INTEGRATED WATER RESOURCE MANAGEMENT II

INTEGRATED WATERRESOURCE MANAGEMENT IIANNUAL REPORT REV 1YEAR 2(JANUARY– DECEMBER 2010)REPORT NO. 18Contract No. EPP-I-00-04-00024-00 Task Order No. 06January 2011International Resources Group1211 Connecticut Avenue, NW, Suite 700Washington, DC 20036202-289-0100 Fax 202-289-7601www.irgltd.comDISCLAIMERThe author’s views expressed in this publication do not necessarily reflect the views of the United States Agency forInternational Development or the United States Government.


TABLE OF CONTENTSTABLE OF CONTENTS ........................................................................................ iACRONYMS ........................................................................................................... ii1. SUMMARY .................................................................................................... 12. ACCOMPLISHMENTS DURING THE REPORT PERIOD ............... 63. ACTIVITIES PLANNED FOR NEXT QUARTER .............................. 254. PROBLEMS AND ISSUES ........................................................................ 29ANNEX A: MONITORING AND EVALUATION PLAN UPDATE ...... 34ANNEX B: ANNUAL FINANCIAL REPORT .............................................. 41ANNEX C: TABLE OF REPORTS .................................................................... 45ANNEX D: TECHNICAL ASSISTANCE TABLE .......................................... 48ANNEX E: ANNUAL TRAINING REPORT ................................................. 50ANNEX F: PROCUREMENT STATUS REPORT ......................................... 58Annual Report Year 2 (January – December 2010)i


ACRONYMSAUC American University CairoAPRP Agricultural Policy Reform ProgramARC Ministry of Agriculture and Land Reclamation Agriculture Research CenterBCWUA Branch Canal Water User AssociationCTO Cognizant Technical OfficerDWAT District Water Advisory TeamEEAA Egyptian Environmental Affairs AgencyEIA Environmental Impact AssessmentEPADP Egyptian Public Authority for Drainage ProjectsEPIQ Environmental Policy and Institutional Governance (Indefinite Quantity Contract)GDA Global Development AllianceGOE Government of EgyptGPS–GIS Global Positioning System–Geographic Information SystemGTZ Gesellschaft für Technische Zusammenarbeit (the German International DevelopmentAgency)HCWW The Holding Company for Water and WastewaterIAS Irrigation Advisory ServiceIIIMP Integrated Irrigation Improvement and Management ProjectIIP Irrigation Improvement ProjectIQC Indefinite Quantity ContractIRG International Resource GroupIRU Institutional Reform Unit of MWRIIWMD Integrated Water Management DistrictIWMU Integrated Water Management UnitIWRM I USAID/Egypt funded LIFE Integrated Water Resource Management Project (2004-2008)IWRM II USAID/Egypt funded Integrated Water Resources Management II (2009-2012)JICA Japan International Cooperation AgencyLIFE Livelihoods and Income from the EnvironmentLOE Level of EffortLOP Life of ProjectM&E Monitoring and EvaluationMALR Ministry of Agriculture and Land ReclamationMISD Matching Irrigation Supply and Demand ProgramMOH Ministry of HousingMSEA Ministry of State for Environmental AffairsMWRI Ministry of Water Resources and IrrigationO&M Operation And MaintenanceOJT On-the-job trainingPMP Performance Monitoring PlanPPP Private–public partnershipPSD Office of Productive Sector DevelopmentRDNQ Renewal And Rehabilitation Of North Qena DrainsRFTOP Request for Task Order ProposalRWMO Regional Water Management OrganizationSWERI Soil, Water and Environment Research InstituteTA Technical AssistanceTNA Training Needs AssessmentUS United StatesUSAID United States Agency for International DevelopmentWADA Water & Development AllianceWCU Water Communication UnitWQU Water Quality UnitWUA Water User Associationsii Annual Report Year 2 (January – December 2010)


1. SUMMARYInternational Resource Group (IRG) under the USAID/Egypt Integrated Water ResourcesManagement II Project (IWRM II), Contract No. EPP-I-00-04-00024-00 Task Order No. 06 isresponsible for assisting the Government of Egypt (GOE) in promoting integrated water resourcesmanagement. The period of performance of the project is from January 25, 2009 to September 30,2012.The purpose of this report is to present the status and performance of IWRM II for Year 2 coveringthe period from January to December 2010. The Annual Report summarizes the previous year’sactivities and accomplishments against the respective Annual Work Plan indicators, and serves as thetool by which USAID/Egypt can monitor project performance. The report includes status ofpersonnel and project activities, and summarizes services delivered and progress towards achievingresults identified in the Project Monitoring Plan (PMP). It documents both successes and failures ofthe project interventions, and discusses reasons for shortcomings and recommends actions toovercome them. The Annual Report has the following content: summary; accomplishments duringthe year; planned activities for the following quarter (January – March 2011); and a section onproblems, issues, and lessons learned.The following items have been included as annexes: Annex A: Monitoring and Evaluation PlanUpdate, Annex B: Annual Financial Status Report, Annex C: List of Project Reports, Annex D:Status of Technical Assistance, Annex E: Training Report, and Annex F: Procurement Status Report.A summary of the activities and accomplishments for the Project Year 2 (January to December 2010)follows:Mr. Richard Rousseau, USAID Office Director/PSD, departed Egypt in August. He was replacedby Mr. John Irons. Mr. John Pasch, USAID Engineer, began his assignment as water team leader inSeptember 2010. Mr. James Bever replaced Dr. Hilda Arellano as USAID Mission Director inSeptember.Dr. Hussein El-Atfy continued as the MWRI Senior Undersecretary, Chairman of IrrigationDepartment, and Head of USAID/MWRI Steering Committee.USAID decided not to extend the Implementation Letter (IL) providing financial support to MWRIIntegrated Water Management Unit (IWMU). The IWMU assisted with implementation of IWRM IIactivities and coordinated project activities on behalf of MWRI. The IL ended on 31 March 2010. Asa consequence, the IWMU was dissolved by the MWRI on 1 September. The IWMU coordinatorand the staff were reassigned to other sectors in the Ministry. The MWRI Project SteeringCommittee took over the responsibility for coordinating all IWRM II activities between MWRI andUSAID. Eng. Nabila Bahaa (General Director for M&E, Irrigation Department) and Eng. TarekAwaad Ibrahim (Head of Irrigation Sector, Technical Office) were appointed as MWRI pointpersons for the project. In September, two MWRI staff members previously with the IWMU, wereapproved for leave without pay and were hired as consultants by the project. Four MWRI staffmembers were assigned as regional office coordinators to support the Mansoura and ZagazigRegional Offices; two for each office.IWRM II USAID/MWRI Steering Committee meeting was held on 7 July to review status of projectactivities.Annual Report Year 2 (January – December 2010) 1


USAID Mission Director, James Bever, visited project sites in Damietta Governorate in the EastNile Delta on 12-13 December. He was accompanied by Dr. Hussein El Atfy (Senior Undersecretary,Chairman of Irrigation Department, and Head of USAID/MWRI Steering Committee), and Dr.Noha Bakr (Assistant Minister, Ministry of International Cooperation). John Irons (Director ofProductive Sector/USAID), Amany Selim (USAID/Program Office), and Eng. Wafaa Faltaous(CTO/USAID) extended their visit through 15 December visiting various IWMDs and BCWUAs inthree additional East Nile Delta Directorates.Meetings were held with USAID CTO (Eng. Wafaa Faltaous) on a regular basis until the fourthquarter.Regular project coordination meetings were held between IRG TA team and the IWMU before itsclosure.USAID/MWRI/IRG monthly coordination meetings were held in July, August, October, andDecember.IWRM II staff attended the Regional Water Management Organization (RWMO) Workshop inHurghada (January 22-24) sponsored by MWRI Institutional Reform Unit (IRU) and GTZ.IWRM II staff participated in the MWRI Institutional Reform Unit workshop in Alexandria on 12September on the results of a study on IWRM/BCWUAs requested by H.E. Minister MWRI.IWRM II staff attended the Dutch funded Fayoum Water Users Organization Project final workshopin Ain Sukhna on 4 December.The “Information Systems Data Management Workshop” sponsored by IWRM II was held 16December at MWRI, Cairo for all USAID IWRM Phase I & II General Directors as well as twoDistrict Managers from each of 8 Directorates.Cheryl Groff began work as IWRM II LTTA Senior Strategic Communication and Public AwarenessSpecialist for a one year assignment on 17 January 2010.Iman Choucri began as IWRM II project Finance Manager on February 1, 2010 replacing Alaa Hafez.Assignments by short term expat specialists during 2010 included:Russ Misheloff, IWRM II Home Office Project Manager and Senior Economist, carried outassignments from April 29 – May 12 & August 14 -15 in support of Task 1.4 Wastewater Reuse andto discuss management issues with USAID & MWRI.Jim Dempsey, Expat Institutional/Organizational Development Specialist, completed anassignment (November 8, 2009 - January 17, 2010) in support of Task 1.4 Waste Water Reuse.Dr. Stan Peabody, Sociologist, carried out an assignment from October 15 - 29 in support of Task1.1 Formation and Development of Branch Canal Water User Associations and Task 1.2 SustainableLocal Financing for Canal and Drain Maintenance.Dr. Tom S. Sheng, Water Resources Information Specialist, carried out an assignment fromOctober 24 – November 12, 2010 to support Task 2.2 Formation and Development of IntegratedWater Management Districts and Task 2.3 Establishment of Information Management Systems forSustainable Water Resources Management.Firras Traish, Procurement/Financial Specialist, carried out an assignment from 30 October –10 November to review project administrative procedures and assist in preparation of the update ofthe Life of Project Procurement Plan.Dr. Mark Svendsen, M&E Specialist, carried out an assignment from December 2-13 2010 toupdate the PMP.2 Annual Report Year 2 (January – December 2010)


Assignments by short term local specialists during 2010 included:Eng. Sami Yacoub, Local Senior Organization/Institutional Development Specialist,completed his assignment in support of the follow-up to the GDA for Environmental Services forImproving Water Quality Management in Egypt.Dr. Walid Yehia Sallam, local Agricultural Economist, continued his assignment in support ofTask 1.3 Improvements in Water Productivity and Efficiency.Dr. Moamen El Sharkawy and Eng. Amira Abdel Hady, local Institutional/ OrganizationalDevelopment Specialists, began assignments in September to support Task 1.1 Formation andDevelopment of BCWUAs, Task 1.2 Sustainable Local Financing for Canal and Drain Maintenance,and related cross-cutting components.The Year 1 Annual Report and 3 quarterly progress reports were submitted to USAID.Draft Annual Year 3 Work Plan was submitted to USAID and MWRI on 1 December 2010.Under Task 1.1: Formation and Development of Branch Canal Water User Associations(BCWUA) 624 BCWUAs have been established to cover all the branch canals in the 45 IntegratedWater Management Districts (IWMDs) in the East Nile Delta. Water Advisory Teams have beenestablished in each IWMD involving 615 MWRI staff (17.8 % women). Elections were held for eachof the 624 BCWUA to select water user representatives (WURs) and Boards. 18,361 representatives(4% women) and 5154 board members (9.2 % women); and 624 chairpersons (2 women) wereelected. MWRI decrees have been signed authorizing each of the BCWUAs. Activation of theBCWUAs was started. Memorandum of Understanding (MOU) between MWRI and the BCWUAsand internal regulations (IR) for each of the 624 BCWUAs were prepared. Maintenance needsassessments of the BCWUAs have started in all IWMDs. Monthly Water Advisory Teamcoordination meetings were held on a regular basis. Training courses were held with over 1300participants (9% women) on BCWUAs' Chairperson Orientation (14 events), BCWUA'sMemorandum of Understanding & Internal Regulations (9 events), and BCWUA's ActivationWorkshop (7 events).For Task 1.2: Sustainable Local Financing for Canal and Drain Maintenance field activitieswill begin after BCWUA activation. MWRI recently recommended that the project proceed withimplementation even though the approval of the amendment to Law 12 giving BCWUAs legalstanding is still with the People’s Assembly Agricultural & Irrigation Committee. Guidelines for costsharing by BCWUAs are under preparation. Collection of reports and studies from the variousMWRI projects and organizations evaluating Branch Canal O&M activities, costs, and cost sharingby users continued. Several meetings were held with key MWRI officials (Head of Irrigation Sector,IS Technical Office Engineers, General Director of Water Distribution). Data concerning actualBCWUAs self-financed activities from IWRM I areas is under collection and review. Project staffparticipated in several meetings and workshops organized by Central Directorate Irrigation AdvisoryService (CDIAS) addressing this topic.Under Task 1.3: Improvements in Water Productivity and Efficiency pilot and demo activitiescontinued with BCWUAs on El Manshar branch canal, Abu Kebeer IWMD, West SharkiaDirectorate, and several branch canals in W. Belbeis IWMD, Qualubia Directorate. Ministry ofAgriculture and Land Reclamation (MALR) appointed Dr. Abd El Ghany El Guindy (Soil, Waterand Environment Research Institute, Agriculture Research Center) as project coordinator. At theoutset a total area of 37.5 feddan was provided by 14 members of the El Manshar BCWUA fordemonstration of high-value , low- water use crops (HVC). Numerous meetings and workshops wereheld with more than 500 participants (2% women) to introduce HVC with MWRI, MALRAgriculture Extension staff, and BCWUA members on subjects such as credit programs for irrigationsystem improvements; marketing skills, marketing & contract negotiations; winter season HVCs; andAnnual Report Year 2 (January – December 2010) 3


soil testing. The project collaborated with Egyptian Spice and Herb Export DevelopmentAssociation (ESHEDA), Ismailia Poultry Company, Soil Water & Environment Research Institute,Agriculture Research Center (SWERI/ARC), Union of Producers & Exporters of Horticulture Crops(UPEHC), Farm Frites (FF), Sandy Valley Seed Company, and Pasta & Juice Co. Before the end ofthe winter planting contracts were signed through the BCWUAs from both pilot areas withESHEDA for the cultivation of sesame and basil involving 113 feddan (fd) and 44 farmers. Theproject also provided marketing assistance and access to seeds for yellow corn on 2,700 fd for 2,500farmers in W. Belbeis. The BCWUAs are now working independently with the following buyers forfruits, vegetables and spices: the United Brothers Co. for Strawberry Trade and Nurseries'Distribution; Al Awady for Trade and Supplies in Al Obour Market; Hebeish Sons (Sammour); andSpicy Land Co.For Task 1.4: Wastewater Reuse the “Feasibility Study on Wastewater Reuse” was completedand sent to USAID and the Holding Company for Water and Wastewater (HCWW) for review inJune 2010. The final list of designated lands for reuse provided by HCWW identified 63 locationscovering an area of 87,000 feddan. A presentation was given at USAID on the findings of theFeasibility Study on 12 May. Several meetings were held with private sector companies to discussopportunities for investors to participate in wastewater reuse for agriculture. The HCWW LegalCommittee has expressed concerns regarding implementing large scale pilots (1000 fd) in whichcontract is given to a single investor without going through a proper tender process.Under the Global Development Alliance of Environmental Services for Improving WaterQuality Management in Rural Areas the three wastewater treatment facilities constructed by theproject under IWRM I were transferred to the Wastewater Companies of Gharbiya and Luxor. Twoshredders for recycling agricultural waste were purchased and supplied to the Shobra KasCommunity Development Association.Under Task 2.1: Regional Water Management Organizations activities are on hold pending thefinal recommendations from the MWRI Institutional Reform Unit (IRU) on the structure for theRegional Water Management Organization (RWMO). Meetings were held with German TechnicalCooperation Program (GTZ) and IRU to discuss the status of their program for establishment of anRWMO. GTZ sponsored a RWMO Workshop in Hurghada (January 22-24). Discussions were heldwith USAID and various MWRI senior staff on next steps for establishing an RWMO in East NileDelta. H.E. Minister MWRI has requested an evaluation of various institutional reform proposals tohelp decide the next steps. This study is on-going.For Task 2.2: Formation and Development of Integrated Water Management Districts 8General Directorates for Water Resources & Irrigation and 45 Integrated Water ManagementDistricts (IWMD) established in August 2009 are fully operational. Boundaries have been defined;staff has been assigned; office, computer, training and wireless network equipment supplied andinstalled. A computer training center was established at each Directorate. ADSL lines for internetaccess have been installed in all 8 Directorate offices and 29/45 IWMDs. Directorate IT teams maderegular visits to their respective IWMDs to provide computer maintenance support. Preparation ofBusiness Plan data sheets and Integrated Maintenance Plans by each IWMD were completed.Monthly Directorate and integrated maintenance coordination meetings were held. IWRM IIcontinued to provide limited support to the IWMDs (27) formed under IWRM I. As part of afollow-up program staff from MWRI Ground Water Sector, Water Quality Unit, and MinistryInformation Center visited several IWRM Directorates established under IWRM I. Training coursessponsored by the project were held by local regional MWRI staff with 36 participants (53 % women)on Internal Local Basic Computer Skills (2 events) and Internal Local Internet Basic Skills (2 events).Under Task 2.3: Establishment of Information Management Systems for Sustainable WaterResources Management water monitoring and distribution staff have been assigned in all GeneralDirectorates (8) and IWMDs (45). Procurement of water monitoring equipment to include current4 Annual Report Year 2 (January – December 2010)


meters, GPS devices, water quality meters, and ground water measuring tapes was completed.Installation of 10 data loggers was completed by the MWRI Telemetry Department and an additional8 procured. Under the Matching Irrigation Supply and Demand (MISD) activity bi-weekly crop datafor each branch canal is being collected by MALR and transferred to the relevant IWMD office in all45 districts. Water flow measurements were carried out at 138 inflow/outflow sites. Preparation ofcalibration curves to convert water levels to flow discharge is ongoing for these sites. District waterquality networks were established and 298 sites were identified for monitoring. Water level,complaint, water quality, and MISD data bases were installed at all 45 IWMDs. Review andconsolidation of the canal and drain network digital maps for all 8 Directorates are ongoing. Trainingcourses were held with 1080 participants (29 % women) on Computer Maintenance (7 events),Follow-Up of Water Level & Complaints DB (7 events), Current Meters (7 events), WaterDistribution Methods & Procedures (7 events), Water Quality Monitoring (10 events), DigitalMapping (10 events), Internal Local Digital Map Training (1 event), Water Flow Calibration (7events), Water Quality Database (7 events), and Ground Water Monitoring (5 events).For Task 2.4: Capacity Building of MWRI Personnel 36 candidates were identified for MWRIMS degree programs. 20 persons are now enrolled in MS degree programs: 6 at the AmericanUniversity in Cairo for Environmental Engineering (1 person), Master of Engineering (4 persons),Intensive English (1 person) and 14 persons in local universities. An inaugural ceremony was held atthe American University at Cairo (AUC) campus to announce the launch of the Master of Science(MS) scholarship program in Water Resource Management sponsored by the project. A 7-day StudyTour to Turkey for 13 persons from IWM Directorates and Districts from both IWRM I & II wasconducted from 21-27 March.For Monitoring and Evaluation the seasonal crop cultivated area evaluation for the East Nile Deltaduring the winter of 2008/9 was completed. Winter 2009/10 and summer 2010 crop GPS fieldsurveys to evaluate East Nile Delta crop distribution were conducted by the Ministry InformationCenter (MIC). Soil, Water, and Environment Research Institute (SWERI) provided seasonal cropdata for the East Nile Delta for the winter of 2008/9. MWRI established two M&E committees tofollow-up on Phase 1 (IWRM I) and Phase 2 (IWRM II) IWMDs activities.For Strategic Communication in accordance with the Communication Plan, the followingmaterials were produced and distributed to support the overall project, and specifically theestablishment of BCWUAs & IWMDs (Tasks 1.1 & 2.2): Project Overview Brochure English/Arabic(5,000); Overview Brochure Arabic only (10,000); 60 IWMD WAT kits for use with water userscontaining the BCWUA Guide Talk Book, Flip-Chart, & PowerPoint Presentation as well as DVDsof 2 video programs; 650 Talk Books for BCWUAs, BCWUA Flyers (100,000); BCWUA Booklet forBoards & Representatives (10,000); 1,000 project folders for workshops; 60 sets of 10 Arabic postersfor IWM Directorates & Districts; 650 sets of 3 posters for BCWUAs; 100 East Delta IWRM maps;60 plexi-glass brochure stands; and 2,500 caps. The updated IWRM II website was approved by theMWRI and launched (http://iwrm2eg.org). To support Task 1.3 a video and newspaper designed forfarmers to interest them in growing high-value, low-water use crops is in production.Procurement was carried out in accordance with the Life of Project procurement plan updated forYear 2. Items procured to date: computers (314), printers (152), scanners (60), photocopiers (60),data show (22), air conditioners (82), digital cameras (67), GPS (120), fiber glass boats(57), faxmachines (59), current meters (61), winches & tagline sets for water measurement (61), data loggers(18), water quality meters (55), training room furniture sets (62), ground water monitoring tapes (60)and agriculture crop waste shredders (2). Four project vehicles were purchased. Three were deliveredand the fourth is under licensing.Annual Report Year 2 (January – December 2010) 5


