Views
2 years ago

Glow Energy Plc. Results of Q1-2011 13 May 2011

Glow Energy Plc. Results of Q1-2011 13 May 2011

Projects under

Projects under consideration: Houay Ho Expansion - LaosLocation:Target:Type:Contracts:Status:TIC:Attapeu Province, Laos PDRTo enhance the profitability and usage rate ofexisting Houay Ho reservoir and transmissionlineNew run-of-river hydro power plant projectclose to HHPC, based on joint operationscheme, capacity increase ca. 100 MWTarget to extend the existing Concession(GoL) and PPA (EGAT)MoU with GoL to conduct full feasibility studysigned in March 2010Consultants for pre-engineering, feasibilitystudy, EIA, topographic survey, and UXOclearance have started works during Q2/2010.Estimated 220 MUSDHouay HoGlow 26

Projects under consideration: wind farmLocation:Target:Type:Contracts:Status:TIC:North-East ThailandTo utilise the high tariff guaranteed by theGovernment and to diversify energyproduction to renewablesWind Farm with capacity of ca. 100 MWAlternatives sought due to land rightchallenges by a) partnering with otherdeveloper(s) and/or b) identifying new sitesin different locationsPPA (EGAT)• Further study to determine the mostfeasible size on-going.• Pre-feasibility assessment ongoing forprojects proposed by potential partners.• Site selection study ongoing foralternative sites (TE)To be determined, based on final sizingGlow 27

FINANCIAL RESULTS Q1 2011 - Statkraft
Results and activities in Q1 2011 - Ina
2012/13 Q1 Results Presentation - Lenovo
Result presentation Q1 2011 - Wärtsilä
Q1 FY2012/13 Results - Singapore Post
Quarterly Results Q1 (Apr-Jun'13) - Hero MotoCorp
3 Q1 2011 Financial results - Euler Hermes
Financial results Q1 2011 - Stora Enso
Interim Results 2011 - First Property Group plc
2011 Annual Report - Cairn Energy PLC
Cairn Energy PLC Corporate Responsibility Report 2011
Cairn Energy PLC Preliminary Results Presentation ... - The Group
Cairn Energy PLC Half Year Results Presentation ... - The Group
Ophir Energy plc Annual Report and Accounts 2011
Interim Results 2011 - First Property Group plc
Tullow Oil plc - 2011 Full year Results
Derwent London plc Interim results 2011 announcement
Q1 2013 Results - Millicom
Q1 2013 Results - DADA
Cairn Energy PLC Half Year Results Presentation 24 ... - The Group
2011 Half-yearly report PDF 6.20MB - Cairn Energy PLC
Cairn Energy PLC Investor Presentation September 2011 - The Group
Half Year Results to 30 April 2011 - Chemring Group PLC
Tullow Oil plc 2011 Full Year Results presentation - 14 ... - The Group