12.07.2015 Views

Form WWO 46

Form WWO 46

Form WWO 46

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

W The Water Authority<strong>Form</strong> Serial No. …………………….43/F Immigration Tower, 7 Gloucester Road, Hong Kong. (for official use)Tel : 2824 5000 Fax : 2802 7333 email : wsdinfo@wsd.gov.hkPart IV (To be completed by the Licensed Plumber) (see Note 6)(For new building project, also to be signed by the Applicant and the Authorized Person)To the Water Authority,ASN : ……………………* Whole of the plumbing / Part of the plumbing (please specify and submit relevant drawings :______________________________________________________) covered by this <strong>Form</strong> was completed on _________________.Your inspection and approval of the plumbing is requested. * I also undertake the correctness of the meter positions ofthe *whole of the plumbing / part of the plumbing mentioned above.(Signature of the Licensed Plumber in Part I)Date :* I am satisfied with the correctness of the meter positions indicated above by the Licensed Plumber.(Signature of the Applicant of new building project)Date :* I am satisfied with the correctness of the meter positions indicated above by the Licensed Plumber.(Signature of the Authorized Person)Date :<strong>WWO</strong> <strong>46</strong>(6/2012)*delete whichever is not applicable

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!