16.11.2012 Views

Deadlines Orderforms Technical guidelines Assembly and - Interlift

Deadlines Orderforms Technical guidelines Assembly and - Interlift

Deadlines Orderforms Technical guidelines Assembly and - Interlift

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Return to<br />

AFAG Messen und Ausstellungen GmbH<br />

Messezentrum<br />

D-86159 Augsburg<br />

Tel +49 (0) 8 21. 5 89 82-343<br />

Fax +49 (0) 8 21. 5 89 82-308<br />

technik.interlift@afag.de<br />

for forwarding<br />

to our approved contractor<br />

Transport services<br />

Deadline<br />

2009-09-04<br />

Company: ________________________________________________________________________________________________________<br />

Address: __________________________________________________________________________________________________________<br />

Person responsible: __________________________________________________________________________________________________<br />

Tel: ______________________________________________<br />

/<br />

Fax: _____________________________________________<br />

/<br />

E-Mail: ___________________________________________<br />

We order in accordance with the scale of charges overleaf:<br />

Hall: St<strong>and</strong>:<br />

11.B<br />

Delivery of incoming goods to above-mentioned st<strong>and</strong> Date __________________ Time ____________________<br />

Customs clearance of exhibition material<br />

Temporary importation Permanent importation Outgoing customs clearance<br />

Clearance on customs German import duties Cancellation of customs declaration of use <strong>and</strong> clearance<br />

declaration of use incl. possible (any customs duties <strong>and</strong> on T document (incl. transport to the desired destination).<br />

acceptance at airport/seaport taxes payable at our cost) The necessary formalities will be clarified on the exhibition<br />

st<strong>and</strong> during the exhibition.<br />

We will send the originals of the necessary documents (freight documents, B/L, trading invoices & possible certificates) to the address of Schenker Germany AG given below<br />

as soon as possible.<br />

<strong>Assembly</strong> Dismantling<br />

fork-lift _______ t capacity fork-lift _______ t capacity<br />

Date ___________ Time ___________ Date ___________ Time ___________<br />

crane with telescopic jib _______ t capacity crane with telescopic jib _______ t capacity<br />

Date ___________ Time ___________ Date ___________ Time ___________<br />

collection of our empty containers _______ cbm The return delivery of empty containers starts automatically for all<br />

Date ___________ Time ___________ exhibitors approx. 1 hour after the end of the exhibition; fixed times are<br />

collection of our full goods _______ cbm<br />

unfortunately not possible.<br />

Date ___________ Time ___________ The return delivery of full goods is subject to special request.<br />

Return transportation of exhibition goods after the exhibition<br />

The necessary formalities will be clarified on the exhibition st<strong>and</strong> during the exhibition.<br />

The office of Schenker Deutschl<strong>and</strong> AG at the Augsburg exhibition site is open during the official assembly <strong>and</strong> dismantling times <strong>and</strong> during the exhibition. We request exhibiting<br />

companies wishing to dispatch exhibition goods or st<strong>and</strong> construction material to contact Schenker Deutschl<strong>and</strong> AG in due time before dispatching goods. Please dispatch<br />

part-load consignments in due time to Schenker Deutschl<strong>and</strong> AG, Paul-Henri-Spaak-Straße 8, D-81829 München. The consignments will be delivered to your st<strong>and</strong> on time <strong>and</strong><br />

in accordance with your instructions..<br />

Approved contractor:<br />

Schenker Deutschl<strong>and</strong> AG Tel +49 (0) 8 9. 9 49-2 43 00<br />

SCHENKERfairs Fax +49 (0) 8 9. 9 49-2 43 39<br />

Paul-Henri-Spaak-Straße 8 interlift@schenker.com<br />

D-81829 München Contact: Georg Gartner, Rick Lawrenz<br />

General: All our business is exclusively transacted subject to the most recent edition of the German Forwarder’s St<strong>and</strong>ard Terms <strong>and</strong> Conditions (ADSp).<br />

ACCORDING TO § 23 ADSP, THE LEGAL LIABILITY FOR DAMAGE TO GOODS AS STATED IN § 431 HGB (GERMAN COMMERCIAL CODE) IS LIMITED TO 5 EUROS/KG WHILST IN THE CARE OF A FOR-<br />

WARDER, TO 2 SDR/KG (SPECIAL DRAWING RIGHTS) FOR MULTIMODAL TRANSPORTS INCL. SEA TRANSPORTS, AS WELL AS TO AN ADDITIONAL 1 MILLION EUROS OR 2 MILLION EUROS PER DAMA-<br />

GE OR EVENT OR ELSE 2 SDR/KG DEPENDING ON WHICH AMOUNT IS HIGHER.<br />

In addition the Fair <strong>and</strong> Exhibition Conditions are applicable. Court of law: Munich.<br />

The exhibition forwarding agent has assumed responsibility from the Exhibition Management for the provision of sufficient cranes <strong>and</strong> fork-lift trucks to ensure smooth assembly <strong>and</strong> dismantling of the<br />

exhibition. For safety <strong>and</strong> liability reasons, it is essential that lifting equipment such as fork-lift trucks <strong>and</strong> cranes are requested exclusively via the official exhibition forwarding agent. Services provided<br />

by the exhibition forwarding agent are billed according to the respective current scale of charges as printed overleaf. The exhibition forwarding agent is entitled to request payment of the costs of<br />

services supplied in cash or on account. Please therefore provide your st<strong>and</strong> personnel on site with sufficient funds (cash, credit cards).<br />

Place <strong>and</strong> date Company stamp <strong>and</strong> authorized signature of applicant<br />

Please turn over!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!