11.07.2015 Views

Tome Architecture and management of a geological repository - Andra

Tome Architecture and management of a geological repository - Andra

Tome Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5 – B waste <strong>repository</strong> zoneThe application <strong>of</strong> light rock support (bolts <strong>and</strong> shotcrete) may be envisaged to ensure that safeconditions are provided on the construction site <strong>and</strong> for the operating activities.Filling the clearance space between the packages <strong>and</strong> the granite ro<strong>of</strong> may require the installation <strong>of</strong>suitably shaped concrete elements.The slab is cut out with a slight slope towards the centre <strong>of</strong> the disposal tunnel to facilitate cleaningoperations prior to the construction <strong>of</strong> the final concrete slab.Lateral spacing between the columns <strong>of</strong> stacked packages is 10 cm. The clearance between cell walls<strong>and</strong> packages is 10-20 cm. The space between each row <strong>of</strong> packages in the longitudinal plane isminimised.The assessed accumulated length <strong>of</strong> the disposal chambers produces the following data for each wastegrouping <strong>and</strong> per inventory model scenario:Linéaire de chambres de stockage- Déchets B non thermiques -B6.1; B6.2; B6.3; B6.5; B7.3; B8.3B3.3.2; B8.1; B4112120B3.1.1; B3.1.3; B3.2.2; B7.1B3.3.3; B6.45148B3.3.4; B8.2B3.1.2B2.1160141190276B2.2627B3.2.1610 100 200 300 400 500 600 700linéaire (m)Scénario S1 a Scénarios S1 b et c Scénario S2Figure 5.4.5Assessment <strong>of</strong> the length in metres <strong>of</strong> the disposal chambers for non-exothermicB waste5.4.2.3 Dimensioning <strong>and</strong> description <strong>of</strong> slightly-exothermic waste tunnelsIn the slightly exothermic B waste disposal tunnels (types B1 <strong>and</strong> B5), the packages must be arrangedso as is not to exceed the temperature criterion <strong>of</strong> 70°C in the concrete (cf. 5.2.2.3) in order to controlthe behaviour <strong>of</strong> the packaging concrete <strong>and</strong> radionuclides inside the cell.Dimensioning calculations [42] have been made to analyse the sensitivity <strong>of</strong> the potentialarrangements to the variability <strong>of</strong> thermal characteristics presented by French granites[7] (Table 5.4.1).Dossier 2005 Granite - ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL REPOSITORY133/228

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!