12<br />

An outline by Nickie May<br />

U<br />

nsurprisingly,<br />

renewable energy in<br />

Orkney equals wind, with<br />

Orkney possessing one of the best<br />

wind resources within the UK.<br />

The topography of Orkney<br />

makes for clean wind – a<br />

relatively open landscape<br />

ensures less turbulence<br />

and more harvestable wind.<br />

Harvesting the wind in Orkney<br />

began in the 1980s and there<br />

are several small-scale (c 5<br />

turbines) commercial wind farms<br />

which have been in existence<br />

for a number of years. More<br />

recently domestic wind turbines<br />

have started to appear – there<br />

are two here on Shapinsay –<br />

and even more recently, six of<br />

the smaller Orkney islands are<br />

rolling out community-owned<br />

wind turbine projects.<br />

Before moving on to the<br />

community-owned wind turbine<br />

projects I would just like to offer<br />

a few details of one of the small<br />

turbines here on the island, as it<br />

was actually a successful SRDP<br />

application. One of the farms has<br />

diversified into small-scale jam<br />

and preserves manufacture. A<br />

6 kW turbine now supplies the<br />

electricity to the converted bothy<br />

– an ABDS/marketing grant –<br />

where the jam is produced.<br />

Communities can benefit<br />

from a wind turbine in their<br />

midst in a number of ways. It is<br />

standard practice for commercial<br />

developments to offer £10-20,000<br />

to an appropriate community<br />

organisation to distribute to<br />

suitable causes within that<br />

community. The island of Sanday<br />

has a similar arrangement with<br />

<strong>Scottish</strong> and Southern Electricity<br />

(SSE) who have a commercial<br />

renewable energy<br />

Wind power possibilities<br />

development on that island.<br />

There are plans for the Sanday<br />

Development Trust and SSE<br />

to have joint ownership over a<br />

new turbine being added to the<br />

site. The form of community<br />

ownership currently evolving<br />

here on the smaller islands<br />

is where the developer is the<br />

island development trust, run by<br />

democratically elected members<br />

of the island community.<br />

Another alternative as to how<br />

a community of individuals can<br />

benefit from a turbine development<br />

is the co-operative model. Either<br />

a handful of folk get together to<br />

invest – one of the turbines here<br />

on mainland Orkney, described as<br />

a community-owned wind turbine<br />

is such an arrangement – or there<br />

are larger scale co-operatives as<br />

pulled together by Energy4All.<br />

Basically the plans are to<br />

install a 900 kW turbine which,<br />

on some of the islands, will<br />

create an annual income for<br />

the community’s use of approx<br />

£100,000 for the next 20 years.<br />

Indeed, this dream has become<br />

a reality for Westray with the<br />

trust on that island installing its<br />

turbine last autumn; Tiree, in the<br />

west, is at a similar stage. The<br />

recently-announced feed-in tariff<br />

rates make these projects look<br />

even more attractive although<br />

community projects of this type<br />

do look for grant funding where<br />

possible and the interaction<br />

between the tariffs and grants<br />

has yet to be clarified.<br />

Before you all get enthusiastic<br />

and start clamouring for one, here<br />

come the health warnings. The<br />

projects are vastly complicated,<br />

consume inordinate amounts of<br />

time and can create an awful lot of<br />

conflict within a small community.<br />

Look seriously at the capacity<br />

within the community. Are there<br />

enough folk with relevant skills<br />

with the time to throw at the<br />

project or with the time and the<br />

willingness to be outwith their<br />

comfort zones to acquire the<br />

skills? It’s essential to establish<br />

that the community does indeed<br />

support such a project. A postal<br />

vote of the entire community,<br />

independently verified, is the<br />

most transparent way to go about<br />

this. Getting a clear mandate from<br />

the community can seriously help<br />

smooth the path of the project.<br />

A brief run through the<br />

challenges these projects face.<br />

Find a wind turbine manufacturer<br />

willing to supply to your area – it<br />

took Westray two years. Find a<br />

suitable site; close to three phase<br />

electricity and 10 times the blade<br />

diameter from the nearest house<br />

and be mindful of any resident<br />

bird populations. Planning:<br />

expensive, as an environmental<br />

impact assessment (a weighty<br />

tome) is required and two-stage<br />

projects receiving local approval<br />

then have to go to the <strong>Scottish</strong><br />

government. Watch out for the<br />

conditions attached. Negotiate<br />

with the department who told<br />

planning to put the condition in if<br />

it is likely to be onerous for the<br />

project to comply with it.<br />

Securing agreements over<br />

the land and access to the site<br />

– lease or freehold? If leasehold,<br />

watch how the rental payments<br />

are defined, compare them to<br />

the cash flow predictions and<br />

see if the formula comes up<br />

with the sort of money you are<br />

expecting to pay. Make sure that<br />

the leases are for longer than 20<br />

years and that there is no ability<br />

for the developer to end or break<br />

<strong>THE</strong> <strong>CROFTER</strong>, MAY 2010<br />

the lease if commercial finance<br />

is needed for the project. Grid<br />

connection: discuss capacity on<br />

the grid in your area, although<br />

SSE would not confirm the<br />

capacity that is actually available<br />

until they made the offer of a grid<br />

connection. Restricted capacity<br />

equals restricted earnings. With<br />

all these things, establish likely<br />

timescales for delivery and<br />

payment dates etc but remember<br />

that milestones in these projects<br />

are incredibly fluid.<br />

Now the really scary stuff.<br />

These projects face a complex<br />

interaction of company, charity<br />

and tax law so it is essential<br />

that the community group is<br />

protected by limited liability – the<br />

general legal format is that it is a<br />

company limited by guarantee or<br />

a community interest company.<br />

Check that the objects clauses<br />

within the memorandum and<br />

articles of association for the<br />

company (its constitution) allow<br />

the group to run a turbine. If<br />

the group has charitable status<br />

then it is not allowed to run a<br />

commercial business and must<br />

set up another company (a trading<br />

subsidiary) to run the turbine<br />

business to make sure that the<br />

charity is isolated from the risk<br />

associated with the business<br />

of running a turbine. Take out<br />

directors’ personal liability cover<br />

as there are situations in which<br />

the protection given by the<br />

limited liability status can be lifted<br />

and the directors face personal<br />

liability. And then when you have<br />

done all that, go and negotiate a<br />

commercial bank loan for ooh at<br />

least a cool £1 million, depending<br />

on the capital costs of the project<br />

and the amount of grant secured.<br />

Good luck!<br />

Skye Renewables Co-operative Ltd<br />

Chairman Donald MacGregor<br />

reports<br />

T<br />

he 572 members who<br />

subscribed for shares in<br />

Skye Renewables Cooperative<br />

Ltd in December<br />

2007 became shareholders in<br />

the Ben Aketil wind farm – the<br />

first commercial wind farm on<br />

the Isle of Skye.<br />

The landowners, MacLeod<br />

Estates and the tenants, Feorlig<br />

crofting township, granted<br />

permission for the construction<br />

and operation of the Ben Aketil<br />

wind farm to a subsidiary of<br />

Falck Renewables. Planning<br />

permission was obtained on 7th<br />

September 2006.<br />

The wind farm consists of<br />

10 x 23MW Enercon turbines.<br />

Planning permission has now<br />

been granted to extend the<br />

site by a further 2 x 23MW<br />

Enercon turbines.<br />

The site has now been<br />

operational for two full years and,<br />

apart from the satisfactory return<br />

being achieved by members of the<br />

co-op, a substantial community<br />

benefit fund is also administered<br />

by Dunvegan Community Trust.