16.11.2012 Views

Deadlines Orderforms Technical guidelines Assembly and - Interlift

Deadlines Orderforms Technical guidelines Assembly and - Interlift

Deadlines Orderforms Technical guidelines Assembly and - Interlift

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Terms <strong>and</strong> <strong>guidelines</strong> for delivery <strong>and</strong> payment<br />

Please note ”Information from A - Z” <strong>and</strong> the ”<strong>Technical</strong> Guidelines - St<strong>and</strong> Instructions”<br />

1. Electricity consumption <strong>and</strong> charging<br />

Electricity consumption can be charged using a metre or as a flat rate.<br />

A metre is always installed for 400 V power supplies. Hire charge € 44.00.<br />

Metres belonging to the exhibitor are inspected for a fee of € 12.00.<br />

The flat-rate charge for electricity consumption is calculated as follows:<br />

supply rating x power-on time (10 hours) x (event duration + 2 assembly<br />

days) x electricity cost = consumption.<br />

This amount is rounded up to a whole number of €.<br />

The power consumption is to be stated accurately by the applicant <strong>and</strong> is<br />

checked continuously by the exhibition electrician. Should it subsequently<br />

be proved that a lower rating was stated, the amount of the difference is<br />

subsequently charged by a surcharge according to outlay.<br />

The price of electricity is € 0.35 per kW/h.<br />

The invoice will be issued in the beginning of the event <strong>and</strong> is to be paid<br />

immediately. Your st<strong>and</strong> personnel should be therefore be informed <strong>and</strong> provided<br />

with sufficient cash funds for this purpose (EC <strong>and</strong> Credit cards accepted).<br />

Due to organizational reasons, no exceptions of this regulation can be<br />

made.<br />

The invoice is to be checked immediately. Complaints about the scope of deliveries<br />

<strong>and</strong> services charged are to be lodged with the service partner before<br />

dismantling the st<strong>and</strong> to ensure that a proper check can be made.<br />

2. This form is to be used for ordering the connection of a power supply.<br />

The order form <strong>and</strong> the st<strong>and</strong> installation plan are to be submitted to the<br />

organizer by not later than the stated deadline. See note overleaf.<br />

3. An exhibitor withdrawing from the contract will be charged with the full<br />

costs occurred unless he has notified the approved contractor in writing at<br />

least 10 days before the start of the event.<br />

4. In order to ensure a stable supply of electricity to all exhibitors, the connection<br />

of unregistered equipment, particularly hotplates <strong>and</strong> heaters, entitles<br />

the organizer to immediately disconnect the supply. Special connections are<br />

required for electrical systems that cannot be supplied from the basic network<br />

due to their high rating.<br />

5. Systems <strong>and</strong> equipment must comply with the VDE <strong>and</strong> local electricity<br />

supply company regulations. Supplies rated above 3 kW are installed only as<br />

4-wire connections for load reasons.<br />

An earth-leakage circuit-breaker is used for safety protection (trip current<br />

30 mA). Exhibitors’ own distribution systems must therefore be equipped<br />

with separate neutral <strong>and</strong> protection earth conductors. The approved contractor<br />

accept no liability for damage caused by faulty electricity cables <strong>and</strong><br />

equipment that are not owned by him.<br />

6. The exhibitor is obliged to switch off the power supply each day before<br />

leaving his st<strong>and</strong> (liability for damages if this rule is neglected).<br />

If equipment (refrigerators etc.) must be left running overnight, the exhibitor<br />

is to ensure that no damage can occur.<br />

7. The use of two-way adapters <strong>and</strong> portable immersion heaters is prohibited<br />

for safety reasons.<br />

8. Cables, control panels, metres, etc. provided by the approved contractor on<br />

a hire basis remain the property of the contractor. The exhibitor is to ensure<br />

that the material used is available in a complete <strong>and</strong> undamaged condition<br />

at the end of the event ready for dismantling <strong>and</strong>/or collection by the contractor.<br />

Any missing parts will be charged to the exhibitor at current prices.<br />

9. Connections from the existing ring cable to the st<strong>and</strong> are only to be made by<br />

the approved contractor.<br />

10. Exhibitors are not permitted to connect their own cables <strong>and</strong> equipment to<br />

existing cables on another st<strong>and</strong>. The approved contractor is entitled to disconnect<br />

the supply immediately in the event of such action.<br />

11. No liability is accepted for the effects of power failure, voltage fluctuations<br />

<strong>and</strong> damage to the system.<br />

Duty fitters are available for clearing faults during the event.<br />

12. The order is placed subject to acceptance of the above terms of delivery <strong>and</strong><br />

payment.<br />

13. The place of fulfilment <strong>and</strong> jurisdiction for both parties is Augsburg.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!