the Flashing Kit - Step-by-Step Guide - The Rooflight Company
the Flashing Kit - Step-by-Step Guide - The Rooflight Company
the Flashing Kit - Step-by-Step Guide - The Rooflight Company
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Version: CR_201INST Rev C<strong>the</strong> <strong>Flashing</strong> <strong>Kit</strong> - <strong>Step</strong>-<strong>by</strong>-<strong>Step</strong> <strong>Guide</strong>
| <strong>the</strong> <strong>Flashing</strong> <strong>Kit</strong> - <strong>Step</strong>-<strong>by</strong>-<strong>Step</strong> <strong>Guide</strong>> Parts ListThis guide must be used in conjunction with <strong>the</strong> relevant rooflight Installation Manual.A2xflashingB1x jambflashingoff-cutC1xleft handjamb flashingD 1xright handjamb flashingE1xroofingfeltF2xsoakerImportantLay a continuous thick bead of low modulus neutral cure siliconeacross <strong>the</strong> cill flashing for <strong>the</strong> full width of <strong>the</strong> rooflightJUST PRIOR to installation of <strong>the</strong> rooflight baseplate.
<strong>the</strong> <strong>Flashing</strong> <strong>Kit</strong> - <strong>Step</strong>-<strong>by</strong>-<strong>Step</strong> <strong>Guide</strong> |> Install <strong>the</strong> cill flashing> Jamb flashing trim heightInstall <strong>the</strong> cill flashing (part A).1If not already in place, four rows of battens up <strong>the</strong> jambs will be required - do not nail home <strong>the</strong> ends of <strong>the</strong> battensnext to <strong>the</strong> rooflight.2
| <strong>the</strong> <strong>Flashing</strong> <strong>Kit</strong> - <strong>Step</strong>-<strong>by</strong>-<strong>Step</strong> <strong>Guide</strong>> Jamb flashing trim height3Clip <strong>the</strong> jamb flashing off-cut (part B) onto <strong>the</strong> baseplate rollover and align with <strong>the</strong> bottom edge of <strong>the</strong> baseplate.NOTE: <strong>The</strong> positions for <strong>the</strong> guide notches were derivedfrom a number of typical roof tiles and roof constructions.Depending on <strong>the</strong> roof make-up specific to <strong>the</strong> project, itmay be necessary to trim <strong>the</strong> Jamb flashings to a height notspecified.4Dry tile four courses of tiles at <strong>the</strong> cill. Use part B to determine whe<strong>the</strong>r or not it is required to trim down <strong>the</strong> jambflashings. If <strong>the</strong> top edge of part B sits above <strong>the</strong> general line of <strong>the</strong> roof finish, trimming is required.
<strong>the</strong> <strong>Flashing</strong> <strong>Kit</strong> - <strong>Step</strong>-<strong>by</strong>-<strong>Step</strong> <strong>Guide</strong> |> Trimming <strong>the</strong> jamb flashing extrusion> Lightly tack jamb battensNOTE: Use of a suitable straight edge is recommended whenscoring <strong>the</strong> jamb flashing extrusions.Lay <strong>the</strong> jamb flashings down on a clean and dry flat surface. Fold back <strong>the</strong> foam and use a sharp stanley knife tofirmly score along <strong>the</strong> entire length of <strong>the</strong> extrusion several times. <strong>The</strong>n break off <strong>the</strong> excess extrusion.5<strong>The</strong> remainder of <strong>the</strong> battens up <strong>the</strong> jambs (if in place) should again not be driven home next to <strong>the</strong> rooflight - atmost, lightly tack in place only.6
| <strong>the</strong> <strong>Flashing</strong> <strong>Kit</strong> - <strong>Step</strong>-<strong>by</strong>-<strong>Step</strong> <strong>Guide</strong>> Install <strong>the</strong> jamb flashings7Orientate one of <strong>the</strong> jamb flashings ( ei<strong>the</strong>r part C or part D) and clip onto <strong>the</strong> baseplate rollover - <strong>the</strong> excess felt on<strong>the</strong> jamb flashing should be towards <strong>the</strong> head of <strong>the</strong> rooflight.8<strong>The</strong> felt attached to <strong>the</strong> jamb flashings should go OVER <strong>the</strong> general roofing membrane but UNDER <strong>the</strong> battens whichmay be in place. Repeat on <strong>the</strong> opposite side.