Under Training 27 courses were implemented through over 115 events, providing morethan 300 training days for over 3000 Trainees (15 % women). A 7-day international Study Tour toTurkey for 13 persons was sponsored by the project.2. ACCOMPLISHMENTS DURINGTHE REPORT PERIODTASK 1.1: FORMATION AND DEVELOPMENT OF BRANCHCANAL WATER USER ASSOCIATIONSEng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist) is the IRG coordinatorfor this task. Dr. Moamen El Sharkawy and Eng. Amira Abdel Hady provided technical support onbehalf of MWRI Integrated Water Management Unit (IWMU). After the close of the IWMU inSeptember 2010 Dr. Moamen El Sharkawy and Eng. Amira Abdel Hady took leave without pay(LWOP) from MWRI and joined the project to continue to support Task 1.1. Dr. Stan Peabody(IRG), Sociologist, provided expatriate STTA support. Activities carried out during Year 2 include:• IWMD Water Advisory Teams (WAT) are active in each district with a total MWRI staff of615 people (17.8 % women) assigned to the teams.• On March 11, H.E. the Minister issued Decree No. 95 enabling establishment of BCWUAsin 8 General Directorates (GD) and 45 IWMDs of the East Delta.• Training courses were held with over 1300 participants (9% women). The BCWUAChairpersons Orientation Workshops (14 events) were held in Quarter 3 with 584/619 (94%)of the BCWUA Chairpersons attending. BCWUAs MOU & Internal Regulations (9 events)training was conducted during the 3 rd and 4 th Quarter. BCWUA Activation Workshop (7events) training was held in Quarter 4.• Establishment of 624 BCWUAs was completed covering all branch canals in the 45 IWMDsin the East Nile Delta. Elections have been held for each BCWUA to elect Water UserRepresentatives (WURs): 18,361 representatives (4% women), board members: 5154 (9.2 %women), and chairpersons: 624 (2 women). Decrees were signed by the Undersecretaries for624/624 BCWUAs.Directorate IWMDs Branch Canals BCWUAs formedDamietta 2 61 27Elsalam 4 97 56East Dakahlia 8 329 141South Dakahlia 5 127 88Ismailia 6 61 53Salhia 7 99 82East Sharkia 5 187 83Qualubia 8 259 94Total 45 1220 624• BCWUAs Activation Process was started. 624/624 Memorandum of Understanding (MOU)& 624/624 Internal Regulations (IR) were signed by the BCWUA’s chairpersons and boardmembers. The MOUs and IRs signature and endorsement by Irrigation Undersecretarieswere finalized for 22 IWMDs and are ongoing for 23 IWMDs.6 Annual Report Year 2 (January – December 2010)


• Participatory maintenance needs assessments were started in all IWMDs.• A meeting was attended on the 15 December with MWRI officials and Central Directoratefor Irrigation Advisory Service (CDIAS) in Cairo concerning the Water User Organizationformation guidelines currently under development by CDIAS. The IWRM I Guidelines wereshared with CDIS and are being incorporated. Dr. Moamen El Sharkawy attended on behalfof IWRM II.• Monthly Water Advisory Team coordination meetings were held.Task 1.1 PMP Indicators and TargetsYear 1 Year 2Task Indicator Units Baseline Target Actual Target Actual1.1 Formation and Development of Branch Canal Water User Associations (BCWUAs)1.1.a Number of IWMDs withstaffed Water Advisory TeamsNumber 0 45 45 45 451.1.b Number of GDs with staffedWater Advisory TeamsNumber 0 8 8 8 81.1.c Share of planned BCWUAsestablished by Ministerial Percent 0 50 0 100 100decree1.1.d Share of BCWUAs withmaintenance priorities and Percent 0 0 0 50 0action plans1.1.e Share of BCWUAs monitoringand reporting on Branch Percent 0 0 0 50 0Canal water supplyTASK 1.2: SUSTAINABLE LOCAL FINANCING FOR CANAL ANDDRAIN MAINTENANCEEng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist) is the IRG coordinatorfor this task. Dr. Moamen El Sharkawy and Eng. Amira Abdel Hady provided IWMU technicalsupport. After the close of the IWMU in September 2010, Dr. Moamen El Sharkawy and Eng.Amira Abdel Hady took leave without pay (LWOP) from MWRI to join the project to continue tosupport Task 1.2. Dr. Stan Peabody (IRG), Sociologist, provided expatriate STTA support. Activitiescarried out during Year 2 include:• Work continued on preparation of Guidelines for Local Financing for Canal and DrainMaintenance.• Implementation of activities under this task was deemed dependent on the approval of theamendment to Law 12. Changes to the Law 12 Amendment are with the Peoples’ AssemblyAgricultural & Irrigation Committee for consideration.• During the 4 th quarter MWRI requested that the project proceed with the activity indicatingthat ministerial decrees could be issued to support local financing by MWRI until theamendment of Law 12 is passed.• With the help of the Irrigation Department, guidelines, reports and studies on cost sharingavailable from the various MWRI projects and organizations were collected.• Collection of data on actual BCWUAs self-financed activities from IWRM I & IWRM IIareas was started.Annual Report Year 2 (January – December 2010) 7


Task 1.2 PMP Indicators and TargetsYear 1 Year 2Task Indicator Units Baseline Target Actual Target Actual1.2 Sustainable Local Financing for Canal and Drain Maintenance1.2.a Decree prepared and submittedfor approval 1 0/1 0 1 1 1 11.2.b BCWUA cost sharing systemguidelines submitted for0/1 0 1 0 1 0approval1.2.c Cost sharing system guidelinesimplemented on Branch CanalsNumber 0 0 0 0 0Note: 1 At the request of H.E. Minister MWRI a more significant draft law on participation in waterresource management was prepared and submitted to the Cabinet for approval. The Amendmentwas sent for review to the Peoples’ Assembly Agricultural & Irrigation Committee in April 2010. Noaction has been taken to date.TASK 1.3: IMPROVEMENTS IN WATER PRODUCTIVITY ANDEFFICIENCYDr. Wadie Fahim Mankarious (LTTA Senior Organization/Institutional Development Specialist) isIRG coordinator for this task. He was supported by several local consultants including Dr. IbrahimSiddik, Agricultural Economist and Rural Development Specialist; Dr. Ahmed Behery, AgriculturalEngineer and Farm Systems Development Specialist; and Dr. Walid Sallam, Agricultural Economist.MALR provided technical assistance in crop survey and soil and water analysis. Activities carried outduring Year 2 include:• Close collaboration with Ministry of Agriculture and Land Reclamation (MALR) on theactivity continued. MALR appointed Dr. Abd El Ghany El Guindy (MALR Soil, Water andEnvironment Research Institute, Agricultural Research Center) to serve as coordinatorbetween the MWRI and MALR on task activities. A meeting was held with Dr. El Guindy,MALR Coordinator; Eng. Abd El Rahman Saleh, Undersecretary, Central Directorate ofAgricultural Cooperative; and Eng. Hassan Saleh, Undersecretary, Central Directorate ofAgricultural Extension, to coordinate the collaboration between MWRI and MALR.• An orientation work shop was conducted for MWRI IWMD and the MALR agricultureextension staff in Abu Kebeer, Sharkiya. 11 participants from the MALR and 10 from theMWRI attended.• An orientation work shop was conducted for the farmers of the El Manshar BCWUA at theBCWUA premises at Menshat Radwan Village, Abu Kebeer, and West Sharkia. USAID,MWRI, IRG Task Team and 9 officials from MALR and Agriculture Extension; and 84farmers/members of the El Manshar BCWUA attended.• A questionnaire for a baseline survey of the El Manshar branch canal farmers was preparedand circulated among staff for review. Training was conducted for MWRI and MALR AbuKebeer staff for data collection on the approved survey instrument, and the baseline surveywas conducted.• A meeting was held with the GTZ team of the Agricultural Water ManagementProject/MALR to understand their activities and discuss possible areas for collaboration.• A joint meeting between El Manshar BCWUA board members, El Manshar AgriculturalCooperatives and Abu Kebeer IWMD staff was conducted to organize interested farmersand advance their participation in the activity.8 Annual Report Year 2 (January – December 2010)


• A total area of 37.5 feddan was provided by 14 members of the El Manshar BCWUA fordemonstration of high-value, low-water use crops (HVC).• Protocol papers to establish Water Committees within the Agricultural Cooperatives in thetwo villages on El Manshar pilot branch canal in Abu Kebeer, Sharkia were prepared andreviewed by MALR. This was followed by a joint meeting between El Manshar BCWUAand Agricultural Cooperatives to establish the Water Committee within the AgriculturalCooperative structure. This development is significant because it strengthens cooperationbetween the Agricultural Cooperatives and the BCWUAs; and provides BCWUAs with asurrogate legal status that enables contracting with buyers and access to credit.• A model contract between potential participating farmers as producers andexporters/marketers/buyers for the purchase of high-value crops was prepared and sharedwith the BCWUAs for discussion.• The recently established West Belbeis IWMD, Qualubia heard of the pilot implementation inthe Phase I (IWRM I) project area and requested to join the activity. A meeting was heldwith 6 newly elected BCWUA chairmen and over 50 water users from W. Belbeis IWMD.MWRI Qualubia Undersecretary, the W. Belbeis District Manager with his staff, and the GDAgriculture Qualubia accompanied by 6 members of the extension staff attended.• Pilot and demo activities continued with BCWUAs in Abu Kebeer IWMD (West Sharkia)and W. Belbeis IWMD (Qualubia) involving 113 fd and 44 farmers. The project alsoprovided marketing assistance and access to seeds for yellow corn on 2,700 fd for 2,500farmers in W. Belbeis. Status of the HVC program follows:BCWUA InformationDirectorate District ParticipantBCWUAWestSharkiaAbuKebeerQualubia W.BelbeisAreaof BC(fd)No. offarmersBCWUACropnamePlannedArea (fd)HVC informationActualplanted(fd)No. ofFarmersMinimumContractQuantityContractorEl Manshar 1500 630 Sesame 51.5 45 24 40 fd ESHEDAMoustafaAfendy, ElGosaqvillage7130 2836 Basil 40 40 15 30 fd Giza forSeeds /ESHEDAMeet Malla 6184 1204 Vegetable 51 28 5 N/ASub-total 14814 4670 142.5 113 44 70Qualubia W.Belbeis8 BCWUAs 57000 N/A YellowCorn2700 3000 2500 8000 ton IsmailíaPoultry Co.Sub-total 57000 2700 3000 2500 8000 tonTotal 71814 4670 2842.5 3113 2544• Three partner Agricultural Cooperatives established Water Committees with representativesfrom the BCWUAs (El Manshar BCWUA, Abu Kebeer, West Sharkia; Meet Mallaa BCWUA& Moustafa Afendi BCWUA, West Belbeis, Qualubia).• Sandy Valley Seed Company sponsored a visit for 8 BCWUA members to their vegetableexperimental station.• Soil samples were collected by Soil Water & Environment Research Institute, AgricultureResearch Center (SWERI) on 15 fd in Abu Kebeer and 25 fd in West Belbeis. A work shopon the results of the soil analysis by SWERI was conducted in Zagazig for more than 60BCWUA members from Abu Kebeer and West Belbeis IWMDs. Union of Producers &Exporters of Horticulture Crops (UPEHC) also gave a presentation. Eng. Wafaa (USAIDCTO) and MALR Agriculture Extension staff attended.Annual Report Year 2 (January – December 2010) 9


• Training on growing sesame and basil was conducted for MWRI and MALR staff,as well as farmers• A meeting was held with Farm Frites (FF) representatives on 14 June at USAID. FFdiscussed the possibility of a contract for vegetables for winter season with the farmers inBelbeis.• Pasta & Juice Co. (P&J Co.) discussed a possible contract for 50 fd of tomatoes withBCWUAs in W. Belbeis during winter. P&J Co. conducted a meeting with three BCWUAs inBelbeis to negotiate a contract for purchasing tomatoes. The P&J Co. requested that thecontract should not be for less than 30 fd with an upper limit of 200 fd. The project and theCompany conducted a follow-up meeting to inform additional farmers.• Harvesting of the basil crop in West Belbeis was completed. The Task 1.3 team and head ofGiza Co. of Seeds visited the fields and collection site for drying the basil. Technicalguidance was provided to the farmers and the chairperson of El Gousak BCWUA oncollecting, drying, and marketing the yield as required by the Giza Company of Seeds.• At the request of the BCWUA Chairmen from East Suez Canal, the Task 1.3 team held aseminar in Ismailia to introduce farmers to a credit program available for irrigation systemimprovements on new lands. The MWRI Undersecretary, Ismailia; MWRI General Director,Ismailia; MALR Undersecretary, Ismailia; MALR General Director, East Suez Canal District;Head of Farmers Committee, Ismailia Local Council; and 17 Chairpersons from East SuezCanal BCWUAs attended. The BCWUA members welcomed the opportunity to take loansfor improving irrigation systems on their land. The potential target area is 30,000 fd.• A training course on Marketing Skills was given to 22 participants from the two pilot districts,Abu Kebeer and Belbeis. Five Irrigation Engineers, five Agricultural Engineers, and oneChairperson of BCWUA attended from each IWMD.• Training on Marketing & Contract Negotiations was given to 22 participants from the twopilot IWMDs. Five Irrigation Engineers, five Agricultural Engineers, and one BCWUAChairperson attended from each pilot IWMD.• Farm Frites Co. met with BCWUAs representatives in West Belbeis to discuss possiblecontracts for 5000 fd of green peas, 10,000 fd of carrots, 10,000 fd of okra, and an unlimitedarea of molokhia (a green leafy vegetable) and green beans.• Sesame harvesting in Abu Kebeer was completed. ESHEDA insisted that tests beconducted to ensure the crop was free of pesticides as stated in the contract, but farmersrefused. As a result some farmers sold their yield in the open market.• A work shop to discuss winter season HVCs crops was held in Zagazig for Abu Kebeer andWest Belbeis IWMDs. Fifty nine participants: 10 MWRI staff, 10 MALR staff, and 39BCWUAs members attended.• New buyers started to participate and directly contact BCWUAs. Three private companies i)Hamada for Exporting, ii) General Saad for Food Products, and iii) Arab Company forMedicinal Plants met with the interested BCWUAs at the agricultural cooperative in WestBelbeis to discuss contracting for onions, strawberries, medicinal plants and garlic. Thecompanies agreed to provide farmers with seeds and TA.• Three buyers contracted three of the West Belbeis BCWUAs for cultivation and marketingof various winter crops:o The United Brothers Co. for Strawberry Trade and Nurseries' Distribution signed acontract with the chairman of Meet Yazid BCWUA for growing strawberries.o Al Awady for Trade and Supplies in Al Obour Market signed a contract with thechairman of Al Makaser BCWUA to grow garlic.o Hebeish Sons for vegetables and fruits trade, known as "Sammour" signed a contractwith the chairman of Mostafa Afandy BCWUA to grow peas.• A meeting was held between W. Belbeis BCWUA and Spicy Land Co. to discuss contracts togrow spices in winter. The company will provide farmers with seeds and TA.• The draft “Report for Summer Season 2010 Introducing High Value Crops to East Delta”was prepared and is under review.10 Annual Report Year 2 (January – December 2010)


• The Task team met with representative of Farm Frites, Eng. Ehab Emara to discuss futurecollaboration including development of a database to provide information on the landowners,area cultivated, previous cropping, history of diseases, land types, and water quality.Contractual problems due to BCWUA legal status were discussed.• Pilot and demo activities to introduce HVC cultivation continued for winter crops withBCWUAs in Abu Kebeer IWMD (West Sharkia) and W. Belbeis IWMD (Qualubia). Thefollowing table shows the progress of cultivation of winter crops in the two pilot areas.District BCWUA Crop Area (fd) Contract TAW. BelbeisMoustafa AfendyMeet YazidEl MakaserPeas 8 Yes YesOnion 5 No NoFennel 3 Yes YesStrawberry 21 Yes NoOnion 16 Yes NoGarlic 17 Yes YesPeas 2 No NoTomato 1 1 No NoAbo Kebeer El Manshar Vegetables 50 N/A NoTotal 123Note: 1 new variety brought by farmers• The BCWUAs are now working independently with the following buyers for fruits,vegetables, and spices: the United Brothers Co. for Strawberry Trade and Nurseries'Distribution; Al Awady for Trade and Supplies in Al Obour Market; Hebeish Sons alsoknown as Sammour; and Spicy Land Co.Year 1 Year 2Task Indicator Units Baseline Target Actual Target Actual1.31.3.aImprovements in Water Productivity and EfficiencyNumber of farmers receivingtraining on High-Value Cropsand water saving technologyNumber 0 100 0 300 502TASK 1.4: WASTEWATER REUSETask 1.3 PMP Indicators and TargetsDr. Wadie Fahim Mankarious (LTTA, Senior Organization/Institutional Development Specialist) isthe IRG coordinator for this task. Mr. Russell Misheloff, Senior Economist provided STTA. Eng.Sami Yacoub (Organization/ Institutional Development Specialist) provided STTA support andfollow-up to the Global Development Alliance: Environmental Services for Improving WaterQuality Management in Egypt (GDA). Activities carried out during Year 2 include:Waste Water Reuse Feasibility Study• A presentation was given by Dr. Omran at USAID on “Effect of Alternative Uses ofWastewater on Food Security in Egypt”. Richard Rousseau and Eng. Wafaa Faltaousattended.Annual Report Year 2 (January – December 2010) 11


