Next year CNGS run: draft

SPS physics run:

Start: 26/5/2007

End: 7/11/2007

• 141 days of physics runs, excluding

machine development.

• completion of CNGS commissioning at

the beginning of the physics run: OCT 06

run canceled due to a water leak in the

second CNGS horn

• No high intensity beam (2.4·10 13

pot/extraction) until OPERA has reached 75%

of the target mass

• Integrated protons in the 2-3·10 19 pot range