<strong>the</strong> <strong>Flashing</strong> <strong>Kit</strong> - <strong>Step</strong>-<strong>by</strong>-<strong>Step</strong> <strong>Guide</strong> |> Install <strong>the</strong> jamb flashings> Install <strong>the</strong> head tilting filletIf <strong>the</strong> excess felt attached to <strong>the</strong> jamb flashings meets <strong>the</strong> next lap in <strong>the</strong> general roofing membrane, ensure it istucked into this lap.9Install <strong>the</strong> tilting fillet at <strong>the</strong> head of <strong>the</strong> rooflight.10
| <strong>the</strong> <strong>Flashing</strong> <strong>Kit</strong> - <strong>Step</strong>-<strong>by</strong>-<strong>Step</strong> <strong>Guide</strong>> Install <strong>the</strong> head flashing11Lay <strong>the</strong> head flashing (part A) over <strong>the</strong> head fillet. Fold, boss and tuck <strong>the</strong> flashing back into <strong>the</strong> baseplate rollover.Again, if this meets <strong>the</strong> next lap in <strong>the</strong> general roofing membrane, ensure it is tucked into this lap as shown.12<strong>The</strong>re may be a requirement to trim <strong>the</strong> head flashing around <strong>the</strong> jamb battens depending on <strong>the</strong>ir positioning. Thiscan be done with a sharp stanley knife.
<strong>the</strong> <strong>Flashing</strong> <strong>Kit</strong> - <strong>Step</strong>-<strong>by</strong>-<strong>Step</strong> <strong>Guide</strong> |> Integrate <strong>the</strong> rooflight feltLay <strong>the</strong> strip of roofing felt (part E) over <strong>the</strong> head flashing and ensure it tucks UNDER <strong>the</strong> next lap in <strong>the</strong> generalroofing membrane.13<strong>The</strong> combination of <strong>the</strong> head flashing and <strong>the</strong> roofing felt being lapped in this way, ensures moisture will run up andover <strong>the</strong> tilting fillet, onto <strong>the</strong> baseplate and finally off <strong>the</strong> roof.14
| <strong>the</strong> <strong>Flashing</strong> <strong>Kit</strong> - <strong>Step</strong>-<strong>by</strong>-<strong>Step</strong> <strong>Guide</strong>> Install <strong>the</strong> soakers>Tile <strong>the</strong> jambs15When laying <strong>the</strong> second course of tiles at <strong>the</strong> jambs, soakers (part F) are required; one per jamb. Lay part F over <strong>the</strong>edge of <strong>the</strong> tile and ensure it tucks BEHIND <strong>the</strong> jamb flashing extrusion as shown.NOTE: Before completely tiling <strong>the</strong> rooflight in, werecommend that a final inspection of <strong>the</strong> jamb flashing trimheight is carried out. To replace <strong>the</strong> jamb flashings once tiledis likely to involve stripping back <strong>the</strong> roof.16Use <strong>the</strong> edge of <strong>the</strong> jamb flashing as a guide to tile up to and tile <strong>the</strong> jambs. Ensure <strong>the</strong> wea<strong>the</strong>ring foam attached to<strong>the</strong> jamb flashings is folded down and away from <strong>the</strong> rooflight when laying <strong>the</strong> tiles.
<strong>the</strong> <strong>Flashing</strong> <strong>Kit</strong> - <strong>Step</strong>-<strong>by</strong>-<strong>Step</strong> <strong>Guide</strong> |> Tile <strong>the</strong> head<strong>The</strong> head of <strong>the</strong> rooflight can now be tiled. We recommend <strong>the</strong> use of eaves tiles.17Complete <strong>the</strong> tiling around <strong>the</strong> head of <strong>the</strong> rooflight accordingly.18
<strong>the</strong> <strong>Flashing</strong> <strong>Kit</strong> - <strong>Step</strong>-<strong>by</strong>-<strong>Step</strong> <strong>Guide</strong> |> Fit <strong>the</strong> rooflight casementWith <strong>the</strong> tiling complete, <strong>the</strong> rooflight casement can be fitted and secured to <strong>the</strong> rooflight baseplate.You have now completed <strong>the</strong> installation of <strong>the</strong> flashing kit.19A trading name of <strong>the</strong> Metal Window <strong>Company</strong> Ltd.Wychwood Business Centre Milton RoadShipton-under-Wychwood OX7 6XUTel: 01993 833 108Fax: 01993 831 066Email: info@<strong>the</strong>rooflightcompany.co.ukWeb: www.<strong>the</strong>rooflightcompany.co.uk<strong>The</strong> Conservation® rooflight is a registered trademark of <strong>The</strong> Metal Window <strong>Company</strong> Ltd.In <strong>the</strong> interest of continuous product development, it may be necessary to amend specification without alteration to technical literature.All drawings and designs are <strong>the</strong> Copyright and Designright of <strong>The</strong> Metal Window <strong>Company</strong> Ltd.