong>ts: 5 maximum<br />

a. Priority rank<strong>in</strong>g number 1 5<br />

b. " " " 2 4<br />

c. " " " 3 3<br />

d. " " " 4 2<br />

e. " " " 5 1<br />

f. " " " 6 or below 0<br />

g. No rank<strong>in</strong>g 0<br />

11. Approved Comprehensive Plan Po<strong>in</strong>ts: 5 maximum<br />

a. Project is located <strong>in</strong> a city or town whose comprehensive plan 5<br />

has received state certification.<br />

b. Project is located <strong>in</strong> a city or town whose comprehensive plan 3<br />

has been submitted for state review but not yet received certification.<br />

c. Project located <strong>in</strong> a city or town that has not yet submitted a 0<br />

comprehensive plan for state review.<br />

B. Explanation <strong>of</strong> Project Rank<strong>in</strong>g Criteria<br />

1. Job Development Costs<br />

The eventual number <strong>of</strong> jobs result<strong>in</strong>g from the implementation <strong>of</strong> a proposal is a<br />

prime consideration <strong>in</strong> priority selection. The figures are used to determ<strong>in</strong>e a cost per<br />

job. Cost refers to total project cost. “Long range” jobs are those expected once a<br />

facility or project beg<strong>in</strong>s operation; do not count construction jobs.<br />

Estimates that are not documented <strong>in</strong> a study will be penalized by a deduction <strong>of</strong> 5<br />

po<strong>in</strong>ts under this criterion. Projects not expected to be <strong>in</strong>itiated with<strong>in</strong> two years will<br />

also <strong>in</strong>cur a 5-po<strong>in</strong>t penalty.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!