• A meeting was held with Gen. Saied Nasr, Holding Company for Water &Wastewater (HCWW), in January to discuss the Public-Private Partnerships (PPP). Eng.Wafaa Faltaous attended.• As a result of a meeting held with HCWW (Gen. Ahmed Salah and Eng. Shahin) in January,the final list of designated lands for reuse was provided by HCWW. HCWW identified 63locations with a total area of 87,000 feddan.• FAO Egypt Soil maps were scanned and geo referenced. These maps cover the landsdesignated to HCWW for reuse. It could be used as a reference for soil analysis by investorsor HCWW.• IRG Task Manager met with Deputy Chairperson, HCWW to discuss the status of thefeasibility study. HCWW provided a draft copy of the Request for Quotation (RFQ) for 3000feddan in Aswan Governorate designated for wastewater reuse and requested assistance.Comments were provided and sent on the RFQ.• The preparation of the “Feasibility Study on Wastewater Reuse” was completed. Thirteenannexes listed below were prepared to support the study.Annex Title Author1 MWRI Strategy for WW Reuse for Irrigation Dr. Bahaa Saad (Senior Advisor MWRI)2 MWRI Strategy for Reuse of TWW throughRecharging the Groundwater Aquifer3 Technical Feasibility of Returning TWW to theDrainage System in Egypt4 Artificial Recharge of Groundwater: A Means toReuse TWW5 Agro-Economic Feasibility of Alternative Crops withPotential for Reuse of TWWDr. Fatma Attia (Groundwater Specialist and SeniorAdvisor MWRI)Dr. Bahaa Saad (Senior Advisor MWRI)Dr. Fatma Attia (Groundwater Specialist and SeniorAdvisor MWRI)Dr. Ziad El Menshawi (Agricultural Specialist andHolding Company for Water and Wastewater Advisor)6 Agricultural Technical Guidelines for WW Reuse Dr. Nabil Kandil (Agriculture and EnvironmentSpecialist, Soil, Water and Environment ResearchInstitute)7 Design for Irrigation System Networks Dr. Ahmed Behery (Agriculture Irrigation Specialist)8 Financial And Economic Analysis of The Feasibility ofReuse of Treated Wastewater for Agriculture9 Preliminary Economic Feasibility of Alternative Cropswith Potential for the Reuse of TWW in EgyptDr. Mohamed Omran (Economist)Dr. Ken Swanberg (Expat Agriculture Economist)10 Public–Private Partnerships PPP team: Mr. Jim Dempsey (Expat Micro Enterpriseand Institutional/Organizational DevelopmentSpecialist); Ms. Rasha Kenawy ( Economist, Private-Public Partnership Investment Specialist); General AbdEl Galil Eraky (Former Senior Assistant to theChairman of General Authority for Investment & FreeZones)11 Food Security Dr. Mohamed Omran(Economist)12 Determining the Environmental Impact of DifferentOptions of Reuse of Treated WastewaterDr. Ahmed Abu El Saoud (Senior EnvironmentalSpecialist, Egyptian Environmental Affairs Agency)13 Social Impact Assessment Dr. Manal Eid (Sociologist)• Russell Misheloff provided assistance in preparation of the “Feasibility Study on WastewaterReuse” main report. Copies of the report were submitted to USAID and HCWW.• A presentation was made to USAID by the Task 1.4 team on the preliminary findings of theFeasibility Study. USAID participants included Richard Rousseau (Office Director/PSD),Eng. Wafaa Faltaous (CTO), Dr. Mohamed Abo El Wafa (Agricultural Specialist/PSD), Eng.Gharib El Sawi (PSD/Infrastructure), Amani Luka (PSD/Infrastructure), Dr. Millie Gadbois(Office Middle East Programs), David Besch (Private Sector Initiatives, Office Middle EastPrograms), and Amani Selim (Program Office).12 Annual Report Year 2 (January – December 2010)


• A letter was sent to HCWW in June requesting a date for a presentation on the findings ofthe “Feasibility of Wastewater Reuse” study.• A meeting was held at USAID with JICA to discuss and exchange experiences with IWRM IIon the topic of drainage reuse.• A meeting was held with ORASCOM at USAID to discuss possible collaboration onwastewater reuse for an industrial area in Suez.• The Final Draft of the report on the “Feasibility of Wastewater Reuse” prepared by RussMisheloff was submitted to USAID and HCWW in June for review and comment. HCWWsent their comments on the report in October.• Dr. Wadie F. Mankarious (IRG) attended a meeting with Eng. Wafaa (USAID CTO), Dr.Abu El Wafaa (USAID Agri-Business team leader), Dr Fayed (ORASCOM consultant), EngMahmoud Khalil (Board Chairman of Naga Hammady Fiber Board Co.) and Mr. AbdallahElfeky (Abu El Holl for Import & Export) to discuss opportunities for investors toparticipate in wastewater reuse in agriculture. Minutes were prepared and sent to allparticipants.• A meeting was held with HCWW in November to present and discuss the results of the“Feasibility of Wastewater Reuse” study and next steps. General Eng. Ahmed Salah (HCWW)& staff, John Pasch (USAID), Eng. Wafaa Faltaous (USAID), Eng. Atef Abd El Sayed (USAID);Dr. Jeff Fredericks (IRG); and Dr. Wadie Fahim (IRG) attended. The group met briefly withGeneral Eng. Sayed Nasr (Deputy Chairman, HCWW). It was agreed that next steps shouldinclude discussions with the HCWW Legal Committee, and a presentation for Dr. Abd ElKawy Khalifa (Chairman, HCWW) on the findings of the feasibility study.• HCWW submitted a memo to Mr. Osama Shalaby, Chairperson, HCWW Legal Committeerequesting an appointment for a meeting between IRG and the Committee to discuss thelegal concept of pilot areas within 1000 feddan.Global Development Alliance (GDA)• At USAID’s request IRG continued to support the GDA implemented under IWRM Iinvolving the three wastewater treatment facilities (WWTF) constructed at El Toud (Luxor),Shobra Kas (Gharbiya), and Damanhour El Wahsh (Gharbiya).• A field visit to Shobra Kas was conducted by Richard Rousseau (USAID PSD OfficeDirector), Eng. Wafaa Faltaous (USAID CTO), Michael Goltzman (Coca-Cola, DirectorPublic Affairs North Africa), Dr. Moustafa Ghaith (Director IWMU), Eng. Yossef Elmaamle(MWRI GD, New Zifta Directorate) and members of his staff; Dr. Jeffery Fredericks (IRGCOP), Dr. Wadie Fahim (IRG Task Leader), and Eng. Sami H Yacoub (IRG Consultant).The visit was followed by a meeting with Eng. Mohamed Kadoom (Deputy Chairperson,Gharbiya WWCo).• IRG continued operation of Shobra Kas WWTF under project funding and supervision till itwas transferred to Gharbiya Water and Wastewater Company (GWWC) in March.• Damanhour El Wahsh WWTF was also transferred to GWWC in March.• Two small shredders for agricultural waste recycling were supplied to Shobra Kas CDA toreplace two larger shredders that were sent to the CDA in EL Toud Luxor.• Luxor Wastewater Company (LWWC) took on temporary operation of the El Toud WWTFfor testing and collection of samples by the Luxor Health Office. After 15 days of testing,the LWWC agreed to accept transfer of the El Toud WWTF.• A final report prepared by Eng. Sami Yacoub on his assignment in support of the GDA forEnvironmental Services for Improving Water Quality Management in Egypt was submittedto USAID.Annual Report Year 2 (January – December 2010) 13


Task 1.4 PMP Indicators and TargetsYear 1 Year 2Task Indicator Units Baseline Target Actual Target Actual1.4 Wastwater Reuse1.4.a Feasibility plan submitted forapproval0/1 0 1 0 1 11.4.b Number of partnershipagreements signedNumber 0 0 0 0 0TASK 2.1: REGIONAL WATER MANAGEMENT ORGANIZATIONS (RWMO)Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist) is the coordinator for thistask. He was supported by Dr. Jeffrey Fredericks (COP). Eng. Mohamed Hamed (IWMU) providedtechnical support until the closure of IWMU. Activities carried out during Year 2 included:• Activities are still on hold pending the final recommendations from the MWRI InstitutionalReform Unit (IRU). IRU/ German Technical Cooperation Program (GTZ) were thearchitects of the Regional Water Management Organization (RWMO) concept.• A RWMO Workshop sponsored by IRU and GTZ was held in Hurghada from January 22-24. It was attended by Ministers of both MWRI and Administrative Development; MWRItop management; and representatives from the IRU, IWMU, IWRM II, donors and their TArepresentatives. Dr. Mostafa Ghaith (IWMU), Dr. Jeff Fredericks (IRG), and Eng NabilFawzy (IRG) attended. A decision regarding formation of the RWMO was postponed. It wasdecided that an evaluation by IRU of the performance of the existing IWMDs, Directoratesand BCWUAs would be conducted.• The evaluation carried out at the request of H.E. Minister MWRI on IWMDs/BCWUAsexcluded decisions/comments on RWMO. IRU/GTZ has contracted for a separate study toprovide recommendations for RWMO. This evaluation is on-going.• GTZ cancelled their consultant’s contract for Component 2: Support for Establishment ofGovernorate Water Management Organizations in Beheira Governorate. GTZ is also waitingfor a decision on the future direction for the RWMO initiative.Task 2.1 PMP Indicators and TargetsTask Indicator Units Baseline2.1 Regional Water Management Organizations2.1.aBusiness plan submitted to MWRIfor approvalYear 1 Year 2Target Actual Target Actual0/1 0 0 0 1 02.1.b Business plan implemented 0/1 0 0 0 0 0TASK 2.2: FORMATION AND DEVELOPMENT OF INTEGRATEDWATER MANAGEMENT DISTRICTSEng. Nabil Eng. Fawzi (LTTA, Senior Water Resources Management Specialist) is the coordinatorfor this task. Eng. Maher Khodary (LTTA, Senior Water Resources Management Specialist, RegionalAdvisor) is responsible for managing the task for the four Directorates and 26 IWMDs covered by14 Annual Report Year 2 (January – December 2010)


the Zagazig Regional Office. Eng. El-Sayed Nagi (LTTA, Senior Water Resources ManagementSpecialist, Regional Advisor) is responsible for managing the task for the four Directorates and 19IWMDs covered by the Mansoura Regional Office. Until the closure of IWMU Eng. MohamedHamed (IWMU) provided technical support as the IWMU task manager. Under the IWMU Eng.Ayman Shedid (IWMU) and Eng. Soha Mostafa (IWMU) provided technical assistance support tothe Zagazig IWRM II Regional Office. At the close of IWMU they were assigned as MWRI ZagazigRegional Office coordinators. Eng. Elbayoumi Ali Ez Eldeen (MWRI) and Eng. Akmal BadieHenein (MWRI) were assigned as Regional Office coordinators to support the IWRM II Mansouraoffice in September 2010. Activities carried out during Year 2 included:• MWRI staff has been officially assigned to all senior positions in the 45 IWMDs.• Business Plan and Integrated Preventive Maintenance data sheets were completed by allIWMDs. Review/revision of data was completed for all 45 IWMDs. Compiling the data wascompleted for 26 IWMDs, and is ongoing for the remaining 19 IWMDs.• Integrated Maintenance Plans were prepared by all 45 IWMDs.• ADSL lines for internet access have been installed in all 8 Directorate offices and 29/45IWMDs.• Procurement of furniture for training facilities was completed. Training rooms wereestablished in each of the 45 IWMDs.• Computer training centers were established and equipped in each of the 8 target Directorates(East Sharkia, Salhia, Ismailia, Qualubia, Damietta, El Salam, East Dakahlia, and SouthDakahlia).• Directorate monthly meetings were held in every month for the 8 East Delta Directorates.The meetings were attended by the irrigation and drainage Undersecretaries, DirectorGenerals, District Managers, and IWRM II Regional Advisors.• Staff from Ground Water sector visited four of the original Integrated Directorates inFebruary.• Staff from Water Quality Unit visited Aswan and E. & W. Qena Integrated Directorates inFebruary.• Staff from Minister Information Center (MIC) visited Qena East & West IWMDs and GDsfrom 1 – 3 November in addition to Aswan IWMDs & GDs from 8 – 10 November tofollow up the Water Level & Complaints databases.• Integrated Maintenance Coordination Meetings (7 events) were held during February.• Directorate IT teams made regular on-site visits to the 45 IWMDs as part of the computermaintenance follow-up program. This program began in April 2010.• Visits were made to all 45 IWMDs by the IRG staff in Mansoura & Zagazig ROs to followthe status of entering data in the respective data bases, condition of equipment and thecollection and compilation of training course deliverables.• A local basic computer training course organized by Qualubia Directorate was offered to atotal of 19 persons (2 events) on June 15-17 & June 20-22.• To provide follow-up support to LIFE/IWRM I, quarterly coordination meetings were heldin West Sharkia, New Zifta, East and West Qena and Aswan General Directorates. Themeetings were attended by the Irrigation and Drainage Undersecretaries, the GeneralDirectors, and District Managers. The Lower Egypt meetings were attended by IWRM IIZagazig Regional Advisor (Eng. Maher Khodary). The Qena and Aswan meetings wereattended by Eng. Nabil Fawzi.Annual Report Year 2 (January – December 2010) 15


Task 2.2 PMP Indicators and TargetsYear 1 Year 2Task Indicator Units Baseline Target Actual Target Actual2.2 Formation and Development of Integrated Water Management Districts (IWMDs)2.2.a Number of IWMDs established withfully staffed senior positionsNumber 0 45 45 45 452.1.b Number of IWMDs with completedintegrated maintenance plansNumber 0 0 0 45 452.2.c Number of IWMDs with a trainingroom established and equippedNumber 0 20 0 45 452.2.d Number of General Directorates witha computer training centerestablished and equippedNumber 0 8 8 8 82.2.eNumber of IWRM I IWMDsparticipating in coordinationmeetingsNumber 27 27 27 27 27TASK 2.3: ESTABLISHMENT OF INFORMATION MANAGEMENTSYSTEMS FOR SUSTAINABLE WATEREng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist) is the coordinator for thisTask. He was assisted by Eng. Hisham Shehab (IWMU) and Eng. Mohamed Hamed (IWMU) untilthe closure of the IWMU in August 2010. Under the IWMU Eng. Ayman Shedid (IWMU) and Eng.Soha Mostafa (IWMU) provided technical assistance support to the Zagazig IWRM II RegionalOffice. At the close of IWMU they were assigned as MWRI Zagazig Regional Office coordinators.Eng. Elbayoumi Ali Ez Eldeen (MWRI) and Eng. Akmal Badie Henein (MWRI) were assigned asRegional Office coordinators to support the IWRM II Mansoura office in September 2010. Dr. TomS. Sheng (CADI), Water Resources Information Specialist, provided expatriate STTA support.Activities carried out during Year 2 include:• Water Distribution Teams (WDT) have been assigned for all IWM Directorates (8) andDistricts (45).• Monthly Water Distribution Team coordination meetings were started.• The Water Distribution Methods & Procedures training course was completed (7 events).• Under the Matching Irrigation Supply and Demand activity, bi-weekly crop data for eachbranch canal is being collected by MALR and transferred to all 45 IWMDs.• Flow Measurement training (7 events) was completed. Water Flow measurements are beingcollected by water measurement teams from each of the 45 IWMDs at 138 inflow/outflowsites.• Water Flow Calibration Training Course completed (7 events). Calibration of the 138inflow/outflow structures is on-going.• The Water Quality Monitoring training course was completed. 298 monitoring sites wereidentified and Water Quality monitoring is ongoing.• Water Quality Data Base Training Course was completed (7 events). The water qualitydatabase has been installed at all 45 IWMDs.• Ground Water Monitoring Training course was presented with 5/7 events completed.Ground water inventory of wells has started.• The Water Levels & Complaints data base follow-up training course was completed (7events). Water level and complaints data bases have been installed at each of the 45 IWMDs.16 Annual Report Year 2 (January – December 2010)


• The Introduction to Digital Mapping training program that began in December 2009 wascompleted (12 events).• Review and consolidation of the canal and drain network digital maps was completed in 3/8Directorates and is on-going at the remaining 5 Directorates.• A local AutoCAD & Digital Map training course organized by E. Dakahlia Directorate wasoffered to 7 persons during the period 6 - 8 June.• Eight additional data loggers were supplied to MWRI to support real time water level datacollection at designated telemetry sites. Installation of 3/8 additional data loggers has beencompleted and is on-going for the others. Maintenance support for the 10 data loggerssupplied and installed during Year 1 continued.• Computer Maintenance training (8 events) was completed.• A local basic computer training course organized by Salhia Directorate was offered to 20persons on 28-29 March. A similar training course organized by E. Sharkia Directorate wasoffered from 31 March -1 April.• As part of the program to investigate the potential to monitor water flows at the branchcanal (BC) level by testing flow measurement tools and developing guidelines for BC flowmonitoring, one BC (El Manshar, Abu Kebeer IWMD, W. Sharkia) was equipped with WaterLevel Automatic Recorders (WLAR) at the head and tail of the canal to measure and recordinflows. The WLARs record hourly water levels. The District WDT conducted flow watermeasurements and then produced a calibration rating curve for the intake to the BC.Task 2.3 PMP Indicators and TargetsYear 1 Year 2Task Indicator Units Baseline Target Actual Target Actual2.3 Establishment of information Management Systems for Sustainable Water ResourcesManagement2.3.a Number of IWMDs withNumbercalibrations for all authorized0 0 0 45 0inflow and outflow structures2.3.b Number of IWMDs with MISDinstalled and operationalNumber 0 0 0 45 452.3.c Number of IWMDs withcompleted and approved water Number 0 0 0 0 0resource management plan2.3.d Number of IWMDs with waterresource information systems Number 0 0 0 45 0 1installed and operational2.3.e Number of Branch Canals withflows monitored by IWMDNumber 0 0 0 0 1Note: 1 Five out of six of the planned water resources information systems have been installed andare operational (complaints, water levels, water quality, MISD, and BCWUA). The ground water database will be installed early in Year 3.Annual Report Year 2 (January – December 2010) 17


TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNELDr. Ibrahim Elassiouty (STTA, Water Resources Management Specialist) was the coordinator for thisTask until his retirement in the 2 rd Quarter, at which time Cheryl Groff (Senior StrategicCommunication Specialist) assumed this responsibility. Dahlia Hamdy (LTTA, Training Specialist)has assisted throughout the year. Activities carried out during Year 2 include:• A total of 20 persons are participating in the M.S. degree program (6 at AUC & 14 at localuniversities) as shown in the table below.• Upon the recommendation of the MWRI, 4 additional staff members were accepted into thelocal universities M.S. Degree Program, bringing enrollment in this program to 14.• 6 persons are enrolled in the American University in Cairo M.S. Degree Program:Environmental Engineering (1 person), Master of Engineering (4 persons), and IntensiveEnglish (1 person).• A pre-program orientation seminar was provided for the initial five MWRI staff candidatesselected for the AUC M.S. Degree.• An Inaugural Ceremony was held on the AUC Campus on 4 March to announce the launchof the M.S. Scholarship Program in Water Resource Management and BusinessAdministration.• The project assisted 7 candidates to prepare for and successfully undertake the requiredTOFEL language, and 1 person for the GMAT exams, for AUC entrance and placement.• Financial and logistical support for M.S. Degree Program participants has continuedthroughout the year.• A 7-day Study Tour to Turkey for 13 MWRI Engineers selected from the IWRM areas ofboth IWRM I & IWRM II of the project was completed 21-27 March. A reentry meeting washeld at USAID on 12 April for the 13 MWRI engineers who participated in the Study Tour.• USAID decided to fund all future Study Tours through the Coca-Cola/USAID Water andDevelopment Alliance (WADA). The project at the request of USAID assisted WADA byproviding input to the plan for a second Study Tour to the USA originally scheduled forOctober 2010, but postponed due to visa issues until January 2011.18 Annual Report Year 2 (January – December 2010)


