Eglin Parkway Resurfacing Project

sheriff.okaloosa.org

Eglin Parkway Resurfacing Project

Eglin Parkway

Resurfacing Project

Pr o j e c t Description

The construction project is scheduled to begin

in April 2012. Improvements include removing

and replacing the asphalt along an approximately

4.5 mile section of S.R. 85 from 12th Avenue/

Richbourg Avenue in Shalimar to U.S. 98 (S.R. 30) in

Fort Walton Beach.

Other planned improvements include:

• Drainage upgrades.

• Repairing and/or constructing sidewalks at

selected locations.

• Improvements at the Eglin Parkway-Hollywood

Blvd. intersection.

• Traffic signalization upgrades.

• Replacing directional and information signage.

• Installing new pavement markings.

The project is currently scheduled for completion

in late 2013.

Po t e n t i a l Tra f f i c Im p a c t s

Drivers may experience increased traffic congestion during this

construction project. In an effort to minimize potential travel delays, lane

closures for milling and resurfacing work will be restricted to nighttime

hours, 8 p.m. to 5 a.m.

The speed limit will be reduced to 30 mph in the work zone.

Access to private property will be maintained at all times.

www.MyEglinParkway.com

www.twitter.com/myFDOT_NWFL


Eglin Parkway

Resurfacing Project

Sp e c i a l Im p a c t s f o r Eg l i n Pa r k w a y in Sh a l i m a r

Construction work will close the Eglin Parkway median between the Shalimar Drive/Cherokee Road and the Ninth

Avenue/Erwin Fleet Road intersections beginning in April 2012. Travel will be restricted to two lanes in each

direction during this portion of the project.

Eglin Parkway Resurfacing Project

Construction Phases in Shalimar

Work to Begin in April 2012

Construction area

(closed)

Barrier wall







Phase 1 Phase 2 Phase 3

Erwin Fleet Rd.

Erwin Fleet Rd.

Erwin Fleet Rd.

9th Ave.

9th Ave.

9th Ave.

Plew Ave.

Plew Ave.

Plew Ave.

6th Ave.

6th Ave.

6th Ave.

Old Ferry Rd.

Old Ferry Rd.

Old Ferry Rd.

N

Shalimar Dr.

Shalimar Dr.

Shalimar Dr.

W

S

E

Cherokee Rd.

Cherokee Rd.

Cherokee Rd.

Maps not to scale

Fo r Mo r e In f o r m a t i o n

Ian Satter

FDOT Dist. 3 Public Information Director

P.O. Box 607

Chipley, FL 32428

Tele: (888) 638-0250 Ext. 205 (toll-free)

E-mail: Ian.Satter@dot.state.fl.us

Mike Sasser

Project Public Information Coordinator

1697 East James Lee Blvd.

Crestview, FL 32536

Tele: (850) 689-4428

E-mail: msasser@MyEglinParkway.com