Terms <strong>and</strong> <strong>guidelines</strong> for delivery <strong>and</strong> payment<br />
Please note ”Information from A - Z” <strong>and</strong> the ”<strong>Technical</strong> Guidelines - St<strong>and</strong> Instructions”<br />
1. Electricity consumption <strong>and</strong> charging<br />
Electricity consumption can be charged using a metre or as a flat rate.<br />
A metre is always installed for 400 V power supplies. Hire charge € 44.00.<br />
Metres belonging to the exhibitor are inspected for a fee of € 12.00.<br />
The flat-rate charge for electricity consumption is calculated as follows:<br />
supply rating x power-on time (10 hours) x (event duration + 2 assembly<br />
days) x electricity cost = consumption.<br />
This amount is rounded up to a whole number of €.<br />
The power consumption is to be stated accurately by the applicant <strong>and</strong> is<br />
checked continuously by the exhibition electrician. Should it subsequently<br />
be proved that a lower rating was stated, the amount of the difference is<br />
subsequently charged by a surcharge according to outlay.<br />
The price of electricity is € 0.35 per kW/h.<br />
The invoice will be issued in the beginning of the event <strong>and</strong> is to be paid<br />
immediately. Your st<strong>and</strong> personnel should be therefore be informed <strong>and</strong> provided<br />
with sufficient cash funds for this purpose (EC <strong>and</strong> Credit cards accepted).<br />
Due to organizational reasons, no exceptions of this regulation can be<br />
made.<br />
The invoice is to be checked immediately. Complaints about the scope of deliveries<br />
<strong>and</strong> services charged are to be lodged with the service partner before<br />
dismantling the st<strong>and</strong> to ensure that a proper check can be made.<br />
2. This form is to be used for ordering the connection of a power supply.<br />
The order form <strong>and</strong> the st<strong>and</strong> installation plan are to be submitted to the<br />
organizer by not later than the stated deadline. See note overleaf.<br />
3. An exhibitor withdrawing from the contract will be charged with the full<br />
costs occurred unless he has notified the approved contractor in writing at<br />
least 10 days before the start of the event.<br />
4. In order to ensure a stable supply of electricity to all exhibitors, the connection<br />
of unregistered equipment, particularly hotplates <strong>and</strong> heaters, entitles<br />
the organizer to immediately disconnect the supply. Special connections are<br />
required for electrical systems that cannot be supplied from the basic network<br />
due to their high rating.<br />
5. Systems <strong>and</strong> equipment must comply with the VDE <strong>and</strong> local electricity<br />
supply company regulations. Supplies rated above 3 kW are installed only as<br />
4-wire connections for load reasons.<br />
An earth-leakage circuit-breaker is used for safety protection (trip current<br />
30 mA). Exhibitors’ own distribution systems must therefore be equipped<br />
with separate neutral <strong>and</strong> protection earth conductors. The approved contractor<br />
accept no liability for damage caused by faulty electricity cables <strong>and</strong><br />
equipment that are not owned by him.<br />
6. The exhibitor is obliged to switch off the power supply each day before<br />
leaving his st<strong>and</strong> (liability for damages if this rule is neglected).<br />
If equipment (refrigerators etc.) must be left running overnight, the exhibitor<br />
is to ensure that no damage can occur.<br />
7. The use of two-way adapters <strong>and</strong> portable immersion heaters is prohibited<br />
for safety reasons.<br />
8. Cables, control panels, metres, etc. provided by the approved contractor on<br />
a hire basis remain the property of the contractor. The exhibitor is to ensure<br />
that the material used is available in a complete <strong>and</strong> undamaged condition<br />
at the end of the event ready for dismantling <strong>and</strong>/or collection by the contractor.<br />
Any missing parts will be charged to the exhibitor at current prices.<br />
9. Connections from the existing ring cable to the st<strong>and</strong> are only to be made by<br />
the approved contractor.<br />
10. Exhibitors are not permitted to connect their own cables <strong>and</strong> equipment to<br />
existing cables on another st<strong>and</strong>. The approved contractor is entitled to disconnect<br />
the supply immediately in the event of such action.<br />
11. No liability is accepted for the effects of power failure, voltage fluctuations<br />
<strong>and</strong> damage to the system.<br />
Duty fitters are available for clearing faults during the event.<br />
12. The order is placed subject to acceptance of the above terms of delivery <strong>and</strong><br />
payment.<br />
13. The place of fulfilment <strong>and</strong> jurisdiction for both parties is Augsburg.