S Name Position University Department Field of Study Required Degree StatusAmerican University of Cairo:1 Mohamed Ibrahim El Hamrawy2 Said Riyad Said3 Yasser Abdel Qader Aly4 Amr Mohamed FareedAssist. Director of Works -Salhiya Irrigation DirectorateAmericanUniversity in CairoResearch Assist. - WaterMangement Research Institute- AmericanNational Water Research University in CairoCenterCivil Engineer - Nile ProtectionSectorAmericanUniversity in CairoCivil Eng. at the Irrigation Dept. American- Technical Office - MWRI University in Cairo5 Nabil Nassif Faragalla Water Distribution Eng. - Tanta AmericanUniversity in Cairo6 Amira GalalEgyptian Institutions:1 Amina Yehia Zaghloul2 Osama Mohamed Awaida3 Throya Hasseeb Zaki4 Anwar Amin Ibrahim5 Magdy El Shahat6 Heba Mohamed Abdel Aziz7 Wael Mohamed Ahmed8 Mohamed Aly Hamed9 Ahmed Said Mohamed10 Shaimaa El Sherbeeny11 Maha Mohamed El Ameen12 Marwa Mamdouh Ahmed13 Soha MostafaCivil Eng. - Planning Sector -MWRIAmericanUniversity in CairoDepartment ofConstruction andArchitecturalEngineeringDepartment ofConstruction andArchitecturalEngineeringDepartment ofConstruction andArchitecturalEngineeringDepartment ofConstruction andArchitecturalEngineeringDepartment ofConstruction andArchitecturalEngineeringDepartment ofConstruction andArchitecturalEngineeringFull-TimeEnvironmentalMaster of EngineeringSystem DesignEnvironmentalEngineeringMaster of ScienceEnvironmentalFull-TimeMaster of EngineeringSystem DesignPart-TimeEnvironmentalMaster of EngineeringSystem DesignPart-TimeEnvironmentalMaster of EngineeringSystem DesignEnvironmentalEngineeringIntegratedCivil Eng. - Egyptian PublicAuthority for Drainage Projects Cairo University Engineering WaterResourcesManagementIntegratedCivil Eng. - Egyptian PublicAuthority for Drainage Projects Cairo University Engineering WaterResourcesManagementChemical Eng. - CentralChemical ChemicalLaboratory for Environmental Cairo UniversityEngineering EngineeringMonitoringDirector of Work - GeneralDirectorate for IrrigationImprovement, TantaCivil Eng. - Zagazig IntegratedWater Management DistrictResearcher Assist. - NileResearch Institute - NationalWater Research CenterResearcher Assist. - NileResearch Institute - NationalWater Research CenterResearcher Assist. - NileResearch Institute - NationalWater Research CenterResearcher Assist. - NileResearch Institute - NationalWater Research CenterResearcher Assist. - NileResearch Institute - NationalWater Research CenterResearcher Assist. - NileResearch Institute - NationalWater Research CenterResearcher Assist. - NileResearch Institute - NationalWater Research CenterIntegrated Water ResourcesManagement Unit - MWRIStatus of MS Degree Program ParticipantsIrrigation &Menoufia University Irrigation & Hydrauli HydraulicEngineeringClimateZagazig University EngineeringExchangeAin Shams Universit HydraulicsShoubra University HydraulicsAin Shams Universit HydraulicsAzhar University HydraulicsAin Shams Universit HydraulicsAin Shams Universit HydraulicsAin Shams Universit HydraulicsZagazig UniversityAssistant Manager- Civil Eng. -14 Eman Abdel Aziz Abdel Lateef Central Directorate for Shoubra University Civil EngineeringMaintenanceHydraulicEngineeringHydraulicEngineeringHydraulicEngineeringHydraulicEngineeringHydraulicEngineeringHydraulicEngineeringHydraulicEngineeringMaster of ScienceStudent Onacademic probation due toGPA less than 3.00Full-Time StudentSatisfactory ProgressStudentSatisfactory ProgressStudent Onacademic probation due toGPA less than 3.00Student Onacademic probation due toGPA less than 3.00Full-Time Student Didn't passthe Intensive EnglishLanguage and will retake it inSpring 2011ExpectedGraduation DateFall 2011Spring 2012Spring 2012Spring 2012Spring 2012Summer 2012M.Sc.of Science on-going Spring 2012M.Sc.of Science on-going Spring 2012M.Sc.of Science on-going Spring 2012M.Sc.of Science on-going Fall 2012M.Sc.of Science on-going Fall 2012M.Sc.of Science inCivil EngineeringM.Sc.of Science inCivil EngineeringM.Sc.of ScienceM.Sc.of Science inCivil EngineeringM.Sc.of Science inCivil EngineeringM.Sc.of Science inCivil EngineeringM.Sc.of Science inCivil EngineeringWorking on thesis Fall 2011Working on thesis Spring 2010Complete the Thesis -Waiting for the resultSummer 2010Working on thesis Spring 2012Working on thesis Fall 2011Working on thesis Spring 2012Working on thesis Spring 2012WaterWater EngineeringEngineering & M.Sc.of Science& Water StructureWater Structureon-going Spring 2012IntegratedWaterManagementM.Sc.of Science inCivil Engineeringon-going Fall 2012Task 2.4 PMP Indicators and TargetsYear 1 Year 2Task Indicator Units BaselineYr 2 Target Actual Target Qtr 32.4 Capacity Building of MWRI Personnel2.4.a Candidates selected Number 0 20 20 50 362.4.b Candidates accepted by AmericanUniversity Cairo and local universities Number 0 20 15 50 202.4.cCandidates graduated with M.S.degreesNumber 0 0 0 0 0Annual Report Year 2 (January – December 2010) 19


• Office signage and Project Overview Brochure posters were completed and installed at theIWRM II office, USAID, and the two Regional Offices.• Collaborated with USAID and MWRI on potential for a National Water ConservationCampaign. The MWRI wished to launch a campaign independent of other ministries tohighlight water conservation in irrigation. It was agreed that in the current market the targetbudget for a new broadcast campaign would be 1 million USD, of which the MWRI wasprepared to contribute 30% including WCU staff time. At the request of USAID, the WCUprepared a budget to support the MWRI’s National Communication Strategy, and CherylGroff prepared a proposal for funding from Coca-Cola/USAID Water and DevelopmentAlliance (WADA).• Finalized work on 3 new illustrations by the artist Mohamed Sami for use in banners, posters,and other public awareness materials. An illustration on water quality for a poster is inprogress with another illustrator, Yasser Gaessa.• Produced a set of 12 banners/posters in English providing an overview of the IntegratedWater Resource Management Project for display at USAID and the project office. 12 flipbooksof the banners were prepared to introduce key stakeholders to the project. A sub-setof 10 banners were produced in Arabic and distributed to the MWRI, all IWRM Regional,Directorate, Under Secretary, and District offices. A sub-set of 3 banners were producedand distributed to each BCWUA.• Work on a package of public awareness materials to support Task 1.3 with the introductionof high-value, low-water consuming crops is underway, including a 12-page newspaper and a15- minute video for farmers. A 2 nd draft rough-cut video has been prepared and is in review.Prior to initiating work on these materials meetings were held with representatives ofMUCIA, ACDI/VOCA, and the GTZ Egyptian-German Water Resources ManagementReform Program to determine need. All Arabic publications on relevant topics availablefrom the Ministry of Agriculture have been collected for consideration as part of thematerials package for BCWUAs.• Briefing Books were prepared for the USAID/MWRI/MIC Field Visit, and the WCU videocrew /photographer participated on the first 2 days of the tour.• An IWRM East Delta map was produced and distributed to all Directorates, UnderSecretaries and IWMDs.• A prototype photographic wall display of all IWRM activities was produced for the projectoffice and is being considered for replication and distribution.• Periodic field visits to IWMDs and BCWUAs have been conducted throughout the year toobserve training, discuss communication needs, encourage IWMD staff and initiate gatheringof success stories for further dissemination.• 10-week (2 session / week) training for five WCU staff on the video editing program, FinalCut Pro, was started and will be completed in January 2011.Annual Report Year 2 (January – December 2010) 21


Dur. (days)/ Event Date No. of Part.No. ofFemalesCode Course Title Task EventTask # 1.11 BCWUAs' Chairperson Orientation 1.1 14 1 Q3 757 02 BCWUA's MOU & Internal Regulations 1.1 9 1 Q4 350 393 BCWUA's Activation Workshop 1.1 7 2 Q4 262 82Task # 1.34Shifting to Grew High Value & Low WaterConsumption Crops 1.3 3 1 Q1/2 202 05 Field Day for Growers of Basil in W.Belbeis 1.3 1 1 Q2 27 06 Soil Analysis Workshop 1.3 2 1 Q2/3 105 37 Shifting to Improved on Farm Irrigation Systems 1.3 1 1 Q3 19 28 Farm Budget 1.3 1 1 Q3 22 09 Marketing & Contract Negotiation 1.3 1 1 Q3 22 010 Harvesting Sesame 1.3 1 1 Q3 26 011 Harvesting Basil 1.3 1 1 Q3 23 112 Winter Season Crops Informative 1.3 1 1 Q3 60 2Task # 2.213 Internal Local Basic Computer Skills 2.2 2 3 Q2 19 1014 Internal Local Internet Basic Skills 2.2 2 2 Q3 17 9Task # 2.315 Computer Maintenance 2.3 7 2 Q1 117 5016 Follow-Up of Water Level & Complaints DB 2.3 7 2 Q1 103 4117 Current Meters 2.3 7 2 Q1 193 3118 Water Distribution Methods & Procedures 2.3 7 1 Q1 54 2419 Water Quality Monitoring 2.3 10 2 Q3 158 3620 Digital Mapping 2.3 10 4 Q1 137 4721 Internal Local Digital Map Training 2.3 1 3 Q2 6 022 Water Flow Calibration 2.3 7 2 Q4 101 2523 Water Quality Database 2.3 7 2 Q4 61 2624 Ground Water Monitoring 2.3 5 2 Q4 106 32Task # 2.425 Overseas Study Tour to Turkey 2.3 1 7 Q1 13 3Public Awareness & Communication26 Mastering Final Cut Pro 7 Video Editing C.C 1 10 Q4 5 027 Information System Data Management Workshop C.C 1 1 Q4 59 5Total3024 468PROCUREMENTMrs. Amany Mahmoud (Office and Personnel Manager) is the coordinators for this activity. She isassisted by Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist), Eng. SafaaKhodary (IT Specialist) and the Regional Offices. Firras Traish, Procurement/Financial Specialist, issupporting the project as IRG home office backstop. Activities carried out during the Year 2 include:• Procurement in accordance with the procurement plan continued.• MWRI request for Year 2 procurement was received.• 61 Current meters were calibrated and distributed.• Current meter accessories were delivered and distributed.• 57 Fiber-glass boats have been distributed.• 60 air conditioners have been installed throughout the IWMDs & Directorate offices.• Apple Mac Computers (3) with Smart UPS were delivered to the Water Communication Unit.• Smart UPS (216) were delivered to all IWMDs, Directorates, and Undersecretary Offices.• Two portable agriculture field shredders were delivered to Shobra Kas CDA.• Landsat satellite image for E. Nile Delta (Feb 2008) was delivered to Ministry InformationCenter.Annual Report Year 2 (January – December 2010) 23


• Project Vehicles (3) were delivered and licensed.• Procurement of MWRI Year 2 items continued.• Data loggers (8) and modems (6) were delivered.• GW Measure Meter tapes (60) were received and distributed.• An up-dated equipment list was submitted to USAID for review and approval.• Procured an additional project vehicle.Status of the procurement is shown Annex F: Procurement Status Report.24 Annual Report Year 2 (January – December 2010)


3. ACTIVITIES PLANNED FORNEXT QUARTERTASK 1.1: FORMATION AND DEVELOPMENT OF BRANCH CANAL WATERUSER ASSOCIATIONSThe following activities are planned for the next quarter:• Dr. Stan Peabody, Expat Sociologist, will carry out an assignment to assist with Year 3implementation activities.• Conduct training “Completion of BCWUAs Activation” Phase II (9 events).• Monitor IWRM I BCWUAs.• Assist the General Directorate and IWMD Water Advisory Teams in implementing a publicawareness and communications program.• Support the IWMD in the completion of signing and endorsing the BCWUAs MOUs & IRsof 23/45 IWMDs by the Irrigation Under Secretaries.• Support the IWMDs & BCWUAs in Participatory maintenance Needs Assessments.• Conduct Water Advisory Team coordination meetings.TASK 1.2: SUSTAINABLE LOCAL FINANCING FOR CANAL AND DRAINMAINTENANCEThe following activities are planned for next quarter:• Dr. Stan Peabody, Expat Sociologist, will carry out an assignment to assist with preparationof the draft Cost Sharing guidelines.• Finalize the collection and analysis of documentation on local financing for canal & drainagemaintenance.• Conduct field investigations to evaluate BCWUA capability and willingness to participate in alocal financing program and jointly discuss with IWMD staff opportunities for cooperation.• Begin development of program of training and support.• Continue working on preparation of the Cost Sharing guidelines.TASK 1.3: IMPROVEMENTS IN WATER PRODUCTIVITY AND EFFICIENCYThe following activities are planned for the next quarter:• Issue the “Final Report for Summer Season 2010 Introducing High Value Crops to EastDelta”• Continue providing TA and monitoring the activity in the two pilot areas• Prepare the awareness material with technical and market information on HVCs and watersaving technologies for dissemination to the BCWUAs• Prepare a strategy for disseminating information on HVCs and water saving technologies toreach BCWUAs in East Delta Region.• Discuss the strategy with MALR Activity Coordinator• Arrange for a work shop for interested buyers on HVCs• Start orientation to MWRI and MALR staff in the interested IWMDsAnnual Report Year 2 (January – December 2010) 25


• Start orientation to BCWUA Chairpersons in the interested IWMDsTASK 1.4: WASTEWATER REUSEThe following activities are planned for the next quarter:• Meet with the HCWW Legal Committee to discuss the legal issue of leasing pilot areas of1000 feddan or less.• Meet with USAID and the HCWW to discuss next steps.TASK 2.1: REGIONAL WATER MANAGEMENT ORGANIZATIONSThe following activities are planned for next quarter:• Activities during the quarter will be defined and conducted subject to MWRIrecommendations on RWMO model.• Assuming MWRI approves a model for the RWMO, the first step will be supporting MWRIin the preparation of a business plan for the approved model.TASK 2.2: FORMATION AND DEVELOPMENT OF INTEGRATED WATERMANAGEMENT DISTRICTSThe following activities are planned for next quarter:• Participate in monthly Directorate meetings.• Participate in Quarterly maintenance meetings.• Continue support to the computer and office maintenance program.• Participate in Quarterly meetings related to IWRM I in the 5 General Directorates.• Conduct Basic Management Skills training course (8 events).• Conduct Advanced Integrated & Preventive Maintenance training (10 events).TASK 2.3: ESTABLISHMENT OF INFORMATION MANAGEMENT SYSTEMSFOR SUSTAINABLE WATERThe following activities are planned for next quarter:• Dr. Tom Sheng, Computer Assisted Development Inc., Expat Senior Water ResourcesManagement Information Systems Specialist will carry out an assignment to assist with Year3 implementation activities.• Continue developing water resource databases and support consolidation of the databases atthe Directorate level.• Complete groundwater monitoring training (2 events)• Conduct groundwater database training (8 events)• Conduct Digital Mapping of BC Area Survey training (8 events).• Complete calibration of the138 IWMD inflow/outflow monitoring sites.• Conduct Advanced Computer Maintenance training (8 events).• Supply a set of computer maintenance tools to the eight Directorates and 45 IWMDs to helpmaintain the computer equipment supplied by the project.• Complete Installation of additional 3 data loggers. Finalize selecting the additional new 8sites and finalize the procurement stage of the 8 new data loggers for the new sites.• Selection of one pilot branch canal in each of the eight target Directorates to test differentflow measurement techniques, structures, and types of equipment.• Attend monthly water distribution meetings.26 Annual Report Year 2 (January – December 2010)


TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNELThe following activities are planned for next quarter:• Monitor progress of the trainees.• Provide financial and logistical support for trainees.• Finalize contract with AUC.MONITORING AND EVALUATIONThe following activities are planned for the next quarter:• Assemble relevant secondary M&E data from all project IWMDs.• Begin monitoring district performance profiles to be prepared by IWMDs.• Assemble relevant secondary M&E data.• Continue collection of secondary MALR agricultural data for E. Nile Delta available for 2009& 2010.• Conduct the Winter 2010/11 crop GPS field survey to evaluate East Nile Delta cropdistribution.• Complete crop water requirement data from MISD database for year 2009 & 2010.• Back calculate delivery data from water level & calibration inflow/outflow equations for2009 & 2010.• Complete Target water supply data for 2009 and 2010.• Select pilot BCs and prepare a plan to collect reliable cropping pattern, yield, and priceinformation in a comprehensive way.EDUCATION, COMMUNICATION, PUBLIC AWARENESS ANDPARTICIPATIONThe following activities are planned for the next quarter:• Identify local communication consultant(s) to support project Communication and PublicAwareness program.• Update Communication Plan.• Prepare for Annual Work Plan Workshop• Finalize High-value, Low-water Crop communication materials and prepare for HVCoutreach event.• Produce Success Stories.Annual Report Year 2 (January – December 2010) 27


TRAININGThe following training courses are planned for next quarter:ID Course Title Task Event Venues1.1.3.1 Completion of BCWUAs Activation Phase II 1.1 9 Each Directorate1.2.3.1 BCWUA cost sharing 1.2 5 Each Directorate1.3.1.1 Dissemination of information on HVCs & Water 1.3 22 All BCWUAsConservation1.3.3.1 Staff building capacity for HVCs selection 1.3 22 Each District2.2.3.4 Integrated Maintenance Plan Update 2.2 10 Each Directorate2.2.3.5 Basic Management Skills 2.2 8 Each Directorate2.3.3.1 Advanced Computer Maintenance 2.3 8 Each Directorate2.3.3.3 Ground Water DB 2.3 8 Each Directorate2.3.3.5 Digital Mapping BC Areas 2.3 8 Each Directorate0.2.2 Annual Planning IWRM II Project Workshop x-cutting 1 TBDPROCUREMENTProcurement activities for next quarter include:• Continue procurement process. Purchase, deliver, and transfer all equipment to IWMDs andIWM Directorates in accordance with the procurement plan.• Update Life of Project procurement plan as required.28 Annual Report Year 2 (January – December 2010)


4. PROBLEMS AND ISSUESTASK 1.1: FORMATION AND DEVELOPMENT OF BRANCH CANAL WATERUSER ASSOCIATIONSDuring Year 1 the process of establishing the new IWMD structures on the Directorate and Districtlevels took longer than anticipated and delayed the start of training for BCWUA formation. Thetraining is now well underway and the program is back on schedule at the end of Year 2. TheBCWUAs with the IWMDs are in the process of identifying maintenance priorities and preparingaction plans. Monitoring and reporting by BWWUAs on Branch Canal water supply will begin at theend of Year 3 as part of the participatory water management program.Establishing BCWUAs covering 1200 branch canals in eight Directorates is a challenging undertaking.Adaptive management techniques have been applied to ensure that:• Priority on available project resources is given to establish and activate the BCWUAs.• Limited project resources are leveraged to ensure well-functioning, sustainable BCWUAs inall the Districts of the targeted Directorates.• BCWUAs are in place regardless of the status of the revision of Law 12 and they can adjustas necessary in the event that Law 12 is approved, or a ministerial decree is issued, providinglegal status to the BCWUAs and giving them authority to raise revenues from their members.• BCWUA participate in water resources decision-making and maintenance of the waterconveyance infrastructure.Originally, the USAID funded Integrated Water Management Unit (IWMU) was expected to take thelead on behalf of MWRI. USAID funding was discontinued for the IWMU on 1 April 2010 and theIWMU was closed on 1 September 2010. The project is in the process of reviewing TA and budgetrequirements with USAID and MWRI to adjust procedures to replace the IWMU contribution. IRGhas now hired staff on leave without pay from MWRI to support this Task.Priority has been given to implementation of the BCWUAs activities. Success in completing theactivities on schedule continues to depend on full commitment and support by MWRI. It isimportant that IWMDs have fully staffed Water Advisory Teams. It is essential that Under secretariesand General Directors take an active role in the formation and development of the BCWUAs.MWRI is aware of these issues and is doing everything it can to help resolve any problems wheneverthey arise.TASK 1.2: SUSTAINABLE LOCAL FINANCING FOR CANAL AND DRAINMAINTENANCEThe project originally was waiting for the approval of the Amendment to Law 12 BCWUA beforefinalizing the cost sharing guidelines. MWRI has indicated that implementation on a pilot basis cango ahead through Ministerial decrees. To our knowledge no Ministerial decrees including for theFayoum Water Users Organisation Project have been issued to date allowing the BCWUAs to makecontracts, open a bank account, or to collect fees. The legality of such a decree is also in question.Cost sharing guidelines are now under preparation and will be submitted for approval during Year 3.However sustainable implementation of activities under this Task is dependent on the approval ofthe Amendment to Law 12 that, among other things, will provide legal status to BCWUAs allowingthem to make contracts, open a bank account, and to collect fees. The Amendment is currently withthe Peoples’ Assembly Agricultural & Irrigation Committee for review.Annual Report Year 2 (January – December 2010) 29


