Views
2 years ago

Download this case study as a PDF file - Fast React

Download this case study as a PDF file - Fast React

Download this case study as a PDF file - Fast

Case Study Ref: Fast React_Evolve_Case Study_DewhirstDewhirst achievesimproved customerservice.Marks and Spencer supplier Dewhirst have achievedimproved customer service, speed of response and lowerstock holding, through the implementation of the Fast Reactplanning system.The SolutionDewhirst has implemented Fast React Evolve to provide fully integratedsupply chain planning, critical path management, flow reporting and rawmaterials visibility in a single coordinated system linked to and workingwith the existing JD Edwards business system.This combination allows the impact of changes in any one area, suchas sample approvals, flow requirements, raw materials availability andcurrent production performance to be immediately reflected in otherareas, providing clear notification of priority changes and a clear warningof potential problems.Glenn Walker, Finance Director at Dewhirst explains, “Fast React Evolvehas enabled the closer coordination of functions within the business andthis has facilitated a better materials planning process.“This has directly resulted in the stockholding on materials beingreduced by 40-50% (25-30 days stockholding down to an average of 15days), at the same time as improving the raw material availability to theproduction floor.“Fast React Evolve was surprisingly easy to install, and we have beenvery impressed with the robustness and functionality provided by thesoftware. Given the Fast React pedigree we expected a good planningsystem, but the flexibility and control provided by the Evolve’s CriticalPath system was an unexpected bonus.”The ConclusionAndrew Brown, Managing Director, Fast React Systems comments:“We understand the garment industry at a ground level and haveconsequently built very flexible planning solutions, which meet the needsof a wide variety of garment businesses.Key facts at a glanceCustomer:Dewhirst MenswearTailoringLocation:UKChallenge:To improve ontime delivery andcustomer serviceROI:Increased sales andreduced operating costsincluding inventoryreductions by 40-50%“Fast React has provided Dewhirst with a solution that presents theirproduction planning, critical path and material delivery flows in a visualand easy to use format, which is essential when aiming to offer trueflexibility and level of customer service necessary to stay competitive intoday’s business environment.”Fast React Systems Ltd – EuropeTel: +44 (0)1332 668942Email: info@fastreact.com Web: www.fastreact.comFast React Systems Ltd – AsiaTel: +66 (0)2 664 3326Email: info.asia@fastreact.com Web: www.fastreact.com

Download a pdf of this Case Study - Archistoric
Download the case study (pdf) - Sustrans
Download the case study as PDF - TA Hydronics
download case study - Lithium
Download full case study pdf - GS1 UK
Download case study in pdf format - FARO Asia
Download the full case study PDF - GS1 UK
Download full case study as pdf - FARO Asia
Download Case Study - Serco
Download this case study in full - Attenda
Download file as PDF - HFW
Download Case Study - Fusion-io
Download This Case Study (PDF) - Camfil APC
Download This Case Study (PDF) - Camfil APC
download pdf of case study - iLight Technologies
Download Case Study (PDF) - by LightPointe
Download the HELP Pain Medical Network Case Study PDF - AVI-SPL
download case study - Lithium
download case study - Lithium
Download case study - The Data Chain
Download This Case Study (PDF) - Camfil APC
Download full case study pdf - GS1 UK
to download a pdf version of our employer case studies.
Download file as PDF - HFW
Download file (PDF) - SSINA