11.07.2015 Views

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>of</strong> the pre-construction activities, the contractor is required to per<strong>for</strong>m a condition survey <strong>of</strong>buildings adjacent to the roadways as a basis <strong>for</strong> establishing preconstruction buildingassessments <strong>for</strong> defense or verification <strong>of</strong> construction damage claims. It will be necessary<strong>for</strong> the Contractor to provide a vibration monitoring plan as part <strong>of</strong> his construction activities.Ground particle velocities at buildings adjacent to work activities should not exceed 0.25 inchper second.C. Contractor shall protect all property that may be affected by his work or operations. Thelocation and extent <strong>of</strong> underground and covered facilities are not guaranteed and theContractor is cautioned to proceed with care in order to prevent the undermining or damageto existing structures, piping, or facilities.D. In the event any <strong>of</strong> the Contractor's activities were to disrupt or endanger any facilities, heshall at his own expense make all necessary repairs or replacements necessary to correctthe situation to the satisfaction <strong>of</strong> the Engineer. Such work shall progress continuously tocompletion on a 24-hour per day, seven workday basis. The Contractor shall be responsible<strong>for</strong> the services <strong>of</strong> repair crews on call 24 hours per day <strong>for</strong> emergencies that arise involvingwork under this Contract.1.05 SITE CONDITIONSA. Site Investigation and Representation1. The Contractor acknowledges satisfaction as to the general nature and location <strong>of</strong> the work,the general and local conditions, particularly those bearing upon availability <strong>of</strong>transportation, availability <strong>of</strong> labor, water, electric power, roads, and uncertainties <strong>of</strong>weather, or similar physical conditions, the character <strong>of</strong> equipment and facilities neededpreliminary to and during the prosecution <strong>of</strong> the work, and all other matters which can in anyway affect the work or the cost there<strong>of</strong> under this contract.2. Failure by the Contractor to become acquainted with the physical conditions and all theavailable in<strong>for</strong>mation will not relieve the Contractor from responsibility <strong>for</strong> properlyestimating the difficulty or cost <strong>of</strong> successfully per<strong>for</strong>ming the work.3. The Contractor warrants that as a result <strong>of</strong> examination and investigation <strong>of</strong> all the a<strong>for</strong>esaiddata, the Contractor can per<strong>for</strong>m the work in a good and workmanlike manner and to thesatisfaction <strong>of</strong> the Owner. The Owner assumes no responsibility <strong>for</strong> any representationsmade by any <strong>of</strong> its <strong>of</strong>ficers or agents during or prior to the execution <strong>of</strong> this Contract, unless(1) such representations are expressly stated in the Contract, and (2) the Contractexpressly provides that the responsibility there<strong>for</strong>e is assumed by the Owner.B. In<strong>for</strong>mation on Site Conditions1. Subsurface Investigations(a) The Contractor shall be responsible <strong>for</strong> having determined to his satisfaction, prior tothe submission <strong>of</strong> his bid, the nature and location <strong>of</strong> the work, the con<strong>for</strong>mation <strong>of</strong> theground, the character and quality <strong>of</strong> the substrata, the types and quantity <strong>of</strong> materialsto be encountered, the nature <strong>of</strong> the groundwater condition, the character <strong>of</strong>equipment and facilities required preliminary to and during the per<strong>for</strong>mance <strong>of</strong> thework, the general and local conditions and all other matters which can in any wayaffect the work under this Contract. The prices established <strong>for</strong> the work to be doneshall reflect all costs pertaining to the work. Any claims <strong>for</strong> extras based on thesubstrata or ground water table conditions will be disallowed.Maintenance & Protection <strong>of</strong> Properties Section 01020-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!