TASK 1.3: IMPROVEMENTS IN WATER PRODUCTIVITY AND EFFICIENCYAssessment of water productivity as one of the project objectives is not easy to monitor directly inthe project area. To show improvements in water productivity it will be important to demonstratechanges in cropping patterns that benefit farmers and save water. The shift in the cropping patternand its corresponding water use will be evaluated over the life of the project. However, the numberof feddan on which the cropping pattern will change is relatively insignificant given the entire projectarea. For the short term, the project will rely on the change in productivity at the demo sites and theselected interested BCWUAs.USAID is encouraging IWRM II to work with MALR entities, private sector and NGOs on this Task.The project will rely on MALR data for estimating the value for each crop rotation to show the"increase in water use efficiency". Collecting cropping pattern information will be through theinformation provided by the MALR. Focus group information will be used to verify the field data.BCWUAs will play a key role in the successful implementation of Task 1.3. Buyers would like to havea strong and legal entity to work with. Until BCWUAs are recognized legally the project will rely onthe linking BCWUAs and Agriculture Cooperatives.The rapid expansion of this initiative may also need to take into account concern among projecttechnical staff regarding the appropriate timing of introducing this HVC initiative to newly formedBCWUAs. This needs to be monitored and studied further to ensure that BCWUAs are able to meettheir roles and responsibilities first and foremost as water user associations.Procurement funds proposed for carrying out demonstration site activities for Task 1.3(Improvements in Water Productivity and Efficiency) were not approved by USAID. Therefore,IWRM II will continue investigating ways to leverage funds or maximize the use of existing programsfrom potential partners.TASK 1.4: WASTEWATER REUSEWastewater reuse is not a main activity under HCWW mandate nor does the agency have strongexperience in agriculture and agribusiness. The project completed the feasibility study on reuse oftreated wastewater; however HCWW was unable to encourage investors to participate through a freeand open tender process. IRG proposed the concept of pilot areas with a size of 1000 feddan,because this is deemed a minimum to interest potential investors. . HCWW requested that IRGdiscuss this concept with the HCWW Legal Committee. If the Committee accepts the IRG conceptthis will open the opportunity for working on two pilots managed by investors.Although the use of treated waste water for irrigating commercial crops is practiced worldwide, theagro climatic conditions, soil conditions, availability of inputs, yields, and value chain opportunitiesvary by location. Most of the crops allowed under the Egyptian Code for wastewater reuse are beinggrown in Egypt. However, based on initial field visits and discussions with research agencies there islimited scientific information on a number of critical items needed to properly evaluate economicreturns on these crops. In the absence of local data the project relied on data available frominternational sources.IWRM II, at the request of USAID, provided support to turn over operation of the three wastewatertreatment facilities constructed under the Global Development Alliance (GDA) for “EnvironmentalServices for Improving Water Quality Management in Rural Areas in Egypt” between Coca ColaAfrica Foundation, USAID, MWRI, IRG, and UNICEF implemented under IWRM I. The level ofeffort and resources used to support this transfer were not part of the original IWRM II contract.30 Annual Report Year 2 (January – December 2010)


TASK 2.2: FORMATION AND DEVELOPMENT OF INTEGRATED WATERMANAGEMENT DISTRICTSThere are issues that still need to be addressed to ensure sustainable implementation of IWMDs. TheEgyptian Public Authority for Drainage Projects (EPADP) and the Irrigation Department (ID) haveagreed to transfer the drainage maintenance budget from EPADP Financial Department to IDFinancial Department for the purpose of maintaining and operating drainage facilities transferred tothe Integrated Water Management Directorates/Districts established under IWRM I & II. However,there are still some issues affecting integration of drainage activities at the District and Directoratelevels. Some of the larger drains remain under EPADP jurisdiction. Some of the drainage equipmenttransferred from EPADP to the newly formed IWMDs is in need of repair, but resources to affectthe needed repairs is lacking.To ensure sustainability MWRI has agreed to provide sufficient budget to support the expandedresponsibilities and roles of the newly formed IWMDs. However, the funds have either not beenrequested or released. MWRI is aware of this situation and is addressing these issues.Under the USAID Implementation Letter, IRG was dependent on IWMU to take a major role withimplementation of Task 2.2 activities. With the IWMU disbanded, additional TA resources will benecessary to support program implementation. The effects on the project budget and varioussolutions are under review.TASK 2.3: ESTABLISHMENT OF INFORMATION MANAGEMENT SYSTEMSFOR SUSTAINABLE WATERDelays have occurred in the implementation of several of the planned Task 2.3 activities for variousreasons. Because the IWMDs were not established until August 2009 instead of April 2009 asoriginally expected, the introduction of the MISD, water quality, and groundwater activities werepostponed until Year 2. Delays were experienced during May & June 2010 because of a moratoriumby MWRI on training to allow field engineers to focus on water distribution during the peak summerseason. Another setback occurred when a waiver request to contract the MWRI Regional TrainingCenter for Water Studies (RTCWS) as a training provider was denied by USAID. Finally, with theending of USAID funding and the closing of the IWMU, delays have occurred while the projectsearched for alternative mechanisms to support the training programs and activities previouslycarried out by IWMU.Under agreement with MWRI in accordance with the USAID Implementation Letter, IWMU was totake a major role with implementation of several Task 2.3 activities. With the IWMU beingdisbanded these activities are by necessity being taken over by IRG. Additional TA resources will benecessary to support program implementation. The effects on the project budget are under reviewand proposed solutions are being developed. With support from USAID and MWRI it is hoped thatimplementation of the planned activities for Year 2 & 3 can be completed by the end of Year 3.TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNELThere are issues that have limited implementation of this Task. Out of 50 MWRI personnelprogrammed for enrollment in the M.S. Program, only 36 were identified to by MWRI to participate.Only 20 of these persons were accepted and have been enrolled in M.S. programs.The M.S. degree at AUC requires two years for full-time graduate students if their English languageskills are strong enough to enable them to enroll directly in the M.S. program without extensiveEnglish language training. To date only one student selected had the required English languagecompetency. Others who were admitted to AUC had to complete the intensive language trainingAnnual Report Year 2 (January – December 2010) 31


program before starting degree related study. In addition, only three students have been either willingor approved for Leave-Without-Pay status from the MWRI. One qualified candidate accepted for theFall 2010 semester was not approved by MWRI and was required to drop the program. Three AUCcandidates were put on probationary status after completion of the Fall 2010 semester. Two of thesepersons are not on LWOP and both working and studying.It is unlikely that MWRI staff interested in participating in the AUC program, and not currentlyenrolled would be able to complete their degree before the end of the project (Sept. 2012). Therefore,no new applicants will be accepted to begin in Year 3 or 4. The only proposed exception for AUCwill be one student who is currently enrolled in the AUC Intensive English Program.For graduate students at the other local universities, usually 3 years are required to complete M.S.degrees attending on a part-time basis. The expenses of any students approved by the MWRIentering or continuing M.S. degrees at local universities will be covered up to the maximum of 50students.During Year 2, it became clear to both AUC and IRG that a fixed price Purchase Order was not aworkable contractual mechanism for this activity, and a new contract is with USAID contracts forapproval.USAID has decided to fund the remaining MWRI Study Tours through Coca-Cola/USAID Waterand Development Alliance (WADA). The project will assist USAID and MWRI as required butprime responsibility for the Study Tours will be with the WADA training provider (GlobalEnvironment & Technology Foundation-GETF).MONITORING AND EVALUATIONBecause the IWMD data systems are still being established all the outcome indicators for Year 1 and2 are not yet available. Relevant information such as water supply for Year 1 and 2, and waterdemand for Year 2 will be back calculated and included in future M&E reports.A number of steps are necessary before this data becomes available, so there will be delays in havingaccess to the data for M&E purposes. These steps include specifying IWMD boundaries, designatingauthorized measuring points for all significant inflows and outflows for each IWMD, developingrating curves for each measuring point, and computing water volumes from stage readings beingcollected as an ongoing function of the IWMDs. Likewise, linkage with local AgriculturalAdministration Unit and harmonization of MALR and MWRI boundaries is required before accuratecrop area data becomes available to the IWMDs. Fortunately, needed data on flows and on croppingpatterns can be computed retroactively, and so while there will be lags in reporting M&E informationbased on these data, a complete set of data should ultimately be available for all four years of theproject.EDUCATION, COMMUNICATION, PUBLIC AWARENESS ANDPARTICIPATIONGiven that the primary objectives of the IWRM II program are to build capacity and influence both waterusers and water suppliers to adopt new practices, strategic communication is viewed as key tosustainability of integrated water resource management. Communication is needed to rally and maintainsupport for the IWRM policy at the Central and Directorate levels; to motivate IWMD staff to practicedata based decision-making practices, and to value the benefits of water user participation; and to increasewater user participation in BCWUAs. Public awareness is needed to strengthen the associations, tomake the process increasingly representative and democratic, and to provide water users with theinformation needed to increase water productivity and improve water quality. Particularly in Year 3 with32 Annual Report Year 2 (January – December 2010)


the focus on activation of the BCWUAs, strengthening of IWMDs, and the promotion of the pilotinitiatives in High-value, low-water use crops, strategic communication is critical to success.An increase in effort is needed to support communication, particularly at the IWMD level. It is plannedthat in Year 3, selected members of the Water Advisory Teams be identified and trained to serve ascommunication specialists in their respective IWMDs and Directorates. IWRM II will provide specializedtrainings and follow-up with this cadre of Communication Specialists. The IRG Expat CommunicationConsultant will continue on a regular short term basis with support from various local communicationspecialists. IRG will also continue to search for a qualified senior local specialist acceptable to USAID tojoin the IWRM II TA team to provide long term support.TRAININGBecause of summer water shortages and the need to have district staff in the field full time, MWRIrequested all May & June 2010 training be postponed until July. This postponement delayedimplementation of certain components of the training program. MWRI is aware of this situation andis doing everything it can to help accelerate the training program. Improved proceduresrecommended by MWRI (Irrigation Department) for approval of training schedules and trainerswere implemented.Unfortunately, the Annual Year 2 Workshop scheduled for April 24 – 26 was postponed initially atthe request of MWRI and ultimately that of USAID. As a consequence the project was not affordedan opportunity to present the annual work plan to HE Minister and USAID for formal comment.Because the IWMU was dissolved and staff reassigned to other sectors in the Ministry, these personsare no longer available to assist with training activities.To continue to engage qualified MWRI staff in the project training programs and to ensuresustainability, IRG was hoping to have MWRI Regional Training Center for Water Studies (RTCWS)conduct a number of the training courses. Unfortunately, because of RTCWS’s status as agovernment organization, a waiver is required from USAID. USAID has informed IRG that theycannot support a sole source justification needed to approve the waiver. As a result the GIS DigitalMapping Course and Groundwater Monitoring Course scheduled for August were postponed.Potential training providers are being identified (MWRI staff, local firms, and local consultants) toconduct the following courses: Management Skills, Administration of Contracts, Water QualityDatabase, Groundwater Monitoring, Groundwater Database, Water Flow Calibration, Intro to GISDigital Mapping, and Digital Maps/BC Areas Survey.PROCUREMENTDuring Year 2 MWRI submitted additional equipment requirements for consideration. Sufficientfunds were available to cover these items, but USAID approval was denied on the grounds that allfuture procurements should be used to support the IWMDs and Directorates in the East DeltaRegion, not at the MWRI central level even though they have been supporting IWRM II. This will bereviewed during preparation of the Year 3 Procurement Plan update process.Annual Report Year 2 (January – December 2010) 33


International Resources GroupAnnex A: M&E Plan UpdateANNEX A: MONITORING ANDEVALUATION PLAN UPDATEYear 2(January – December 2010)34 Annual Report Year 2 (January – December 2010)


International Resources GroupAnnex A: M&E Plan UpdateTable of TablesTable 1 IWRM II Objectives and Tasks ................................................................................................. 37Table 2 IWRM II Implementation Indicators, Water Users ............................................................. 38Table 3 IWRM II Implementation Indicators, Water Suppliers ...................................................... 39Annual Report Year 2 (January – December 2010) 35


International Resources GroupAnnex A: M&E Plan UpdatePerformance Monitoring PlanA Performance Monitoring Plan 1 (PMP) wasproduced in July 2009 to guide the M&Eprogram for the project. Its purpose was (a)to provide feedback to project managersduring project implementation and (b) toprovide a comprehensive and coherentinformation base which can be used to assessits outcomes. Definitions of some basicterms used in this report are shown in thebox at right. More detail can be found in thePMP.The PMP employs two types of indicators.Implementation (Process) indicators monitorthe progress of implementing the project.They deal with the pace of activitiesundertaken by the project. Outcome(Results) indicators assess the cumulativeeffects of project activities on the project’sobjectives.M&E DefinitionsA goal is a broad statement of what a program wouldlike to accomplish. It portrays a positive futurecondition.Objectives are specific, measurable, appropriate,realistic, and time-bound statements describing whatthe project hopes to accomplish.Indicators are objectively measurable gauges ofprogress toward achieving an objective or measuringthe impact of a specific intervention.Targets are specific values of indicators that theprogram wishes to achieve through its actions.A baseline provides a starting point from which tomeasure progress.The Year 1 Annual M&E report covers the period from 25 January 2009 to 31 December 2009,Years 2 and 3 will cover calendar years 2010 and 2011 respectively, and Year 4 will cover the period 1January 2012 through 30 September 2012, the project completion date. Outcome indicators, however,are related to agricultural seasons and so each annual report will cover the summer season of thatyear (May through September), along with the previous winter cropping season (October throughApril).Project ObjectivesIWRM II ObjectivesThe primary objectives of IWRM II, as given in the TaskOrder, are shown in the box at the right. To achieve theseobjectives, the project identifies eight principal tasks,which are shown below.1. Increased productivity of waterresources2. Increased efficiency of waterresources1. Formation and development of Branch Canal Water 3. More equitable allocation of waterUser Associations (BCWUAs)resources2. Sustainable local financing for canal and drainmaintenance4. Improved water quality3. Improvements in water productivity and efficiency4. Wastewater reuse5. Regional water management organizations6. Formation of Integrated Water Management Districts (IWMDs)7. Establishment of information management systems8. Capacity building of MWRI personnel1 IRG. 2009. Performance Monitoring Plan, Report no. 6. Cairo: MWRI, IWRM II project.36 Annual Report Year 2 (January – December 2010)


International Resources GroupAnnex A: M&E Plan UpdateAs explained in the PMP, project objectives serve as the basis for the Results indicators of projecteffectiveness. The 8 tasks, on the other hand, are the basis for the Implementation indicators.Table 1 shows the relationship between the 4 project objectives and the 8 project tasks. Majorcontributions to project objectives are shown by solid circles. Secondary contributions are shown byopen circles. Note that these are informal judgments by the author and not the result of a formalprocess. The table simply illustrates the nature of the relationship between the project’s objectivesand tasks and provides a basis for the M&E plan which follows.Project ObjectivesProject TasksIncreased productivity ofwater resourcesIncreased efficiency ofwater resourcesMore equitable allocation ofwater resources1 Formation and development of BCWUAs • • •2 Sustainable local financing for canal and drain maintenance ○ •3 Improvements in water productivity and efficiency • • •4 Wastewater reuse • ○5 Regional water management organizations ○ ○6 Formation of IWMDs ○ • •7 Establishment of information management systems ○ • • ○8 Capacity building of MWRI personnel • • •Improved water qualityTable 1 IWRM II Objectives and TasksImplementation IndicatorsImplementation indicators are used to monitor the execution of project activities. They monitor theinputs supplied by the project to achieve desired change. Because they are related directly to projectinputs, they can be keyed to the 8 project tasks shown in Table 1. Implementation indicators,organized by project task, are shown in Tables 2, and 3.Creation of the implementation indicators is simple and straightforward. Most are simply numbers ofoccurrences (e.g. “number of IWMDs with training centers established an equipped) which aresummed across Districts and reported against targets.Target values have been established for the four years of the project for these indicators, togetherwith a set of baseline values that represent pre-project conditions. In general, baseline values of theindicators used in this project will be zero. If necessary, targets will be adjusted as the projectprogresses.Annual Report Year 2 (January – December 2010) 37


International Resources GroupAnnex A: M&E Plan UpdateTable 2 IWRM II Implementation Indicators, Water UsersIWRM II M&E IndicatorsTask Indicator UnitsCumulative Targets and AccomplishmentsBaselineYear 1 Year 2 Year 3 Year 4Target Actual Target Actual Target Actual Target Actual1.1 Formation and Development of Branch Canal Water User Associations (BCWUAs)1.1.a Number of IWMDs with staffedWater Advisory TeamsNumber 0 45 45 45 45 45 451.1.b Number of GDs with staffed WaterAdvisory TeamsNumber 0 8 8 8 8 8 81.1.c Share of planned BCWUAsestablished by Ministerial decreePercent 0 50 0 100 100 100 1001.1.d Share of BCWUAs withmaintenance priorities and action Percent 0 0 0 50 0 100 100plans1.1.e Share of BCWUAs monitoring andreporting on Branch Canal water Percent 0 0 0 50 0 100 100supply1.2 Sustainable Local Financing for Canal and Drain Maintenance1.2.a Decree prepared and submittedfor approval0/1 0 1 1 1 1 1 11.2.b BCWUA cost sharing systemguidelines submitted for approval0/1 0 1 0 1 0 1 11.2.c Cost sharing system guidelinesimplemented on Branch CanalsNumber 0 0 0 0 0 22 451.31.3.aImprovements in Water Productivity and EfficiencyNumber of farmers receivingtraining on High-Value Crops and Number 0 100 0 300 502 500 800water saving technology1.4 Wastwater Reuse1.4.a Feasibility plan submitted forapproval0/1 0 1 0 1 1 1 11.4.b Number of partnership agreementssignedNumber 0 0 0 0 0 2 2Individual tasks related to water users are discussed briefly below. Additional information is found inthe Year 3 Work plan of the project.Task 1.1: BCWUA FormationWater Advisory Teams were established in all 45 Districts and all 8 general directorates during Year1. During Year 2, a ministerial decree establishing all of the BCWUAs was issued. Maintenance planpreparation and water monitoring and reporting by BCWUAs was scheduled to begin on half of theBCWUAs during Year 2, but these activities have not yet been completed.Task 1.2: Sustainable Local FinancingThe use of a Ministerial decree to authorize BCWUAs to collect fees, make contracts, open bankaccounts is legally questionable. Instead of a draft Ministerial decree a new WUA Law was draftedand sent to the Cabinet in April 2010. It requires action by parliament before becoming effective,which is still pending. Cost sharing guidelines are not yet completed, pending enactment of theamendment to Law 12.Task 1.3: Water Productivity and EfficiencyThe target was for 300 farmers to have received training as of the end of Year 2. In practice, 502farmers received training.Task 1.4: Wastewater ReuseThe draft feasibility plan was completed in June and was reviewed informally by the HoldingCompany for Water and Wastewater (HCWW). It is awaiting a formal review meeting, which is tobe arranged by HCWW.38 Annual Report Year 2 (January – December 2010)


