Views
2 years ago

Bid Book - Dublin City, Ohio

Bid Book - Dublin City, Ohio

CONTRACTORSignature________________________________________________________________Printed Name: ___________________________________________________________Title: ___________________________________________________________________Date: ___________________________________________________________________III.ADDITIONAL CONTRACT DOCUMENTS5413‐006.0‐CIP

A. CITY OF DUBLIN/CONTRACTOR AGREEMENTSTANDARD AGREEMENTCITY OF DUBLIN, OHIOI. INTRODUCTIONThis Agreement is entered into on , by and between the CITY OF DUBLIN, Ohio (“Owner”),located at 5200 Emerald Parkway, Dublin, Ohio 43017 , and (“Contractor’), located at for theCITY OF DUBLIN 2013 STORM STRUCTURE MAINTENANCE PROJECT (“Project”).THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES. CONSULTATION WITH AN ATTORNEYIS ENCOURAGED WITH RESPECT TO ITS EXECUTION, COMPLETION AND MODIFICATION.The Owner, a political subdivision of the State of Ohio, and the Contractor have entered into thisOwner‐Contractor Agreement (“Agreement”) as of the date set forth above. The Owner and theContractor agree as follows:1 WORK.1.1 The Contractor shall furnish all the labor, services, materials, plant, equipment,tools, scaffolds, appliances, transportation, and all other things (collectively called the “Work”)necessary for the timely and proper completion of the Work described in the Contract Documentsfor the Project. The Contractor shall provide the Performance and Payment Bonds on the formsand in the manner described in the Contract Documents.1.2 CLEANUP. Contractor shall cleanup, repair, restore and otherwise return any site orlocation provided by Owner to the condition in which it was delivered to Contractor. Contractorshall repair, at its sole expense, any property it damages, whether part of the work or not, to acondition acceptable to Owner.1.3 COMPLETION. The Project shall be finally completed by: October 15, 2013. TheContractor shall at all times furnish sufficient skilled workers, materials, and equipment to performthe Work in strict conformance with the Contract Documents and to the entire satisfaction of theOwner, so as to complete the Project by the Date for Final Completion. All materials andequipment provided shall be new, free from all defects, fit for the purpose for which intended, andmerchantable.1.4 SUPERVISION. The Contractor shall assign a competent Project Supervisor who shallbe present on site. At the Owner’s request and without additional charge to Owner, the Contractorshall replace the Project Supervisor. The Owner’s Representative shall not be responsible for theacts or omissions of the Project Supervisor or his assistants. At a minimum, the Project Supervisorshall be present on site whenever any Contractor or Subcontractor personnel are present on site.1.5 TAXES AND FEES. Contractor is subject to and responsible for paying fees to obtainall applicable licenses, permits, and other permissions necessary to perform its obligations under5513‐006.0‐CIP

Download the Landscape Requirement Guide - Dublin City, Ohio
IFEA World Festival and Event City Award - Dublin City, Ohio
SECTION 153.157 Political Signs - Dublin City, Ohio
Career Link 2012 Book - DCU - Dublin City University
Proposed Site Layout - Dublin City, Ohio
What's Your Bid? - AFSCME
What is on this winter in Dublin - Dublin City Council
Untitled - Dublin City Council
Dublin City University - Qualifax
Dublin City Council - RealVNC
To read the full document click here - Dublin City Business Association
AUTUMN 2012 - Dublin City Council
advice series - Dublin City Council
Dublin City Biodiversity Action Plan 2008 – 2012 - Dublin City Council
Dublin City University Postgraduate Programmes 2012 - DCU
50 Things to do in Dublin - Dublin City Business Association
Draft PRS 291111 web.pub - Dublin City Council
The Plan Appendix C.pdf - Dublin City Council
Bricks - A Guide to the Repair of Historic Brickwork - Dublin City ...
Developing a Knowledge City Region - Dublin Chamber of Commerce
A City Region on the Move - Dublin Chamber of Commerce
The Gathering Festivals and Events 2013 - Dublin City Council
Energy Efficiency in Traditional Buildings - Dublin City Council
A Guide to the Repair of Historic Roofs - Dublin City Council