Deadlines Orderforms Technical guidelines Assembly and - Interlift
Deadlines Orderforms Technical guidelines Assembly and - Interlift
Deadlines Orderforms Technical guidelines Assembly and - Interlift
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Special conditions for services provided by Stadtwerke Augsburg (compressed air supply)<br />
1. Compressed air supply in floor duct in the EUR/Each<br />
st<strong>and</strong> space, with ball valve, as close as<br />
possible to the connection point.<br />
Nominal diameter up to 1/2” 330.00<br />
Nominal diameter larger than 1/2” by arrangement<br />
1. The connection <strong>and</strong> installation costs are invoiced to exhibitors by a<br />
representative of the service partner <strong>and</strong> are to be paid immediately on<br />
the st<strong>and</strong>.<br />
The invoice is to be checked without delay. If possible, complaints about the<br />
scope of deliveries <strong>and</strong> services charged are to be lodged with the service<br />
partner before dismantling the st<strong>and</strong> to ensure that a proper check can be<br />
made.<br />
2. The order <strong>and</strong> the st<strong>and</strong> installation plan are to be submitted to the organizer<br />
by not later than the specified date. The service partner is entitled to<br />
claim a surcharge on the prices stated of 25% on fixed price services <strong>and</strong><br />
50% for work at hourly rates for services that are not known on the specified<br />
assembly date or cannot be started at this time due to incomplete or<br />
unclear order information.<br />
In the event of cancellation of the order by the exhibitor, the service partner<br />
must be notified in writing at least 14 days before the start of the event,<br />
otherwise the exhibitor will be charged for the full costs occurred.<br />
3. Supply pipes <strong>and</strong> compressed air valves provided by the service partner on<br />
a hire basis remain the property of the service partner.<br />
The exhibitor has to ensure that the material used is available in a complete<br />
<strong>and</strong> undamaged condition at the end of the event ready for dismantling<br />
<strong>and</strong>/or collection by the service partner. Any missing parts will be charged<br />
to the exhibitor at current prices.<br />
2. Supply charge EUR/Each<br />
incl. consumption<br />
Nominal diameter up to 1/2” 140.00<br />
Nominal diameter larger than 1/2” 174.00<br />
All further work will be charged according to time <strong>and</strong> material<br />
expended. The hourly rate of € 39.50 includes all surcharges such<br />
as overtime hours, Sundays <strong>and</strong> public holidays.<br />
4. Connections from the existing main pipe to the st<strong>and</strong> are only to be made by<br />
the service partner. Installation work beyond the connection point in the<br />
st<strong>and</strong> will be charged according to time <strong>and</strong> material expended. Only the<br />
service partner is allowed to open the supply ducts. These ducts must be<br />
accessible at all times in case of a fault.<br />
5. Exhibitors are not permitted to connect their own pipes <strong>and</strong> equipment to<br />
existing pipes on another st<strong>and</strong>s. The service partner is entitled to disconnect<br />
the supply immediately in the event of such action.<br />
6. Duty fitters are available for clearing faults during the event.<br />
Place <strong>and</strong> date Company stamp <strong>and</strong> authorized signature of applicant