International Resources GroupAnnex A: M&E Plan UpdateTable 3 IWRM II Implementation Indicators, Water SuppliersIWRM II M&E IndicatorsTask IndicatorCumulative Targets and AccomplishmentsBaselineYear 1 Year 2 Year 3 Year 4UnitsTarget Actual Target Actual Target Actual Target Actual2.1 Regional Water Management Organizations2.1.a Business plan submitted to MWRIfor approval0/1 0 0 0 1 0 1 12.1.b Business plan implemented 0/1 0 0 0 0 0 0 12.2 Formation and Development of Integrated Water Management Districts (IWMDs)2.2.a Number of IWMDs establishedwith fully staffed senior positionsNumber 0 45 45 45 45 45 452.1.b Number of IWMDs with completedintegrated maintenance plansNumber 0 0 0 45 45 45 452.2.c Number of IWMDs with a trainingroom established and equippedNumber 0 20 0 45 45 45 452.2.d Number of General Directorateswith a computer training center Number 0 8 4 8 8 8 8established and equipped2.2.e Number of IWRM I IWMDsparticipating in coordination Number 27 27 27 27 27 27 27meetings2.32.3.aEstablishment of information Management Systems for Sustainable Water Resources ManagementNumber of IWMDs with calibrationsfor all authorized inflow and outflow Number 0 0 0 45 0 45 45structures2.3.b Number of IWMDs with MISDinstalled and operationalNumber 0 0 0 45 0 45 452.3.c Number of IWMDs with completedand approved water resource Number 0 0 0 0 0 45 45management plan2.3.d Number of IWMDs with waterresource information systems Number 0 0 0 45 0 45 45installed and operational2.3.e Number of Branch Canals withflows monitored by IWMDNumber 0 0 0 0 1 9 452.4 Capacity Building of MWRI Personnel2.4.a Candidates selected Number 0 20 20 50 36 50 502.4.b Candidates accepted by AmericanUniversity Cairo and localNumber 0 20 15 50 20 50 50universities2.4.c Candidates graduated with M.S.degreesNumber 0 0 0 0 0 20 50Individual tasks related to water suppliers are discussed briefly below.Task 2.1: Regional Water Management OrganizationsThe Ministry is still considering options for the formation of regional water managementorganizations, thus a business plan has not yet been prepared.Task 2.2: IWMD FormationAll 45 IWMDs and Integrated Directorates were established through a single ministerial decreeissued during Year 1. A second decree was also issued for each integrated directorate defining theboundaries of the integrated directorates and districts. A third decree was issued assigning all seniorstaff to the integrated directorates and districts. All 45 Integrated Districts have completed integratedmaintenance plans and all 45 have training rooms established and equipped. All 8 GeneralDirectorates have operational computer training centers. All 27 IWRM I IWMDs continue toparticipate in monthly coordination meetings.Annual Report Year 2 (January – December 2010) 39


International Resources GroupAnnex A: M&E Plan UpdateTask 2.3: Information Management System EstablishmentSeveral activities related to information management system establishment were scheduled forcompletion in Year 2 in all 45 Districts. These included calibrating canal structures, installing andemploying MISD software, and installing and employing water resource information systems.Water monitoring networks were established and calibration of the 138 inflow/outflow structures isongoing.An MISD spreadsheet for monitoring biweekly crop data was installed at all the integrated districts.This information is sent to the Central Directorate for Water Distribution and used to schedule waterdeliveries to the eight integrated directorates on a 10 day basis.Five out of six of the planned water resources information systems have been installed and areoperational (complaints, water levels, water quality, MISD, and BCWUA). The ground water database will be installed early in Year 3.Guidelines for completing the integrated water resources management plan have been distributed tothe eight directorates and 45 districts. IWRM II will provide training on both subjects and assist thedistricts and directorates prepare an annual integrated water resources management plan in Year 3.One BC has been equipped with a chart recorder to measure inflows, though none were called foruntil Year 3. The BC is one of the two pilot water productivity improvement BCs and thisinformation will be useful in measuring changes in water productivity on the pilot BC. It isrecommended that the other pilot BC also be equipped with a water level recorder or data logger assoon as possible and that any additional BCs added to the program be so equipped as well.Task 2.4: Capacity BuildingFor the university-level capacity building component, 36 candidates were originally identified in Year1 and 20 have been admitted and/or enrolled, 6 to American University of Cairo (AUC) and 14 tolocal universities. Because it generally takes 3 years to complete the course of study, including Englishlanguage training, it is unlikely that any additional candidates will participate in this program.40 Annual Report Year 2 (January – December 2010)


ANNEX B: ANNUAL FINANCIALREPORTYear 2(January – December 2010)Annual Report Year 2 (January – December 2010) 41


International Resources GroupAnnex B: Annual Financial ReportTable of TablesTable 4: USD Budget (US$) ..................................................................................................... 43Table 5: LE Budget (EGP) ...................................................................................................... 4442 Annual Report Year 2 (January – December 2010)


International Resources Group Annex B: Annual Financial ReportTable 4: USD Budget (US$)Budget Line Item Budgeted Obligated CurrentClaim(Oct-Dec10)Claims to Date(Thru Dec 10)ProjectedExpenses forNext Quarter(Jan-Mar 11)RemainingBudgetBalance% BudgetClaimedSalaries 1,121,498 98,414 611,830 70,000 509,668 55%Overhead andFringes345,848 34,007 233,874 20,000 111,974 68%Consultant Labor 267,212 0 61,632 20,000 205,580 23%Other Direct Costs 676,501 32,357 302,526 40,000 373,975 45%Procurement 525,000 0 217,803 100,000 307,197 41%G&A 611,710 40,371 349,675 36,750 262,035 57%Subcontractors 188,487 42,177 128,052 20,000 60,435 68%SubcontractorHandling7,539 1,898 5,459 800 2,080 72%Subtotal 3,743,795 249,224 1,910,851 307,550 1,832,944 51%Fixed Fee 187,190 12,461 95,543 16915 91,647 51%Adjustments 0 -4,535 -32,167 -3,887Total Cost PlusFixed FeeSource: IRG Invoices #506101- 23RemainingObligationBalance% ObligationClaimed3,930,985 3,000,000 257,150 1,974,227 320,578 1,956,758 50% 1,025,773 66%Annual Report Year 2 (January – December 2010) 43


International Resources Group Annex B: Annual Financial ReportTable 5: LE Budget (EGP)Budget Line Item Budgeted Obligated CurrentClaim(Oct-Dec10)Salaries5,779,775Overhead andFringe 1,142,061ConsultantLabor 2,554,435Other DirectCosts 9,445,842ProcurementG&ASubcontractors 17,000,0004,943,918700,000Source: IRG Invoices #506201-21Note: 1 Budget realignment under preparation.Claims toDate(Thru Dec10)ProjectedExpenses forNextQuarter(Jan-Mar 11)RemainingBudgetBalance% BudgetClaimed455,091 3,096,151 500,000 2,683,624 54%0 0 0 1,142,061 0%0 0 0 2,554,435 0%651,174 4,743,544 800,000 4,702,298 50%306,280 5,603,004 250,000 1,396,996 80%271,035 1,920,727 367,500 3,023,191 39%93,720 1,791,260 200,000 -1,091,260 256%Subcontract0 18,000 314,683 76,000 -314,683Handling 1SubtotalFixed Fee31,566,0311,578,302Adjustments 0 0 -528,217Total Cost PlusFixed Fee 33,144,3331,795,300 17,469,368 2,193,500 14,096,663 55%89,765 873,468 109,675 704,834 55%RemainingObligationBalance% ObligationClaimed29,000,000 1,885,065 17,814,619 2,303,175 15,329,714 54% 11,218,328 61%Annual Report Year 2 (January – December 2010) 44


ANNEX C: TABLE OF REPORTSYear 2(January – December 2010)Annual Report Year 2 (January – December 2010) 45


International Resources GroupAnnex C: Table of ReportsTable of TablesTable 6: Table of Reports ............................................................................................................................. 4746 Annual Report Year 2 (January – December 2010)


International Resources GroupAnnex C: Table of ReportsTable 6: Table of ReportsNo. NAME DATE1 Annual Work Plan Year 1(January – December 2009) March 20092 Quarterly Report Year 1: 1st Quarter (January–March 2009) April 20093 Economic Feasibility of Alternative Crops with Potential for the Reuse of May 2009Treated Wastewater in Egypt4 Communication Plan May 20095 IWRM I BCWUA Assessment July 20096 Performance Monitoring Plan July 20097 Farmer Baseline Survey July 20098 MWRI Training Needs Assessment July 20099 Quarterly Report Year 1: 2nd Quarter (April – June 2009) July 200910 Quarterly Report Year 1: 3rd Quarter (July – September 2009) October 200911 Annual Work Plan Year 2 (January–December 2010) December 200912 Annual Report Year 1 (January–December 2009) January 201013 Quarterly Report Year 2: 1st Quarter (January–March 2010) April 201014 Feasibility of Wastewater Reuse with Annexes (Final Draft) June 201015 Quarterly Report Year 2: 2nd Quarter (April – June 2010) July 201016 Quarterly Report Year 2: 3rd Quarter (July –September 2010) October 201017 Annual Work Plan Year 3 (January–December 2011) (Final Draft) December 201018 Annual Report Year 2 (January–December 2010) January 2011Annual Report Year 2 (January – December 2010) 47


International Resources GroupAnnex D: TA ReportANNEX D: TECHNICALASSISTANCE TABLEYear 2(January – December 2010)48 Annual Report Year 2 (January – December 2010)


International Resources GroupAnnex D: TA ReportOriginal(days)Approved(days)Used(days) Yr 1 Yr 2No. Name Position Firm Budget Task1 Jeffrey Fredericks Chief of Party (COP) IRG USD Cross-Cutting 996 996 467 238 2602 Andy Tczap Acting Chief of Party (COP) IRG USD Cross-Cutting 49 49 49 03 Ken Swanberg Deputy Chief of Party (DCOP)/Agricultural Economist IRG USD Task 1.3, 1.4 780 780 80 80 04 Russ Misheloff Home Office Project Manager IRG USD Cross-Cutting 20 20 15 5 105 Firras Traish Home Office Project Coordinator IRG USD Cross-Cutting 60 60 22 12 106 Firras Traish Finance/Close-Out Specialist IRG USD Cross-Cutting: Admin 5 5 0 0 07 Russ Misheloff Senior Economist IRG USD Task 1.4 19 1 188 Firras Traish Procurement Specialist IRG USD Cross-Cutting: Procurement 10 10 24 15 99 Cheryl Groff Senior Communications and Public Awareness Specialist IRG USD Task 2.4, Cross-Cutting: Public Awareness 101 260 250 0 25010 Darryl Kuhnle Communications and Public Awareness Specialist IRG USD Cross-Cutting: Public Awareness 30 30 30 30 011 Joan Ablett Communications and Public Awareness Specialist IRG USD Cross-Cutting: Public Awareness 9 9 9 9 012 Mark Svendsen Monitoring and Evaluation Specialist; IRG USD Cross-Cutting:M&E 90 90 52 37 1513 Jim Dempsey Institutional/Organizational Development Specialist IRG USD Task 1.4 50 27 27 15 1214 TBD Irrigation Agronomist IRG USD 70 0 015 Stan Peabody Sociologist IRG USD Task 1.1,1.2,1.3 70 70 68 48 2016 Tom Sheng Water Resources MIS Specialist CADI USD Task 2.2,2.3 82 82 71 40 3217 Nabil Fawzi Senior Water Resource Management Specialist IRG EGP Task 1.1,1.2,2.1,2.2,2.3;Cross-Cutting: Procurement, Training 996 996 498 238 26018 Maher Khodary Senior Water Resources Management Specialist (Zagazig) IRG EGP Task 1.1,1.2,2.1,2.2,2.3 996 996 498 238 26019 Wadie Mankarious Senior Organization/Institutional Development Specialist IRG EGP Task 1.3, 1.4;Cross-Cutting: Procurement, Public Awareness 996 996 498 238 26020 Amany Mahmoud Office Manager - Cairo IRG EGP Cross-Cutting: Admin, Procurment 996 996 498 238 26021 Alaa Hafez Accountant Cairo IRG EGP Admin 195 195 195 195 022 Iman Choucri Accountant Cairo IRG EGP Admin 563 563 238 0 23823 Dahlia Hamdy Training Specialist - Cairo IRG EGP Cross-Cutting:Training 996 996 498 238 26024 Ramy Galy Regional Officer - Zangazig IRG EGP Admin 996 996 498 238 26025 Waleed Al-Refai Regional Officer - Mansoura IRG EGP Admin 996 996 368 108 26026 TBD Water Resources Management Specialist IRG EGP 120 120 0 0 027 TBD Management Information Systems Specialist IRG EGP 400 400 0 0 028 Moamen El Sharkawy Organization/Institutional Development Specialist IRG EGP Task 1.1,1.2 0 90 90 0 9029 Amira Abdel Hady Organization/Institutional Development Specialist IRG EGP Task 1.1,1.2 0 90 90 0 9030 TBD Communication and Public Awareness Specialist IRG EGP 400 400 0 031 TBD IT Specialist IRG EGP 400 400 0 032 TBD Agricultural Organizational Devel. Specialist IRG EGP 320 320 0 033 Walid Yehia Sallam Agricultural Economist IRG EGP 0 75 75 0 7534 TBD Task 1.3 Ag Productivity Specialist IRG EGP 125 125 0 035 TBD Task 1.4: Wastewater Reuse Specialist IRG EGP 125 125 0 036 Ibrahim Elassiouti Water Resources Training Specialist IRG EGP Cross-Cutting: Training, M&E 240 240 240 206 3437 TBD Monitoring and Evaluation Specialist IRG EGP 400 400 0 038 TBD Irrigation and Drainage Maintenance Specialist IRG EGP 200 200 0 039 TBD Soil and Water Agronomist IRG EGP 200 200 0 040 TBD PPP Specialist IRG EGP 70 70 0 041 Sami Yacoub Senior Organization/Institutional Development Specialist IRG EGP Task 1.4 0 30 30 6 24Expat 2,373 2,488 1,182 577 636Local 10,730 11,015 4,316 1,945 2,371Total 13,103 13,503 5,498 2,522 3,007Annual Report Year 2 (January – December 2010) 49


International Resources GroupAnnex E: Annual Training ReportANNEX E: ANNUAL TRAININGREPORTOverseas and In-countryYear 2(January – December 2010)50 Annual Report Year 2 (January – December 2010)


International Resources GroupAnnex E: Annual Training ReportTable of Contents1. TASK 1.1: FORMATION AND DEVELOPMENT OF BCWUAS 522. TASK 1.2: SUSTAINABLE LOCAL FINANCING FOR CANALAND DRAIN MAINTENANCE 523. TASK 1.3: WATER PRODUCTIVITY AND EFFICIENCY4. TASK 2.2: FORMATION AND DEVELOPMENT OF INTEGRATEDWATER MANAGEMENT DISTRICTS 555. TASK 2.3: ESTABLISHMENT OF INFORMATIONMANAGEMENT SYSTEMS FOR SUSTAINABLE WATERRESOURCES MANAGEMENT 556. TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNEL 577. MONITORING AND EVALUATION 578. CROSS CUTTING TASK 57Annual Report Year 2 (January – December 2010) 51


International Resources GroupAnnex E: Annual Training ReportTask 1.1: Formation and Development of BCWUAsCode Course Title Task Type Dur. Start Date End Date Directorate No. of Part.No. ofFemalesTask # 1.11.1.2.3.1 BCWUAs' Chairperson Orientation 1.1 Workshop 1 4-Jul-10 4-Jul-10 Qualubia 57 01.1.2.3.2 BCWUAs' Chairperson Orientation 1.1 Workshop 1 5-Jul-10 5-Jul-10 Qualubia 59 01.1.2.3.3 BCWUAs' Chairperson Orientation 1.1 Workshop 1 6-Jul-10 6-Jul-10 E.Sharkia 47 01.1.2.3.4 BCWUAs' Chairperson Orientation 1.1 Workshop 1 7-Jul-10 7-Jul-10 E.Sharkia 52 01.1.2.3.5 BCWUAs' Chairperson Orientation 1.1 Workshop 1 11-Jul-10 11-Jul-10 Salhiya 55 01.1.2.3.6 BCWUAs' Chairperson Orientation 1.1 Workshop 1 12-Jul-10 12-Jul-10 Salhiya 45 01.1.2.3.7 BCWUAs' Chairperson Orientation 1.1 Workshop 1 13-Jul-10 13-Jul-10 Ismailia 64 01.1.2.3.8 BCWUAs' Chairperson Orientation 1.1 Workshop 1 14-Jul-10 14-Jul-10 Damietta 34 01.1.2.3.9 BCWUAs' Chairperson Orientation 1.1 Workshop 1 15-Jul-10 15-Jul-10 El Salam 66 01.1.2.3.10 BCWUAs' Chairperson Orientation 1.1 Workshop 1 18-Jul-10 18-Jul-10 S.Dakahlia 47 01.1.2.3.11 BCWUAs' Chairperson Orientation 1.1 Workshop 1 19-Jul-10 19-Jul-10 S.Dakahlia 57 01.1.2.3.12 BCWUAs' Chairperson Orientation 1.1 Workshop 1 25-Jul-10 25-Jul-10 E.Dakahlia 53 01.1.2.3.13 BCWUAs' Chairperson Orientation 1.1 Workshop 1 26-Jul-10 26-Jul-10 E.Dakahlia 64 01.1.2.3.14 BCWUAs' Chairperson Orientation 1.1 Workshop 1 27-Jul-10 27-Jul-10 E.Dakahlia 57 01.1.2.4.1 BCWUA's MOU & Internal Regulations 1.1 Training 1 26-Sep-10 26-Sep-10 Qualubia 32 41.1.2.4.2 BCWUA's MOU & Internal Regulations 1.1 Training 1 27-Sep-10 27-Sep-10 Qualubia 32 31.1.2.4.3 BCWUA's MOU & Internal Regulations 1.1 Training 1 28-Sep-10 28-Sep-10 E.Sharkia 40 31.1.2.4.4 BCWUA's MOU & Internal Regulations 1.1 Training 1 29-Sep-10 29-Sep-10 Salhiya 49 61.1.2.4.5 BCWUA's MOU & Internal Regulations 1.1 Training 1 30-Sep-10 30-Sep-10 Ismailia 43 61.1.2.4.6 BCWUA's MOU & Internal Regulations 1.1 Training 1 2-Oct-10 2-Oct-10 S.Dakahlia 38 51.1.2.4.7 BCWUA's MOU & Internal Regulations 1.1 Training 1 3-Oct-10 3-Oct-10 Damietta & El Salam 50 51.1.2.4.8 BCWUA's MOU & Internal Regulations 1.1 Training 1 4-Oct-10 4-Oct-10 E.Dakahlia 33 41.1.2.4.9 BCWUA's MOU & Internal Regulations 1.1 Training 1 5-Oct-10 5-Oct-10 E.Dakahlia 33 31.1.2.5.1 BCWUA's Activation Workshop 1.1 Workshop 2 1-Nov-10 2-Nov-10 Qualubia 42 111.1.2.5.2 BCWUA's Activation Workshop 1.1 Workshop 2 3-Nov-10 4-Nov-10 E.Sharkia 30 101.1.2.5.3 BCWUA's Activation Workshop 1.1 Workshop 2 6-Nov-10 7-Nov-10 S.Dakahlia 30 161.1.2.5.4 BCWUA's Activation Workshop 1.1 Workshop 2 8-Nov-10 9-Nov-10 Damietta & El Salam 40 121.1.2.5.5 BCWUA's Activation Workshop 1.1 Workshop 2 10-Nov-10 11-Nov-10 E.Dakahlia 45 111.1.2.5.6 BCWUA's Activation Workshop 1.1 Workshop 2 21-Nov-10 22-Nov-10 Salhiya 40 101.1.2.5.7 BCWUA's Activation Workshop 1.1 Workshop 2 23-Nov-10 24-Nov-10 Ismailia 35 121.1.2.6.3 Water Advisory Meeting 1.1 Meeting 1 11-Jan-10 11-Jan-10E.Sharkiya, Ismailia,Salhiya & Qualubiya 7 51.1.2.6.4 Water Advisory Meeting 1.1 Meeting 1 12-Jan-10 12-Jan-10Damietta & SalamS.&E.Dakahliya 10 51.1.2.6.5 Water Advisory Meeting 1.1 Meeting 1 16-Feb-10 16-Feb-10E.Sharkiya, Ismailia,Salhiya & Qualubiya 38 101.1.2.6.6 Water Advisory Meeting 1.1 Meeting 1 17-Feb-10 17-Feb-10Damietta & SalamS.&E.Dakahliya 11 31.1.2.6.7 Water Advisory Meeting 1.1 Meeting 1 18-Feb-10 18-Feb-10 S.&E.Dakahliya 18 121.1.2.6.8 Water Advisory Meeting 1.1 Meeting 1 16-Mar-10 16-Mar-10E.Sharkiya, Ismailia,Salhiya & Qualubiya 9 71.1.2.6.9 Water Advisory Meeting 1.1 Meeting 1 17-Mar-10 17-Mar-10Damietta & SalamS.&E.Dakahliya 10 51.1.2.6.10 Water Advisory Meeting 1.1 Meeting 1 28-Apr-10 28-Apr-10Damietta & SalamS.&E.Dakahliya 10 51.1.2.6.11 Water Advisory Meeting 1.1 Meeting 1 29-Apr-10 29-Apr-10E.Sharkiya, Ismailia,Salhiya & Qualubiya 6 41.1.2.6.12 Water Advisory Meeting 1.1 Meeting 1 25-May-10 25-May-10 East Dakahlia 5 31.1.2.6.13 Water Advisory Meeting 1.1 Meeting 1 30-Jun-10 30-Jun-10E.Sharkiya, Ismailia,Salhiya & Qualubiya 4 41.1.2.6.14 Water Advisory Meeting 1.1 Meeting 1 1-Jul-10 1-Jul-10Damietta & SalamS.&E.Dakahliya 4 21.1.2.6.15 Water Advisory Meeting 1.1 Meeting 1 8-Aug-10 8-Aug-10E.Sharkiya, Ismailia,Salhiya & Qualubiya 5 41.1.2.6.16 Water Advisory Meeting 1.1 Meeting 1 9-Aug-10 9-Aug-10Damietta & SalamS.&E.Dakahliya 6 31.1.2.6.17 Water Advisory Meeting 1.1 Meeting 1 19-Sep-10 19-Sep-10E.Sharkiya, Ismailia,Salhiya & Qualubiya 10 71.1.2.6.18 Water Advisory Meeting 1.1 Meeting 1 20-Sep-10 20-Sep-10Damietta & SalamS.&E.Dakahliya 10 51.1.2.6.19 Water Advisory Meeting 1.1 Meeting 1 25-Oct-10 25-Oct-10E.Sharkiya, Ismailia,Salhiya & Qualubiya 11 71.1.2.6.20 Water Advisory Meeting 1.1 Meeting 1 27-Oct-10 27-Oct-10Damietta & SalamS.&E.Dakahliya 10 51.1.2.6.21 Water Advisory Meeting 1.1 Meeting 1 5-Dec-10 5-Dec-10E.Sharkiya, Ismailia,Salhiya & Qualubiya 15 01.1.2.6.22 Water Advisory Meeting 1.1 Meeting 1 6-Dec-10 6-Dec-10Damietta & SalamS.&E.Dakahliya 14 61.1.2.6.23 Water Advisory Meeting 1.1 Meeting 1 26-Dec-10 26-Dec-10 Sharkiya + Salhiya 19 01.1.2.6.24 Water Advisory Meeting 1.1 Meeting 1 27-Dec-10 27-Dec-10 Qualubia & Ismailia 22 01.1.2.6.25 Water Advisory Meeting 1.1 Meeting 1 28-Dec-10 28-Dec-10 Damietta & El Salam 13 01.1.2.6.26 Water Advisory Meeting 1.1 Meeting 1 29-Dec-10 29-Dec-10 E.&S.Dakahliya 20 0TOTAL For Task # 1.11656 22352 Annual Report Year 2 (January – December 2010)


