12.07.2015 Views

01.10.2010 Corporate presentation - TAURON Polska Energia

01.10.2010 Corporate presentation - TAURON Polska Energia

01.10.2010 Corporate presentation - TAURON Polska Energia

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Emissions3Generation business positioned for growth(cont.)Attractive brownfield sites……and proven management track record in the executionof newbuild projectsNew Łagisza block (460 MW): Case Study• High efficiency 460 MW with supercriticalcirculating fluidized-bed (CFB) boiler– First ever block of this kind built globally– Recognized ―clean coal‖ state-of-the-arttechnology fully compliant with EU’sBAT requirements– High fuel flexibility: allows biomass andcoal residues co-firing• Seamless project execution<strong>TAURON</strong> Power Plant<strong>TAURON</strong> CHPsTransmission linesExistingUnder construction750 kV 400 kV 220 kVSubstations– Financing originated and secured– 42 months construction period– Top contractors: Foster Wheeler andAlstom• Location in the attractive, industrialized and densely populatedregion of southern Poland in close proximity to:• Significant improvement of key technical andenvironmental parameters– Hard coal depositsOld 120 MWNew 460 MW– Well developed transmission grid– Large industrial power off-takers• The proximity of the most developed part of Poland’s transmissionsystem:– Increases the reliability of existing operations– Reduces costs and time required to carry out the plannedinvestment projects compared to greenfield developmentsGrossefficiencyashSO 2NOx36.4%0.22kg/MWh8.51kg/MWh2.23kg/MWh+8.6%- 60%- 93%- 73%45.0%0.09kg/MWh0.6kg/MWh0.6kg/MWhCO 2950kg/MWh- 21%750kg/MWh18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!