Alaska District<strong>IPS</strong> <strong>Review</strong>Owner <strong>Review</strong>AKStep 5: General <strong>Schedule</strong> <strong>Review</strong> (continued)Constraints:• Match contract dates• No additional constraints are added• Correct “Constraint Types” were usedConstruction Scheduling<strong>Module</strong> <strong>#2</strong> <strong>IPS</strong> <strong>Review</strong>