International Resources GroupAnnex E: Annual Training ReportTask 1.2: Sustainable Local Financing for Canal andDrain MaintenanceTask # 1.21.2.2.9 IWMD Q.Meeting 1.2 Meeting 1 6-Jan-10 6-Jan-10 W.Sharkiya 8 11.2.2.10 IWMD Q.Meeting 1.2 Meeting 1 13-Jan-10 13-Jan-10 Zifta 9 31.2.2.11 IWMD Q.Meeting 1.2 Meeting 1 6-Feb-10 6-Feb-10 Aswan 13 31.2.2.12 IWMD Q.Meeting 1.2 Meeting 1 13-Apr-10 13-Apr-10 W.Sharkiya 7 21.2.2.13 IWMD Q.Meeting 1.2 Meeting 1 14-Apr-10 14-Apr-10 Zifta 9 21.2.2.14 IWMD Q.Meeting 1.2 Meeting 1 21-Jul-10 21-Jul-10 Zifta &W.Sharkia 17 41.2.2.15 IWMD Q.Meeting 1.2 Meeting 1 22-Sep-10 22-Sep-10 Qena 16 41.2.2.16 IWMD Q.Meeting 1.2 Meeting 1 20-Oct-10 20-Oct-10 Aswan 16 41.2.2.17 IWMD Q.Meeting 1.2 Meeting 1 21-Oct-10 21-Oct-10 W.Sharkiya 7 21.2.2.18 IWMD Q.Meeting 1.2 Meeting 1 24-Oct-10 24-Oct-10 Zifta 9 2TOTAL For Task # 1.2111 27Annual Report Year 2 (January – December 2010) 53


International Resources GroupAnnex E: Annual Training ReportTask 1.3: Water Productivity and EfficiencyTask # 1.31.3.2.1.1Shifting to Grew High Value & Low WaterConsumption Crops 1.3 Workshop 1 18-Feb-10 18-Feb-10 Abo Kebeer 30 01.3.2.1.2Shifting to Grew High Value & Low WaterConsumption Crops 1.3 Workshop 1 2-Mar-10 2-Mar-10 Abo Kebeer 150 01.3.2.1.3Shifting to Grew High Value & Low WaterConsumption Crops 1.3 Training 1 12-May-10 12-May-10 Abo Kebeer 22 01.3.2.1.4 Field Day for Growers of Basil in W.Belbeis 1.3 Field Trip 1 27-May 27-MayGhita Village in W.Belbeis27 01.3.2.1.5 Soil Analysis Workshop 1.3 Workshop 1 7-Jun 7-Jun W.Sharkiya 84 31.3.2.1.6 Shifting to Improved on Farm Irrigation Systems 1.3 Workshop 1 28-Jul 28-Jul Ismailia 19 21.3.2.1.7 Farm Budget 1.3 Training 1 29-Jul 29-Jul Abo Kebeer 22 01.3.2.1.8 Marketing & Contract Negotiation 1.3 Workshop 1 1-Aug 1-AugAbo Kebeer &W.Belbeis22 01.3.2.1.9 Soil Analysis Workshop 1.3 Workshop 1 2-Aug 2-AugAbo Kebeer &W.Belbeis21 01.3.2.1.10 Harvesting Sesame 1.3 Training 1 3-Aug 3-Aug Abo Kebeer 26 01.3.2.1.11 Harvesting Basil 1.3 Training 1 5-Aug 5-Aug W.Belbeis 23 11.3.2.1.12 Winter Season Crops Informative 1.3 Workshop 1 21-Sep 21-SepAbo Kebeer &W.Belbeis60 2TOTAL For Task # 1.3506 854 Annual Report Year 2 (January – December 2010)


International Resources GroupAnnex E: Annual Training ReportTask 2.2: Formation and Development of IntegratedWater Management DistrictsTask # 2.22.2.2.6.1 Maintenance Meeting 2.2 Meeting 1 15-Feb-10 15-Feb-10 Damietta & El Salam 10 42.2.2.6.2 Maintenance Meeting 2.2 Meeting 1 16-Feb-10 16-Feb-10 E.Dakhliya 10 42.2.2.6.3 Maintenance Meeting 2.2 Meeting 1 17-Feb-10 17-Feb-10 S.Dakhliya 7 32.2.2.6.4 Maintenance Meeting 2.2 Meeting 1 18-Feb-10 18-Feb-10 Qualubia 9 42.2.2.6.5 Maintenance Meeting 2.2 Meeting 1 23-Feb-10 23-Feb-10 Ismailia 7 32.2.2.6.6 Maintenance Meeting 2.2 Meeting 1 24-Feb-10 24-Feb-10 E.Sharkiya 7 42.2.2.6.7 Maintenance Meeting 2.2 Meeting 1 25-Feb-10 25-Feb-10 Salhiya 9 32.2.2.21 Directorate M.Meeting 2.2 Meeting 1 26-Jan-10 26-Jan-10 E.Sharkiya+Salhiya 15 22.2.2.22 Directorate M.Meeting 2.2 Meeting 1 27-Jan-10 27-Jan-10 E. & S.Dakahliya 14 42.2.2.23 Directorate M.Meeting 2.2 Meeting 1 28-Jan-10 28-Jan-10 Qualubia 9 02.2.2.24 Directorate M.Meeting 2.2 Meeting 1 28-Jan-10 28-Jan-10 Damietta & El Salam 7 02.2.2.25 Directorate M.Meeting 2.2 Meeting 1 31-Jan-10 31-Jan-10 Ismailia 8 22.2.2.26 Directorate M.Meeting 2.2 Meeting 1 21-Feb-10 21-Feb-10 Ismailia 8 22.2.2.27 Directorate M.Meeting 2.2 Meeting 1 22-Feb-10 22-Feb-10 Damietta & El Salam 7 02.2.2.28 Directorate M.Meeting 2.2 Meeting 1 23-Feb-10 23-Feb-10 E.&S.Dakhliya 12 32.2.2.29 Directorate M.Meeting 2.2 Meeting 1 25-Feb-10 25-Feb-10 E.Sharkiya+Salhiya 14 22.2.2.30 Directorate M.Meeting 2.2 Meeting 1 28-Feb-10 28-Feb-10 Qualubia 9 32.2.2.31 Directorate M.Meeting 2.2 Meeting 1 22-Mar-10 22-Mar-10 Damietta & El Salam 8 02.2.2.32 Directorate M.Meeting 2.2 Meeting 1 23-Mar-10 23-Mar-10 E.&S.Dakhliya 15 42.2.2.33 Directorate M.Meeting 2.2 Meeting 1 25-Mar-10 25-Mar-10 Qualubia 9 12.2.2.34 Directorate M.Meeting 2.2 Meeting 1 28-Mar-10 28-Mar-10 E.Sharkiya+Salhiya 14 22.2.2.35 Directorate M.Meeting 2.2 Meeting 1 29-Mar-10 29-Mar-10 Ismailia 7 12.2.2.36 Directorate M.Meeting 2.2 Meeting 1 20-Apr-10 20-Apr-10 E.Sharkiya+Salhiya 14 22.2.2.37 Directorate M.Meeting 2.2 Meeting 1 21-Apr-10 21-Apr-10 Ismailia 7 12.2.2.38 Directorate M.Meeting 2.2 Meeting 1 22-Apr-10 22-Apr-10 Qualubia 9 02.2.2.39 Directorate M.Meeting 2.2 Meeting 1 27-Apr-10 27-Apr-10 Damietta & El Salam 7 02.2.2.40 Directorate M.Meeting 2.2 Meeting 1 2-May-10 2-May-10 E.&S.Dakhliya 13 32.2.2.41 Directorate M.Meeting 2.2 Meeting 1 16-May-10 16-May-10 E.Sharkiya+Salhiya 14 22.2.2.42 Directorate M.Meeting 2.2 Meeting 1 17-May-10 17-May-10 Ismailia 6 12.2.2.43 Directorate M.Meeting 2.2 Meeting 1 19-May-10 19-May-10 Qualubia 9 02.2.2.44 Directorate M.Meeting 2.2 Meeting 1 31-May-10 31-May-10 Damietta & El Salam 7 02.2.2.45 Directorate M.Meeting 2.2 Meeting 1 27-May-10 27-May-10 E.&S.Dakhliya 14 42.2.2.46 Directorate M.Meeting 2.2 Meeting 1 17-Jun-10 17-Jun-10 E.Sharkiya+Salhiya 14 22.2.2.47 Directorate M.Meeting 2.2 Meeting 1 21-Jun-10 21-Jun-10 Qualubia 9 02.2.2.48 Directorate M.Meeting 2.2 Meeting 1 23-Jun-10 23-Jun-10 Ismailia 7 12.2.2.49 Directorate M.Meeting 2.2 Meeting 1 26-Jun-10 26-Jun-10 E.&S.Dakhliya 14 42.2.2.50 Directorate M.Meeting 2.2 Meeting 1 27-Jun-10 27-Jun-10 Damietta & El Salam 7 02.2.2.51 Directorate M.Meeting 2.2 Meeting 1 19-Jul-10 19-Jul-10 E.Sharkiya+Salhiya 18 22.2.2.52 Directorate M.Meeting 2.2 Meeting 1 20-Jul-10 20-Jul-10 Qualubia 11 02.2.2.53 Directorate M.Meeting 2.2 Meeting 1 22-Jul-10 22-Jul-10 Ismailia 9 22.2.2.54 Directorate M.Meeting 2.2 Meeting 1 28-Jul-10 28-Jul-10 Damietta & El Salam 10 12.2.2.55 Directorate M.Meeting 2.2 Meeting 1 29-Jul-10 29-Jul-10 E.&S.Dakhliya 17 42.2.2.56 Directorate M.Meeting 2.2 Meeting 1 5-Aug-10 5-Aug-10 Damietta & El Salam 10 12.2.2.57 Directorate M.Meeting 2.2 Meeting 1 8-Aug-10 8-Aug-10 E.&S.Dakhliya 17 42.2.2.58 Directorate M.Meeting 2.2 Meeting 1 16-Aug-10 16-Aug-10 E.Sharkia + Salhiya 18 22.2.2.59 Directorate M.Meeting 2.2 Meeting 1 17-Aug-10 17-Aug-10 Qualubia 11 02.2.2.60 Directorate M.Meeting 2.2 Meeting 1 18-Aug-10 18-Aug-10 Ismailia 9 22.2.2.61 Directorate M.Meeting 2.2 Meeting 1 20-Sep-10 20-Sep-10 E.Sharkia + Salhiya 18 22.2.2.62 Directorate M.Meeting 2.2 Meeting 1 22-Sep-10 22-Sep-10 Ismailia 8 22.2.2.63 Directorate M.Meeting 2.2 Meeting 1 23-Sep-10 23-Sep-10 Qualubia 11 02.2.2.64 Directorate M.Meeting 2.2 Meeting 1 22-Sep-10 22-Sep-10 Damietta & El Salam 10 12.2.2.65 Directorate M.Meeting 2.2 Meeting 1 23-Sep-10 23-Sep-10 E.&S. Dakahlia 17 32.2.2.66 Directorate M.Meeting 2.2 Meeting 1 18-Oct-10 18-Oct-10 E.Sharkia + Salhiya 16 22.2.2.67 Directorate M.Meeting 2.2 Meeting 1 19-Oct-10 19-Oct-10 Qualubia 11 12.2.2.68 Directorate M.Meeting 2.2 Meeting 1 20-Oct-10 20-Oct-10 Ismailia 8 22.2.2.69 Directorate M.Meeting 2.2 Meeting 1 18-Oct-10 18-Oct-10 Damietta & El Salam 9 12.2.2.70 Directorate M.Meeting 2.2 Meeting 1 20-Oct-10 20-Oct-10 E.&S. Dakahlia 15 32.2.2.71 Directorate M.Meeting 2.2 Meeting 1 11-Nov-10 11-Nov-10 E.Sharkiya+Salhiya 18 02.2.2.72 Directorate M.Meeting 2.2 Meeting 1 25-Nov-10 Niovember 25 Ismailia 10 02.2.2.73 Directorate M.Meeting 2.2 Meeting 1 28-Nov-10 28-Nov-10 Qualubia 12 02.2.2.74 Directorate M.Meeting 2.2 Meeting 1 24-Nov-10 24-Nov-10 E.&S. Dakahlia 17 32.2.2.75 Directorate M.Meeting 2.2 Meeting 1 25-Nov-10 25-Nov-10 Damietta & El Salam 10 12.2.2.76 Directorate M.Meeting 2.2 Meeting 1 22-Dec-10 22-Dec-10 Damietta & El Salam 10 12.2.2.77 Directorate M.Meeting 2.2 Meeting 1 23-Dec-10 23-Dec-10 E.&S. Dakahlia 17 32.2.2.78 Directorate M.Meeting 2.2 Meeting 1 23-Dec-10 23-Dec-10 E.Sharkia + Salhiya 18 02.2.2.79 Directorate M.Meeting 2.2 Meeting 1 28-Dec-10 28-Dec-10 Qualubia 12 02.2.2.80 Directorate M.Meeting 2.2 Meeting 1 29-Dec-10 29-Dec-10 Ismailia 10 02.2.2.15.1 Internal Local Basic Computer Skills 2.2 Class 3 15-Jun-10 17-Jun-10 Qualubia 11 92.2.2.15.2 Internal Local Basic Computer Skills 2.2 Class 3 20-Jun-10 22-Jun-10 Qualubia 8 119 102.2.2.16.1 Internal Local Internet Basic Skills 2.2 Class 2 18-Sep-10 19-Sep-10 Qualubia 9 62.2.2.16.2 Internal Local Internet Basic Skills 2.2 Class 2 20-Sep-10 21-Sep-10 Qualubia 8 3TOTAL For Task # 2.2808 143Annual Report Year 2 (January – December 2010) 55


