12.07.2015 Views

Avanta open vent boiler installation and service guide

Avanta open vent boiler installation and service guide

Avanta open vent boiler installation and service guide

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Remeha <strong>Avanta</strong>3.2 MaintenanceTo conduct maintenance:Ensure that a <strong>service</strong> gasket set <strong>and</strong> new ignition/ionisationelectrode is available before carrying out this procedure.• Isolate power supply at the fused spur before carrying outany work on the <strong>boiler</strong>.230 V1. Open the <strong>boiler</strong>• Isolate the 230 V supply at the switched spur <strong>and</strong> removethe fuse• Isolate the gas supply at the <strong>boiler</strong> gas valve• Remove the front panel - release the two screws at the bottomof the front panel, pull the bottom of the panel towardsyou from the centre, making sure that the plastic catch isreleased from the central display.211fig. 54Open the <strong>boiler</strong>59970LTGBW7H03842

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!