Osirys - Newsletter - February 2015

netcomposites

Osirys - Newsletter - February 2015

Multi-layered Wall Systemmany of the same materials, while differingin the design and engineering. Some ofthe most remarkable components to beengineered are the structural profiles ineach of these products. Our first graphenereinforced pultrusions are being producedand tested at lab scale, and by the endof 2015 full-scaled simulations will beconducted. The multi-layered and curtainwall systems will also share the exteriorpanels as a component. One should notforget the importance of aesthetics andcladding in an approach to the market.By the end of the project the goal is to bringthese products up to a technology readinesslevel of 7, which is a demonstration ofpilot production. For this we target theintegration of the products in two buildingsin Europe: one in Spain and the other inSweden. For performance and marketabilityit is important to test our products in thedisparate climates of Europe.Newsletter Issue 1 - February 20155

Similar magazines