International Resources GroupAnnex E: Annual Training ReportTask 2.3: Establishment of Information ManagementSystems for Sustainable Water ResourcesManagementTask # 2.32.3.2.8.1 Computer Maintenance 2.3 Class 2 3-Jan-10 4-Jan-10 Damietta & El Salam 16 82.3.2.8.2 Computer Maintenance 2.3 Class 3 10-Jan-10 12-Jan-10 Qualubiya 21 122.3.2.8.3 Computer Maintenance 2.3 Class 2 16-Jan-10 17-Jan-10 E.Dakhliya 18 82.3.2.8.4 Computer Maintenance 2.3 Class 2 18-Jan-10 19-Jan-10 S.Dakhliya 13 32.3.2.8.5 Computer Maintenance 2.3 Class 2 27-Jan-10 28-Jan-10 Salhiya 18 42.3.2.8.6 Computer Maintenance 2.3 Class 2 31-Jan-10 2-Feb-10 Ismailia 16 82.3.2.8.7 Computer Maintenance 2.3 Class 2 2-Feb-10 3-Feb-10 E. Sharkiya 15 72.3.2.17.1 Follow-Up of Water Level & Complaints DB 2.3 Class 2 1-Mar-10 1-Mar-10 E.Sharkiya 12 42.3.2.17.2 Follow-Up of Water Level & Complaints DB 2.3 Class 2 4-Mar-10 4-Mar-10 Salhiya 16 72.3.2.17.3 Follow-Up of Water Level & Complaints DB 2.3 Class 2 14-Mar-10 14-Mar-10 Damietta & El Salam 15 82.3.2.17.4 Follow-Up of Water Level & Complaints DB 2.3 Class 2 15-Mar-10 15-Mar-10 E.Dakhliya 15 42.3.2.17.5 Follow-Up of Water Level & Complaints DB 2.3 Class 2 16-Mar-10 16-Mar-10 S.Dakhliya 12 32.3.2.17.6 Follow-Up of Water Level & Complaints DB 2.3 Class 2 22-Mar-10 22-Mar-10 Ismailia 14 72.3.2.17.7 Follow-Up of Water Level & Complaints DB 2.3 Class 2 24-Mar-10 24-Mar-10 Qualubia 19 82.3.2.5.1 Current Meters 2.3 Class 2 18-Jan-10 19-Jan-10 Damietta & El Salam 25 62.3.2.5.2 Current Meters 2.3 Class 2 20-Jan-10 21-Jan-10 Qualubia 33 32.3.2.5.3 Current Meters 2.3 Class 2 24-Jan-10 26-Jan-10 E.Dakhliya 33 62.3.2.5.4 Current Meters 2.3 Class 2 27-Jan-10 28-Jan-10 S.Dakhliya 21 52.3.2.5.5 Current Meters 2.3 Class 2 1-Feb-10 2-Feb-10 E.Sharkiya 23 32.3.2.5.6 Current Meters 2.3 Class 2 3-Feb-10 4-Feb-10 Salhiya 31 22.3.2.5.7 Current Meters 2.3 Class 2 7-Feb-10 8-Feb-10 Ismailia 27 62.3.2.7.1 Water Distribution Methods & Procedures 2.3 Class 1 14-Mar-10 14-Mar-10 E.Dakhliya 9 22.3.2.7.2 Water Distribution Methods & Procedures 2.3 Class 1 16-Mar-10 16-Mar-10 Damietta&El Salam 8 52.3.2.7.3 Water Distribution Methods & Procedures 2.3 Class 1 15-Mar-10 15-Mar-10 S.Dakhliya 6 42.3.2.7.4 Water Distribution Methods & Procedures 2.3 Class 1 17-Mar-10 17-Mar-10 Qualubia 8 32.3.2.7.5 Water Distribution Methods & Procedures 2.3 Class 1 18-Mar-10 18-Mar-10 Ismailia 7 42.3.2.7.6 Water Distribution Methods & Procedures 2.3 Class 1 21-Mar-10 21-Mar-10 Salhiya 9 32.3.2.7.7 Water Distribution Methods & Procedures 2.3 Class 1 22-Mar-10 22-Mar-10 E.Sharkiya 7 32.3.2.8.1 Water Quality Monitoring 2.3 Class 1 11-Jul-10 12-Jul-10 Damietta&El Salam 21 52.3.2.8.2 Water Quality Monitoring 2.3 Class 1 13-Jul-10 14-Jul-10 S.Dakhliya 17 52.3.2.8.3 Water Quality Monitoring 2.3 Class 1 18-Jul-10 19-Jul-10 E.Dakahlia 14 42.3.2.8.4 Water Quality Monitoring 2.3 Class 1 20-Jul-10 21-Jul-10 E.Dakahlia 14 42.3.2.8.5 Water Quality Monitoring 2.3 Class 1 25-Jul-10 26-Jul-10 Qualubia 15 32.3.2.8.6 Water Quality Monitoring 2.3 Class 1 27-Jul-10 28-Jul-10 Qualubia 12 12.3.2.8.7 Water Quality Monitoring 2.3 Class 1 1-Aug-10 2-Aug-10 Salhiya 14 12.3.2.8.8 Water Quality Monitoring 2.3 Class 1 3-Aug-10 4-Aug-10 Salhiya 10 22.3.2.8.9 Water Quality Monitoring 2.3 Class 1 8-Aug-10 9-Aug-10 E.Sharkia 19 32.3.2.8.10 Water Quality Monitoring 2.3 Class 1 10-Aug-10 11-Aug-10 Ismailia 22 82.3.2.1.4 Digital Mapping 2.3 Class 4 31-Jan-10 3-Feb-10 E.Dakhliya 14 22.3.2.1.5 Digital Mapping 2.3 Class 4 10-Jan-10 13-Jan-10 E.Dakhliya 15 72.3.2.1.6 Digital Mapping 2.3 Class 4 24-Jan-10 26-Jan-10 Qualubia 15 82.3.2.1.7 Digital Mapping 2.3 Class 4 31-Jan-10 3-Feb-10 E.Dakhliya 14 32.3.2.1.8 Digital Mapping 2.3 Class 4 8-Feb-10 11-Feb-10 Qualubia 15 32.3.2.1.9 Digital Mapping 2.3 Class 4 15-Feb-10 18-Feb-10 Ismailia 10 42.3.2.1.10 Digital Mapping 2.3 Class 4 22-Feb-10 25-Feb-10 Ismailia 10 42.3.2.1.11 Digital Mapping 2.3 Class 4 1-Mar-10 4-Mar-10 S.Dakhliya 17 92.3.2.1.12 Digital Mapping 2.3 Class 4 7-Mar-10 3-Mar-10 Salhiya 1 12 42.3.2.1.13 Digital Mapping 2.3 Class 4 13-Mar-10 16-Mar-10 Salhiya 2 15 32.3.2.15.1 Internal Local Digital Map Training 2.3 Class 3 6-Jun-10 8-Jun-10 E.Dakhliya 6 02.3.2.3.1 Water Flow Calibration 2.3 Class 2 8-Dec-10 9-Dec-10 Qualubia 16 32.3.2.3.2 Water Flow Calibration 2.3 Class 2 11-Dec-10 12-Dec-10 Ismailia 13 42.3.2.3.3 Water Flow Calibration 2.3 Class 2 13-Dec-10 14-Dec-10 Damietta & El Salam 14 22.3.2.3.4 Water Flow Calibration 2.3 Class 2 15-Dec-10 16-Dec-10 Salhiya 15 52.3.2.3.5 Water Flow Calibration 2.3 Class 2 22-Dec-10 23-Dec-10 Sharkiya 15 32.3.2.3.6 Water Flow Calibration 2.3 Class 2 27-Dec-10 28-Dec-10 E.Dakahlia 17 42.3.2.3.7 Water Flow Calibration 2.3 Class 2 29-Dec-10 30-Dec-10 S.Dakahlia 11 42.3.2.17.1 Water Quality Database 2.3 Class 2 4-Dec-10 5-Dec-10 Damietta & El Salam 10 82.3.2.17.2 Water Quality Database 2.3 Class 2 8-Dec-10 9-Dec-10 E.Dakahlia 10 32.3.2.17.3 Water Quality Database 2.3 Class 2 18-Dec-10 19-Dec-10 E.Sharkia 7 22.3.2.17.4 Water Quality Database 2.3 Class 2 20-Dec-10 21-Dec-10 Salhiya 9 32.3.2.17.5 Water Quality Database 2.3 Class 2 22-Dec-10 23-Dec-10 S.Dakahlia 7 52.3.2.17.6 Water Quality Database 2.3 Class 2 26-Dec-10 27-Dec-10 Qualubia 10 32.3.2.17.7 Water Quality Database 2.3 Class 2 28-Dec-10 29-Dec-10 Ismailia 8 22.3.2.13.1 Ground Water Monitoring 2.3 Class 2 6-Nov-10 7-Nov-10 Qualubia 27 82.3.2.13.2 Ground Water Monitoring 2.3 Class 2 29-Nov-10 30-Nov-10 E.Sharkia 17 52.3.2.13.3 Ground Water Monitoring 2.3 Class 2 5-Dec-10 6-Dec-10 Salhiya 20 62.3.2.13.4 Ground Water Monitoring 2.3 Class 2 15-Dec-10 16-Dec-10 Ismailia 20 52.3.2.13.5 Ground Water Monitoring 2.3 Class 2 18-Dec-10 19-Dec-10 Damietta & El Salam 22 82.3.2.15.1 Water Distribution Meeting 2.3 Meeting 1 9-Aug-10 9-Aug-102.3.2.15.2 Water Distribution Meeting 2.3 Meeting 1 10-Aug-10 10-Aug-102.3.2.15.3 Water Distribution Meeting 2.3 Meeting 1 28-Sep-10 28-Sep-102.3.2.15.4 Water Distribution Meeting 2.3 Meeting 1 29-Sep-10 29-Sep-102.3.2.15.5 Water Distribution Meeting 2.3 Meeting 1 26-Oct-10 26-Oct-102.3.2.15.6 Water Distribution Meeting 2.3 Meeting 1 28-Oct-10 28-Oct-10TOTAL For Task # 2.3E.Sharkiya, Ismailia,Salhiya & Qualubiya 4 1Damietta & SalamS.&E.Dakahliya 6 4E.Sharkiya, Ismailia,Salhiya & Qualubiya 5 1Damietta & SalamS.&E.Dakahliya 6 5E.Sharkiya, Ismailia,Salhiya & Qualubiya 9 5Damietta & SalamS.&E.Dakahliya 11 51077 33356 Annual Report Year 2 (January – December 2010)


International Resources GroupAnnex E: Annual Training ReportTask 2.4: Capacity Building of MWRI PersonnelIDCodeCourse TitleTypeTargetGroupDur.DaysNo. ofPart.No. ofFem.Venue2.4.1 M.S. in Environmental Engineering Graduate Degree MWRI Staff 2 Years 6 1 AUC2.4.2 M.S. in Environmental Engineering Graduate Degree MWRI Staff 2Years 14 8 Egyptian Universities2.4.3 Overseas Study Tour to Turkey Study Tour MWRI Staff 7 days 13 3 TurkeyMonitoring and EvaluationNone at this timeCross Cutting TaskPublic Awareness & Communication0.2.2.1 Mastering Final Cut Pro 7 Video Editing C.C Class 10 29-Nov-10 31-Dec-10 WCU - MWRI- Cairo 5 00.2.2.2 Information System Data Management C.C Workshop 1 16-Dec-10 16-Dec-10 East Delta Region 59 5TOTAL For C.C Task64 5Annual Report Year 2 (January – December 2010) 57


International Resources GroupAnnex F: Procurement Status ReportANNEX F: PROCUREMENTSTATUS REPORTYear 2(January – December 2010)58 Annual Report Year 2 (January – December 2010)


International Resources GroupAnnex F: Procurement Status ReportTable of TablesTable 7: Project Office Setup/Equipment (Cairo and Regional Offices) ............................... 60Table 8 Procurements for IWRM II Field Sites and MWRI Other Support Offices ...............61Annual Report Year 2 (January – December 2010) 59


International Resources GroupAnnex F: Procurement Status ReportTable 7: Project Office Setup/Equipment (Cairo and Regional Offices)Item Description Qty Actual Qty Unit (EGP)Office Set-Up and Equipment (Cairo and Regional Offices)Total(EGP)ActualCost(EGP)US/LocalStatusCairo Office Set-upRegional Offices Set-UpMinor refurbishment including plumbing fixtures and partitions,blinds. Equipment including phone switchboard, filing cabinets;paper shredders, shelves, boards, chairs, etc.1 shredder,1 safe, 2filingcabinets 50,000 50,000 4,740 Local As Required1Minor refurbishment including plumbing fixtures and partitions,blinds. Furniture including desks, chairs, tables. Equipmentincluding phone switchboard, fax, filing cabinets; shelving 2 2 25,000 50,000 20,817 Local As RequiredTelephone System Cairo Off System for 18 extensions1 15,000 15,000Photocopier - Cairo Office Network photocopier 1 1 56,900 56,900 56,900 Local CompletedPhotocopier - Reg. Office Small Office Copier 2 2 20,000 40,000 36,318 Local CompletedSubtotal 211,900 118,775Computer Equipment New and Upgrades (Cairo and Regional Offices)Cairo Office LAN 1 15,000 15,000Regional Office LAN 2 3,500 7,000Desktop computer (local) New or upgrade of existing 5 5 4,300 21,500 21,590 Local As RequiredUninterrupted Power Supply New or upgrade of existing 5 4 440 2,200 2,200 localNotebook Computer (local) New or upgrade of existing 5 2 14,500 72,500 40,527 Local As RequiredSmall scanner New or upgrade of existing 3 2 1,000 3,000 800 Local As RequiredA3/A4 Network printer New or upgrade of existing 1 2 15,000 15,000 3,000 Local CompletedDesk-top network printer New or upgrade of existing 3 3,750 11,250Color Laser jet printer New or upgrade of existing 1 1 20,000 20,000 2,700 Local CompletedStand-alone printer New or upgrade of existing 4 1 2,500 10,000 490 localAO Printer New or upgrade of existing 2 20,000 40,000Color ink-jet printer New or upgrade of existing 4 2 3,500 14,000 2,250 Local As RequiredOffice Software New or upgrade of existing 10 1,500 15,000Publication Software New or upgrade of existing 2 5,000 10,000GIS Software 4 10,000 40,000USB Flash Memory Stick 6 400 2,400External Hard Drive 6 4 860 5,160 3,440 Local As RequiredTape backup Drive 4 5,000 20,000Subtotal 324,010 76,997Training EquipmentOverhead Projector New or upgrade of existing 3 1,000 3,000VCR New or upgrade of existing 3 1,000 3,000Digital Video Camera New or upgrade of existing 1 8,000 8,000Data Projector New or upgrade of existing 1 8,000 8,000Projector Screen New or upgrade of existing 2 1,000 2,000Flip Chart Stand New or upgrade of existing 3 350 1,050Digital Camera, small New or upgrade of existing 3 1 3,000 9,000Digital Camera, High Quality New or upgrade of existing1 7,000 7,000TV Monitor, Receiver New or upgrade of existing 3 1 3,750 11,250Subtotal 52,300 0Vehicles PurchaseThree vehicles Cairo Purchase 3 2 226,270 678,810 323,425 Local As RequiredOne vehicle Zagazig Purchase 1 1 226,270 226,270 145,750 Local CompletedOne vehicle Mansoura Purchase 1 1 226,270 226,270 145,750 Local CompletedSubtotal 1,131,350 614,925Total 1,719,560 810,69760 Annual Report Year 2 (January – December 2010)


International Resources GroupAnnex F: Procurement Status ReportTable 8 Procurements for IWRM II Field Sites and MWRI Other Support OfficesTotal Total Total CostUS/No.ItemQty Actual LE USD Local Status1 Computer Equipment and1-1.1 Standard Computer 130 130 369595 0 local Yr 11-1.2 Standard Computer 0 20 70615 0 local Yr 21-2.1 Database Computer 66 66 189230 0 local Yr 11-2.2 Database Computer 9 1 3070 0 local Yr 21-2.2 Computer (Apple) 3 3 44139 0 local Yr 21-3.1 Laptop 11 12 77420 0 local Yr 11-3.2 Laptop 4 4 20000 0 local Yr 21-3.2 Laptop (Apple) 1 1 17495 0 local Yr 21-3.3 Laptop (Apple) 1 1 20000 0 local Yr 21-5.1 Ink Color Printer (A3) 63 64 78473 0 local Yr 11-5.2 Ink Color Printer (A3) 2 2 3400 0 local Yr 21-6 Desk Jet Printer 12 10 14545 0 local Yr 11-8.1 Laser Printer (A4) 62 65 100602 0 local Yr 11-8.2 Laser Printer (A4) 3 3 100602 0 local Yr 21-9 Scanner (A4) 58 59 25168 0 local Yr 11-10.2 Scanner (A3) 1 1 9400 0 local Yr 21-11.1 USB Hard Drive 70 76 33759 0 local Yr 11-11.2 USB Hard Drive 3 3 1500 0 local Yr 21-12.1 Smart UPS 188 188 22278 0 local Yr 11-12.2 Smart UPS 3 3 8700 0 local Yr 21-13.1 Table (computer) 178 222 33180 0 local Yr 11-13.2 Table (computer) 16 13 1820 0 local Yr 21-14.1 Chair 183 282 54680 0 local Yr 11-15.2 USB Flash Drive (16 MB) 4 4 1000 0 local Yr 22 Office Equipment2-1.1 Air-conditioning (3 HP) 60 60 226800 0 local Yr 12-1.2 Air-conditioning (3 HP) 21 21 226800 0 local Yr 22-3.1 Photocopier 59 60 588000 0 local Yr 12-4.1 Fax Machine 60 59 80778 0 local Yr 12-7.2 Table 1 1 675 0 local Yr 22-8.2 Chair 4 4 4000 0 local Yr 22-9.1 O&M Expendables 58 58 14500 local Yr 12-9.2 O&M Expendables 58 58 174000 local Yr 23 Training Equipment3-1 Flip Chart and Stand 58 58 27258 0 local Yr 13-2.2 TV 9 9 32850 0 local Yr 23-4 Laptop 4 4 20000 0 local Yr 23-6.1 Furniture 62 62 130200 0 local Yr 23-6.2 Furniture 1 1 1150 0 local Yr 23-7 White Board 58 59 6726 0 local Yr 23-8.1 Digital Camera (>=5 MB) 65 66 0 5114 US Yr 13-8.3 Digital Camera (>=5 MB) 5 4000 0 local Yr 23-9 Sony 950 HD Camera 1 1 0 8930 US Yr 13-10 Cannon Digital w lens 1 6798 US Yr 13-11.2 LCD Monitor (Sony) 1 1 16500 8930 US Yr 23-13.1 Data Show and screen 20 21 107100 0 local Yr 13-13.2 Data Show and screen 1 1 5000 0 local Yr 24 Local Area Network Equipment4-1/2 Wireless Router (4 ports)/DSL Modem 58 58 24190 0 local Yr 15 Mapping Equipment5-1 GPS 110 120 0 21014 US Yr 15-2 GIS Computer 4 4 16500 0 local Yr 15-3.2 Satellite Images 1 1 11400 0 local Yr 26 Water Flow Monitoring Equipment6-1.1 Fiber Glass Boat 53 53 180200 0 local Yr 16-1.2 Fiber Glass Boat 4 4 13600 0 local Yr 26-2 Winch + Tagline (Depth Meter) 61 61 290970 0 local Yr 16-3 Winch + Tagline (Bank to Bank) 61 61 157380 0 local Yr 16-4 Stop Watch 61 61 15860 0 local Yr 16-4.1 Sounding weights local made 25 Lbs 61 61 28060 0 Yr 16-5.1 Current Meter & LCD Digital 61 61 0 84180 US Yr 16-9.1 Data Logger Modem (Samba) 10 10 13273 0 local Yr 16-12.1 Data Logger Modem (air link) 18 18 59994 0 local Yr 15-3 Satellite Images - Maps - Software 0 0 0 Yr 26-10.1 Data Logger 10 10 133992 0 local Yr 16-10.2 Data Logger 8 8 109600 0 local Yr 26-11 Data Logger Camera 2 1 20311 0 local Yr 16-8.2 GW Measure Tape 53 60 26500 0 Yr 26-9.2 Data Logger Modem (Air Link) 8 7 26425 0 local Yr 27 Water Quality Monitoring Equipment7-2 PH Conductivity Do TM 55 55 0 90750 US Yr 18 Training Center Equipment8-1 Standard Computer 48 48 136466 0 local Yr 18-2 Laptop 19 20 51000 0 local Yr 18-4 All-in-one B&W Laser Printer (A4) 8 8 24720 0 local Yr 18-5 USB Hard Drive 8 8 4000 0 local Yr 18-6 Smart UPS 48 47 55601 0 local Yr 18-7 Table 48 6 9600 0 local Yr 18-8.1 Chair 48 99 54680 0 local Yr 18-8.2 Chair 630 891 63341 0 local Yr 29 GDA Yr 29-1.2 Shredder 2 2 20000 0 local Yr 2Shipping Costs 7536Total Cost EGP 4,514,671 $233,251Annual Report Year 2 (January – December 2010) 61


International Resources GroupAnnex F: Procurement Status ReportU.S. Agency for International Development1300 Pennsylvania Avenue, NWWashington, DC 20523Tel: (202) 712-0000Fax: (202) 216-3524www.usaid.govAnnual Report Year 2 (January – December 2010) 1