Complex lab for CCNA

wmii.uwm.edu.pl

Complex lab for CCNA

3. We continue staking the sewer lines and manholes as needed and are providingthe contractor with the appropriate cut sheets establishing the grades and lines.4. We continue providing lateral stakes for the residents to physically stake theirlateral locations. These stakes are being handed out by the Resident ProjectRepresentatives (inspection staff).PLAN REVISIONS:5. As the Board may be aware, we have encountered additional revision to the plansnecessitated by various items this past month.STATUS OF PERMITS:a. Another section of Bethel (in and around Strawberry Alley) we wereasked to review a revision to the sewer line to accommodate the localresidents. We expect to have this review completed shortly (in advance ofthe contractor working) and will report our findings to the Board. We arecurrently working on this matter and have a plan revision to presentto the Board for their consideration.b. The construction in Bethel encountered a storm sewer pipe andnecessitates a revision to the sewer line layout (crossing under LancasterAvenue). We are currently working with the contractor to complete themost cost effective alternative for this conflict. No further progress onthis matter from last month.6. As a follow up to the building permits from the Township. Subsequent to thedetermination (that the BTMA was exempt from the UCC requirements) we werein a receipt of a letter identifying three outstanding items that need furtherdiscussion. We have recently contacted the review agency to discuss furtherand are awaiting a return phone call.PUBLIC RELATIONS/ MISC. INFORMATION:7. We continue updating items on our website and certainly welcome any furthersuggestions on how this may be used for disseminating the project information.ACTION ITEM STATUS:8. The Draft technical manual prepared by Terry Parish has not been reviewed as ofyet, but we will keep this as a secondary priority as the review of submittals (shopdrawings, development plans, etc.) diminishes.9. This office has a working draft of the lateral specifications but have notcompleted them for distribution to the Board as of yet, but we will keep this as asecondary priority as the review of submittals (shop drawings, development plans,etc.) diminishes.10. As a result of some discussions with the PADEP in regards to futuredevelopments within the sewer service area and PADEP requirements we areresearching additional information for the Board’s further evaluation and input on


• What is the password for “.pka” file?• How can I use this “.pka” file for exam/assessment?• Can I add/remove/change something in the topology?© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 6


© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 7


1. change time settings (countdown ?)2. Disable Dynamic Checking (Dynamic Percentage Feedback)3. Lock “Check Result” & “Reset Activity”4. Set/Change Password for activity© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 8


http://cisco.netacad.net/cnams/content/templates/LibraryHome.jsp?#/resource/lcms/cnams_site/english/generic_site_areas/library/course_catalog/PT_Tut_Training_Matl.html© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 10


Thank you.

More magazines by this user
Similar magazines