Timeline of Events12 September 2007 (continued) EPA issued CERCLA Order to RP to preventstack failure – gave some leeway forcontrolled release GST pump load arrived & staged @ SectorHouston-Galveston Agrifos commenced controlled release intocounty ditch with one 10” and one 8” 8 line;pumping from top of stacks as well; notifiedneighboring facilities and waterway uses. UC made adjustments to IAP to deal w/TS