Hills Cement Co. Limited.<br />

1.3 SCOPE OF ASSIGNMENT<br />

The scope includes field study and data collection in respect of -<br />

a. Air Environment - For one season relating to the existing status of<br />

Ambient Air Quality, Collection of Meteorological data and establishing<br />

the range of all existing emission sources in the study area, if any.<br />

b. Water Environment - By collecting samples of surface and ground<br />

water in different seasons and analyzing the same as per IS -<br />

Standards and also conduct ecological examination of site.<br />

c. Flora & Fauna - The existing status of the Flora and Fauna in 10 Km<br />

radius of study area shall be studied.<br />

d. Noise Environment - shall be studied considering existing incremental<br />

noise level of the study area.<br />

e. Dust Fall Studies - shall be made as per the guidelines of the<br />

CPCB/MOEF.<br />

A reconnaissance survey of the area was undertaken for -<br />

(i) Collection of prospecting data to propose a suitable actionplan.<br />

(ii) Collection of base-line information on air, water, soil,<br />

vegetation, flora, meteorology, noise and vibration.<br />

(iii) Collection of data on land use pattern, demography and<br />

Socio-economic conditions from various reports of<br />

Central/<strong>State</strong> Government agencies and through field surveys.<br />

1.4 COST OF THE PROJECT<br />

The cost of the project has been estimated at Rs. 360 Crores under the<br />

following heads: <br />

<br />

S.No. Particulars Cost Rs. Lacs<br />

1. Land and site Development 750<br />

2. Building and other Civil Structures 6,107<br />

3. Plant & Machinery 18,180<br />

4. Technical Know-how Fees 200<br />

5. Expenses on Training 15<br />

6. Miscellaneous Fixed Assests 5881<br />

7. Pre-Operative Expenses 2135<br />

8. Provision for Contingencies 2,143<br />

9. Margin for Working Capital 564<br />

TOTAL Rs. 360 Crores (Say) 35,975<br />

<strong>Pollution</strong> <strong>Control</strong> Consultants (India) Pvt. Ltd. 3