10.07.2015 Views

Intregated water management system at Latur - SPML

Intregated water management system at Latur - SPML

Intregated water management system at Latur - SPML

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Case StudyL<strong>at</strong>ur, loc<strong>at</strong>ed in the Mar<strong>at</strong>hwada region of Maharashtra is headquarter forL<strong>at</strong>ur district. With an area of 32.56 sq km, it has popul<strong>at</strong>ion of over five Lacpeople which is growing steadily. Being the district headquarters, L<strong>at</strong>ur isan important administr<strong>at</strong>ive centre th<strong>at</strong> houses many regional offices of thest<strong>at</strong>e government. The presence of reputed educ<strong>at</strong>ional institutes coupledwith quality healthcare facilities and infrastructure services makes the city an<strong>at</strong>tractive destin<strong>at</strong>ion. Apart from the resident popul<strong>at</strong>ion, L<strong>at</strong>ur has a flo<strong>at</strong>ingpopul<strong>at</strong>ion of about 25-30 thousands th<strong>at</strong> visit the city everyday for varioustrade and commerce rel<strong>at</strong>ed activities.www.spml.co.inThe ChallengeThe <strong>w<strong>at</strong>er</strong> supply to the L<strong>at</strong>ur city was earlier managed by L<strong>at</strong>ur MunicipalCorpor<strong>at</strong>ion (LMC) and had faced major problems in terms of supplying<strong>w<strong>at</strong>er</strong> to its citizens due to source limit<strong>at</strong>ions and very poor <strong>w<strong>at</strong>er</strong> supplyaccounting. The <strong>w<strong>at</strong>er</strong> supply to the city during the normal season was 75litre per capita daily (LPCD) with availability of <strong>w<strong>at</strong>er</strong> for 1 hour once in 10days to about 70% of the popul<strong>at</strong>ion. During the summer season, the <strong>w<strong>at</strong>er</strong>supply was further reduced to about 40 LPCD and 30 to 40 tankers per daywere engaged to manage shortfall of <strong>w<strong>at</strong>er</strong> supply. The residents were facingextreme <strong>w<strong>at</strong>er</strong> shortage and many times, violence erupted for <strong>w<strong>at</strong>er</strong>. In termsof coverage, about 30% of the popul<strong>at</strong>ion was still not covered by piped<strong>w<strong>at</strong>er</strong> supply. From LMC, the <strong>w<strong>at</strong>er</strong> <strong>management</strong> function was transferred toMaharashtra Jeevan Pradhikaran (MJP) to infuse oper<strong>at</strong>ional improvementsand finance for various capital schemes.L<strong>at</strong>ur W<strong>at</strong>er Supply SystemThe <strong>w<strong>at</strong>er</strong> supply <strong>system</strong> of the city consists of intake works from 3 loc<strong>at</strong>ionsnamely, Sai head works, Nagzari head works and Dhanegaon head works.The Sai head works scheme is loc<strong>at</strong>ed <strong>at</strong> a distance of 8 km from the city andhas weir on the river Manjra. The Nagzari KT weir is loc<strong>at</strong>ed <strong>at</strong> a distance of 12km on the Manjara river and the two sources together can supply about 35MLD <strong>w<strong>at</strong>er</strong> to the city. There has been number of up-grad<strong>at</strong>ion and expansionafter the original scheme by works executed under Stage-II, Part-I (1970) andStage-III (1989) and Stage-IV, Part-II (2001). The 3 rd source Dhanegaon wascommenced in 2005 and is loc<strong>at</strong>ed <strong>at</strong> a distance of 60 km from the city withintake on Manjara Dam. LMC has undertaken a source augment<strong>at</strong>ion projectunder stage V. This scheme involved bulk <strong>w<strong>at</strong>er</strong> transmission over 65 km toaddress the ever increasing demands. There has been rehabilit<strong>at</strong>ion of old<strong>w<strong>at</strong>er</strong> works and distribution <strong>system</strong>s expansion.Distribution and CoverageThe <strong>w<strong>at</strong>er</strong> is processed by three <strong>w<strong>at</strong>er</strong> tre<strong>at</strong>ment plants with an aggreg<strong>at</strong>edesigned capacity of 109 MLD and utilized capacity of 50 MLD (approx).The tre<strong>at</strong>ed <strong>w<strong>at</strong>er</strong> is pumped by six pumping st<strong>at</strong>ions to eleven elev<strong>at</strong>edservice reservoirs (ESRs) loc<strong>at</strong>ed <strong>at</strong> different parts of the city. The capacityof these ESRs put together is 25.50 ML with 12 hours storage. Thedistribution network has 95 km of transmission mains and 476 km ofdistribution lines.www.ea<strong>w<strong>at</strong>er</strong>.comEverythingAboutW<strong>at</strong>er | September 2011163

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!