11.07.2015 Views

tyne and wear building control building regulation charges

tyne and wear building control building regulation charges

tyne and wear building control building regulation charges

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

If the basis on which the charge has been determined changes, the Local Authority may refund or request asupplementary charge. The Authority will provide a written statement setting out the basis <strong>and</strong> method ofcalculation for the refund/ supplementary charge.SCALE OF CHARGESThis information sheet is for guidance only. All <strong>charges</strong> specified are derived from the current Scheme ofCharges prepared by the Authority to which reference may be made if clarification is required, as it contains fulldetails of the scheme <strong>and</strong> the provisions of The Building (Local Authority Charges) Regulations 2010.All fees are subject to VAT at the appropriate rate (except Regularisation charge).There are two methods used by the Authority to establish the Building Regulation Charge:• St<strong>and</strong>ard charge – see table below• Individually Determined Charge – including dwellings with floor areas greater than 300m²; <strong>and</strong> reversions.If your Building Regulation application requires an individually determined charge – please contact the relevantBuilding Control team: with the location <strong>and</strong> a full description of the proposed <strong>building</strong> work.The st<strong>and</strong>ard <strong>charges</strong> have been set by the Authority on the basis that the <strong>building</strong> work does not consist of,or include, innovative or high risk construction techniques <strong>and</strong>/or the duration of the <strong>building</strong> work fromcommencement to completion does not exceed 12 months.The <strong>charges</strong> have also been set on the basis that the design <strong>and</strong> <strong>building</strong> work is undertaken by a person orcompany that is competent to carry out the design <strong>and</strong> <strong>building</strong> work referred to in the st<strong>and</strong>ard <strong>charges</strong>tables. If not, the work may incur supplementary <strong>charges</strong>.Contact Details:Newcastle Building Control ServicesNewcastle City CouncilCivic CentreNewcastle upon TyneNE1 8PBTel: 0191 2116181, 211 6190 or 211 6184Fax: 0191 211 4889Email: <strong>building</strong>.<strong>control</strong>@newcastle.gov.ukWeb: www.newcastle.gov.uk/core.nsf/a/<strong>building</strong><strong>control</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!